Warning: Undefined variable $taxonomy in /www/wwwroot/gdlain.com/public_html/wp-content/mu-plugins/gdlain-breadcrumb-jsonld.php on line 31

Warning: Undefined variable $taxonomy in /www/wwwroot/gdlain.com/public_html/wp-content/mu-plugins/gdlain-breadcrumb-jsonld.php on line 32

Warning: Undefined variable $taxonomy in /www/wwwroot/gdlain.com/public_html/wp-content/mu-plugins/gdlain-breadcrumb-jsonld.php on line 31

Warning: Undefined variable $taxonomy in /www/wwwroot/gdlain.com/public_html/wp-content/mu-plugins/gdlain-breadcrumb-jsonld.php on line 32

Warning: Undefined variable $taxonomy in /www/wwwroot/gdlain.com/public_html/wp-content/mu-plugins/gdlain-breadcrumb-jsonld.php on line 31

Warning: Undefined variable $taxonomy in /www/wwwroot/gdlain.com/public_html/wp-content/mu-plugins/gdlain-breadcrumb-jsonld.php on line 32

Warning: Undefined variable $taxonomy in /www/wwwroot/gdlain.com/public_html/wp-content/mu-plugins/gdlain-breadcrumb-jsonld.php on line 31

Warning: Undefined variable $taxonomy in /www/wwwroot/gdlain.com/public_html/wp-content/mu-plugins/gdlain-breadcrumb-jsonld.php on line 32

Warning: Undefined variable $taxonomy in /www/wwwroot/gdlain.com/public_html/wp-content/mu-plugins/gdlain-breadcrumb-jsonld.php on line 31

Warning: Undefined variable $taxonomy in /www/wwwroot/gdlain.com/public_html/wp-content/mu-plugins/gdlain-breadcrumb-jsonld.php on line 32

Warning: Undefined variable $taxonomy in /www/wwwroot/gdlain.com/public_html/wp-content/mu-plugins/gdlain-breadcrumb-jsonld.php on line 31

Warning: Undefined variable $taxonomy in /www/wwwroot/gdlain.com/public_html/wp-content/mu-plugins/gdlain-breadcrumb-jsonld.php on line 32

Warning: Undefined variable $taxonomy in /www/wwwroot/gdlain.com/public_html/wp-content/mu-plugins/gdlain-breadcrumb-jsonld.php on line 31

Warning: Undefined variable $taxonomy in /www/wwwroot/gdlain.com/public_html/wp-content/mu-plugins/gdlain-breadcrumb-jsonld.php on line 32
KITOZER
KITOZER

Retrofit of Existing Cabinets to Liquid Cooling

Table of Contents

1. Cover / Document Information

– Document Title: Retrofit of Existing Cabinets to Liquid Cooling Technical Design Solution

– Prepared by: Guangzhou Lain Intelligent System Development Co., Ltd.

– Brand: KITOZER (Pioneer)

– Date: August 2026

– Version: V1.0

– Project Type: Technical design solution for Retrofit of Existing Cabinets to Liquid Cooling

2. Table of Contents Structure

1. Company Introduction

2. Project Overview

3. User Requirement Analysis

4. Overall Design Description

5. Detailed System Design and Product Technical Parameters

6. Project Quotation and Configuration List

7. Core Solution Advantages

8. Technical Q&A

9. Construction Schedule Plan

10. Construction Organization Plan

11. After-Sales Service System

12. Operation and Maintenance Training Plan

13. Typical Project Cases

14. SEO Optimization System and Website Backend Configuration

15. Contact Information

3. Company Introduction

3.1 Company Development Overview

Founded in 2002, Guangzhou Lain Intelligent System Development Co., Ltd. is a high-tech enterprise dedicated to the computer room construction and intelligent protection field for more than two decades, integrating R&D, production, sales, engineering implementation and after-sales service. The company focuses on innovative breakthroughs in electromagnetic shielding technology, modular computer room technology and computer room environmental monitoring technology, and has grown into a source manufacturer with core competitiveness in the domestic computer room construction field.

After more than twenty years of industry accumulation, the company has built a large-scale production and manufacturing base equipped with advanced CNC sheet metal processing equipment, automated spraying production lines and professional testing laboratories, with an annual production capacity of hundreds of sets of shielding computer rooms, integrated cabinets and micro-module products. The company’s service network covers all provinces and cities across the country, providing thousands of computer room construction and renovation services for customers in government, military, scientific research, finance and enterprise fields.

