Table of Contents
ToggleClose the Gap in the Raised Floor
Where cables pass through a raised floor tile, you cut a hole. That hole leaks cold air from the plenum below. A floor grommet seals the cutout around the cable bundle, cutting leakage by 80%.
KITOZER Floor Grommet (KZ-FG1, $25)
- Fits 600×600mm floor tiles
- Adjustable opening: 50-200mm
- Brush seal around cables
- Steel base, powder-coated RAL 7035
- Clips into the tile cutout, no adhesive
Why It Matters
Cold air from the raised floor plenum escapes through every uncapped hole. A 200mm hole leaks about 200 CFM. With 10 racks in a row, that’s 2000 CFM of wasted cooling – the CRAC works twice as hard. Grommets stop the waste.
Installation
- Cut a 200×200mm hole in the floor tile where cables pass.
- Route cables through the hole.
- Place the grommet base over the hole. The brush strip closes around the cables.
- No tools needed – the grommet sits on the tile surface.
KITOZER / Guangzhou Laian Intelligent System Development Co., Ltd. – raised floor grommets, air sealing. Call +86 13922289957 (WeChat) or +86 18520668845. WhatsApp +86 19068534140. Web: www.gdlain.com | www.lain.com.cn. Address: Chaotian Park, Zhongrun Industrial Zone, Shilou, Panyu, Guangzhou, China.