Table of Contents
ToggleMove the Rack with the Right Equipment
A loaded rack is 500-800kg. Don’t push it on its casters. Use proper moving equipment.
| Equipment | Capacity | Use For | Price |
|---|---|---|---|
| Furniture dolly | 300kg | Small racks, unloaded | $45 |
| Appliance dolly | 500kg | Loaded 22U rack | $85 |
| Forklift | 1000kg+ | Loaded 42U rack | Rent ($50/day) |
Rules
- Remove heavy top equipment before moving.
- Strap the rack to the dolly (don’t let it tip).
- Move slowly over flat surfaces. Watch for doorways, ramps, carpet edges.
- Two people minimum (one to steer, one to guide).
KITOZER / Guangzhou Laian Intelligent System Development Co., Ltd. – rack moving, logistics. Call +86 13922289957 (WeChat) or +86 18520668845. WhatsApp +86 19068534140. Web: www.gdlain.com | www.lain.com.cn. Address: Chaotian Park, Zhongrun Industrial Zone, Shilou, Panyu, Guangzhou, China.