The rack arrives in a crate. Don’t start assembling until the room is ready. Here’s the pre-installation checklist.
Room Preparation
- [ ] Floor can support the weight (500-800kg for a loaded 42U rack).
- [ ] Doorway wide enough for the crate (measure before delivery).
- [ ] Power outlet near the rack location (220V, grounded, dedicated circuit).
- [ ] Cooling: room AC works, or fan tray sized for the load.
- [ ] Network cabling: wall outlets in place, cable tray overhead.
- [ ] Lighting: enough to see inside the rack.
- [ ] ESD: anti-static mat available if handling sensitive gear.
Tools Ready
- Phillips #2 screwdriver, tape measure, level, wrench set.
- Cage nut tool, punch-down tool (if terminating cables).
- Label maker, cable straps, zip ties.