The rack is assembled and level. But before you load servers and switches, run this final checklist. Catching a problem now is free; fixing it after the rack is full costs hours.
Structure
- [ ] Rack is level (front-to-back and left-to-right)
- [ ] Leveling feet all bearing weight (no rocking)
- [ ] Rack anchored to floor (and wall, if required)
- [ ] Door opens and closes smoothly, latch catches
- [ ] Side panels secured and locked
- [ ] Mounting rails at correct depth, both sides match
- [ ] Cage nuts installed where needed (spares in hardware bag)
Power and Ground
- [ ] Grounding wire connected to the ground stud, continuity tested
- [ ] PDU mounted, plugged in, outlets tested
- [ ] UPS (if installed) on battery, self-test passed
- [ ] Breaker rated correctly for the circuit
Cooling and Airflow
- [ ] Fan tray installed (if needed), spinning
- [ ] Blank panels ready for unused U positions
- [ ] Top cable entry brush strips in place
- [ ] Front door perforated mesh (not solid glass for server racks)
- [ ] Inlet temperature reads 22-24C
Cable Management
- [ ] Vertical cable manager installed (left/right as planned)
- [ ] Cable arms ready (if servers will slide out)
- [ ] Velcro straps or zip ties on hand
- [ ] Cable labels and label printer ready
Monitoring
- [ ] Temperature/humidity sensor mounted and reading
- [ ] KZ-TH10 base station online, thresholds set
- [ ] Alert email configured (test alert sent)