3.2 Core Business System

The company’s core business revolves around the full-lifecycle construction of computer rooms, forming four major product and service systems:

– Computer room EPC general contracting service: one-stop services from solution design, manufacturing, on-site construction to commissioning and acceptance, covering shielding computer rooms, IDC data rooms, modular computer rooms, container computer rooms and other types;

– Core equipment R&D and production: independently produces KITOZER brand series products, including shielding cabinets, shielding desks, consoles, integrated data cabinets, micro-module cold aisle cabinets, outdoor rainproof cabinets, etc., supporting non-standard customization;

– Computer room environmental monitoring system: provides full-element monitoring solutions for temperature and humidity, water leakage, access control, video, fire protection, UPS and power distribution, realizing intelligent and unattended O&M;

– Shielding and security protection products: shielding rooms, shielding doors and windows, anechoic chambers and related auxiliary materials, widely used in confidential, military and scientific research fields.

3.3 Brand and Qualification Honors

The core brand KITOZER (Pioneer) focuses on computer room equipment and shielding products, positioned as an “efficient, green, innovative and safe” solution provider. Products have passed multiple authoritative tests and comply with national and industry standards. The company holds multiple utility model patents and software copyrights, has been awarded high-tech enterprise qualification, and follows the ISO9001 quality management standard.

3.4 Core Competitive Advantages

1. Source production, controllable quality: own production base and professional processing equipment; core products independently produced with full-process quality control, providing more cost-effective solutions without intermediate links;

2. Customized design, matching needs: tailor-made solutions per site conditions, technical requirements, configuration and budget, with multiple design options provided free of charge;

3. Professional team, rich experience: a professional technical team of engineers and project managers with more than ten years of industry experience;

4. Quality after-sales, full guarantee: a 7×24 professional online service system with dedicated project follow-up from early coordination to later O&M.

4. Project Background and Objectives

4.1 Project Background

With the rapid development of the digital economy, server computing power continues to rise and single-device heat generation grows — traditional air cooling shows bottlenecks in heat dissipation, high energy consumption, high noise and short equipment life. Existing computer rooms commonly face insufficient cabinet cooling density, high PUE and serious noise; demolition and rebuild is costly, slow and disrupts business. Therefore, retrofit of existing cabinets to liquid cooling is the optimal choice balancing performance, cost and schedule.

This project retrofits the user’s existing standard server cabinets with cold plate liquid cooling: keeping the original cabinets and server main bodies, adding a liquid cooling heat source, distribution unit, server cold plates, piping and monitoring systems to greatly improve cabinet heat dissipation, reduce overall energy consumption and improve the operating environment.

4.2 Retrofit Objectives

– Heat dissipation: single-cabinet capacity from 5-8kW (air) to 25kW;

– Energy saving: PUE from 1.6-1.8 to 1.15-1.25, cooling energy reduced 40%+;

– Noise: room noise from 65-75dB to below 50dB;

– Safety: multiple protection systems eliminating leakage risk;

– Intelligent O&M: full-parameter monitoring and alarms integrated with the existing DCIM;

– Existing asset reuse: maximize reuse of existing cabinets and servers, control cost, shorten construction, minimize business impact.

4.3 Scope and Boundary

Scope: liquid cooling adaptation of 2× 42U standard server cabinets; 1 reused supporting cabinet for the CDU; cold plate adaptation of 5 servers (4 tower + 1 2U rack); indoor/outdoor piping; monitoring and safety systems; commissioning and acceptance; training and after-sales.

Boundary: outdoor dry cooler location designated by the user; no building structure openings or civil works; server retrofit only replaces cooling modules (no motherboard/CPU/memory changes, no software changes); existing distribution adapted only; no room decoration or fire renovation.

4.4 Basis and Standards

– GB 50174-2017 Data Center Design Specification

– GB 50462-2016 Data Center Infrastructure Construction and Acceptance Code

– GB/T 41378.1-2022 Liquid Cooling Technology Part 1: General Requirements

– Related national standards for electrical, fire and pressure equipment; user site conditions

4.5 Design Principles

Safety first (insulation ≥20kV, multi-level leakage protection, redundant pumps); maximum reuse of existing assets; minimal business impact; energy saving and environmental protection (ODP=0 low-GWP coolant, VFD drives); scalability; easy maintenance.

5. User Requirement Analysis

5.1 Existing Conditions Survey

Existing equipment: 2× standard 42U server cabinets (600×1000×2000mm, glass/metal doors); 1 supporting cabinet (reusable for CDU); 4 tower servers (3-5kW each, air-cooled); 1× 2U rack server/storage (5-8kW); existing room-level precision air cooling with local hot spots, low efficiency and high noise; basic DCIM with temperature/humidity and power monitoring.

5.2 Core Functional Requirements

– Reliable liquid cooling for all servers replacing air cooling, eliminating local hot spots;

– Dynamic cooling regulation per server load with precise temperature control;

– Real-time monitoring of temperature, pressure, flow and liquid level with visualization;

– Multi-channel alarms (sound/light, SMS, platform) and linkage protection for abnormal temperature, pressure, leakage and low level;

– Integration with the existing DCIM for unified management;

– Quick server disconnect/reconnect without affecting other equipment.

