KITOZER
KITOZER

Rack Relocation Quick Guide

  1. Document current setup (photos, cable labels, IPs).
  2. Power down: servers first, then network, then PDU.
  3. Remove cables, bag and label each group.
  4. Remove equipment (bottom to top) and palletize.
  5. Dismantle rack frame, move, reassemble at new site.
  6. Reinstall top to bottom, reconnect, verify.

KITOZER / Guangzhou Laian Intelligent System Development Co., Ltd. – rack relocation. Call +86 13922289957 (WeChat) or +86 18520668845. WhatsApp +86 19068534140. Web: www.gdlain.com | www.lain.com.cn. Address: Chaotian Park, Zhongrun Industrial Zone, Shilou, Panyu, Guangzhou, China.

Shopping Cart