5.3 Performance Requirements

– Total cooling ≥30kW; single-cabinet ≥25kW;

– Inlet temperature control ±0.5℃; CPU core 40-65℃;

– Secondary-side working pressure 0.2-0.4MPa, fluctuation ≤0.05MPa;

– Noise ≤50dB(A) indoors, outdoor dry cooler ≤60dB(A);

– Availability ≥99.99%; MTBF ≥100000h; temperature response ≤30s on load change.

5.4 Safety and Reliability Requirements

– Coolant insulation ≥20kV (no short-circuit risk on leakage);

– Leakage detection at cabinet bottoms and key pipe nodes, positioning ≤10cm, response ≤1s;

– Redundant pumps (1+1, auto switchover ≤2s);

– Multi-level protection: over/under-voltage, over-current, over-temperature, flow loss, low level;

– Corrosion-resistant materials, aging-resistant seals, design life ≥10 years;

– B1 flame-retardant insulation, cables and hoses.

5.5 O&M Management Requirements

– Touch display for visualization; ≥12-month history storage with export;

– Remote WEB/client management; graded permissions;

– Easy maintenance: replaceable filters and valves, simple filling and venting.

5.6 Energy Saving and Environmental Requirements

– PUE ≤1.25; cooling energy reduced 40%+; VFD pumps and fans;

– Environmental coolant (ODP=0, low GWP); RoHS materials.

5.7 Existing Asset Reuse and Cost Control

– Keep existing cabinets (structural reinforcement and sealing only);

– Keep server hosts (replace cooling modules only);

– Reuse the supporting cabinet for the CDU;

– Optimized construction, short period, low cost; low operating and maintenance cost.

6. Design Principles and Applicable Standards

6.1 Technical Route Selection

Comparison of mainstream liquid cooling routes:

Route Retrofit Cost Equipment Change Heat Density O&M Difficulty Fit for Retrofit
Cold plate Medium Small (cooling modules only) Medium-high (20-50kW/cabinet) Low Very suitable
Immersion High Large (dedicated cabinets and coolant) High (50-100kW) High Unsuitable
Spray High Large (sealed cabinets) High High Unsuitable

Cold plate liquid cooling is selected: no replacement of existing cabinets/servers, high asset reuse, moderate cost, short payback, mature reliable technology, low O&M difficulty, covers 25kW/cabinet, short construction with minimal business impact.

7. System Architecture and Working Principle

7.1 Overall System Architecture

Dual-loop closed liquid cooling system:

– Primary loop (water): outdoor dry cooler → primary piping → CDU plate heat exchanger primary side → back to dry cooler; ordinary cooling water dissipates heat outdoors;

– Secondary loop (insulating coolant): CDU secondary side → secondary main piping → in-cabinet distribution branches → server cold plates → back to CDU; electronic-grade insulating coolant carries heat from server components;

– Monitoring: field sensors → CDU main control → liquid cooling monitoring host → user DCIM/clients — full-chain data collection, logic control, alarms and remote management.

8. Detailed Technical Design

8.1 Cabinet Retrofit Design

– Load reinforcement: load-bearing reinforcement ribs and base added (static load to 1500kg);

– Pipe wall penetration: dedicated top openings with waterproof sealed bulkhead fittings;

– In-cabinet pipe supports: aluminum pipe brackets with adjustable clamps along posts, not occupying U positions;

– Sealing and condensation protection: EPDM strips on doors/panels, flame-retardant sealing modules at bottom cable entries;

– Leakage detection: positioning leakage cable at cabinet bottom, full coverage with precise location.

8.2 Heat Source and Circulation System

– CDU (30kW rack-mount, 12U): integrated circulation pumps, plate heat exchanger, expansion tank, filters, control valves and monitoring; installed in the reused supporting cabinet;

– Outdoor dry cooler (35kW): copper-tube aluminum-fin heat exchanger, axial fans with VFD, energy-saving speed control by ambient/return temperature;

– Redundant pumps: 2 stainless shielded pumps (1+1), switchover ≤2s;

– Filling and expansion: expansion tank and filling unit with visible level and auto-fill interface, low-level alarm.

8.3 Server End Adaptation

– Tower servers (4): dedicated CPU main cold plate (pure copper micro-channel, insulated surface, high-thermal grease interface) + auxiliary aluminum vapor-chamber plates covering memory/south bridge/HDDs; internal flexible insulated hoses; self-sealing quick couplings at the rear;

– 2U rack server (1): full-coverage cold plate (CPU + memory + chipset), thickness adapted to 2U without chassis modification, rear liquid interfaces, retained emergency fans;

– Process: pre-retrofit testing, ESD-protected removal of air modules, grease application, cold plate mounting with standard torque, internal pipe connection and pressure leak test, commissioning test.

8.4 Piping System

– Main piping: 304 stainless hard pipe φ20×1.5mm, internally/externally polished, corrosion-resistant;

– Branch hoses: fluororubber insulated flexible hose φ12mm, -20℃~120℃, flame-retardant, insulation ≥10¹²Ω;

– Seals: EPDM and FKM;

– Layout: main piping along ceiling/underfloor, fixed with clamps every 1.5m, expansion joints on long runs, sleeved and sealed at wall/floor penetrations; 10%+ capacity margin.

8.5 Monitoring and Safety System

– Monitoring host (1U rack) with multi-protocol integration and data storage;

– Temperature/pressure integrated sensors (6) at key nodes;

– Condensation temp/humidity sensors (4, 2 per cabinet);

– Positioning leakage detection (2 sets, 10m cable each, ≤10cm positioning);

– Sound/light alarm (≥100dB);

– Integration with existing DCIM; touch display for local visualization.

8.6 Electrical Adaptation

– CDU and pumps powered from existing distribution with suitable breakers; monitoring host on UPS where available; grounding per code.

8.7 Condensation Protection

– Pipe insulation (B1 rubber-plastic 15mm) on cold surfaces; cabinet sealing reduces moist air ingress; condensation sensors trigger alarms; supply temperature set above dew point where practical.

9. Recommended Configuration and Preliminary Budget

9.1 Configuration Notes

The list is compiled for the retrofit of 2× 42U cabinets and 5 servers (4 tower + 1 2U rack); quantities per the confirmed scope, adjustable per site conditions. Quotation includes equipment, materials, installation, commissioning, transport and tax.

9.2 Cabinet Retrofit Parts

No. Item Specification Unit Qty
1 Cabinet load-bearing base Carbon steel sprayed, for 600×1000mm cabinet, static 1500kg set 2
2 Top bulkhead sealing kit 304 stainless with bulkhead fittings and seals set 2
3 In-cabinet pipe support kit Anodized aluminum with adjustable clamps set 2
4 Cabinet sealing upgrade kit EPDM strips + bottom sealing modules, IP54 set 2
5 Cable managers 1U metal pc 4

9.3 Heat Source and Circulation

No. Item Specification Unit Qty
1 Rack CDU KITOZER-CDU-30kW, 12U, 30kW, dual-pump redundant unit 1
2 Outdoor dry cooler KITOZER-DC-35kW, 35kW, dual VFD fans unit 1
3 Coolant filling unit 25L stainless tank with level gauge and fill valve set 1
4 Safety valves Brass nickel-plated, set 0.4MPa pc 2
5 Y-type strainers 304 stainless, 80-mesh, DN20 pc 3

9.4 Server-Side Adaptation

No. Item Specification Unit Qty
1 Tower server CPU main cold plate Pure copper micro-channel, insulated, mainstream workstation CPU set 4
2 Tower server auxiliary cold plate Aluminum vapor chamber, memory/south bridge/HDD set 4
3 2U server full-coverage cold plate Integrated CPU+memory set 1
4 Self-sealing quick couplings Brass nickel-plated, 1-in 1-out, φ12mm set 5
5 Server retrofit service Air module removal, cold plate install, pressure test unit 5

9.5 Piping and Medium

No. Item Specification Unit Qty
1 304 stainless hard pipe φ20×1.5mm, polished m 35
2 Insulated flexible hose Fluororubber, φ12mm, high insulation m 45
3 Ball valves Brass nickel-plated, DN20/φ12 pc 8
4 Pipe fittings Couplings, elbows, tees, clamps lot 1
5 Electronic-grade insulating coolant Fluoroketone type, insulation ≥20kV L 60
6 B1 rubber-plastic insulation 15mm, adhesive backed m 35

9.6 Monitoring and Safety

No. Item Specification Unit Qty
1 Liquid cooling monitoring host 1U rack, multi-protocol, storage unit 1
2 Temperature/pressure sensors 0-1MPa, 0-80℃, RS485 pc 6
3 Condensation temp/humidity sensors High precision, condensation contacts pc 4
4 Positioning leakage detection 10m cable + controller, 10cm accuracy set 2
5 Sound/light alarm Tricolor, ≥100dB pc 1
6 System integration service Sensor calibration, DCIM integration, training item 1

9.7 Auxiliaries and Engineering Services

No. Item Specification Unit Qty
1 High-thermal insulating grease 8W/m·K, syringe tube 8
2 Flame-retardant cable ties 4×200mm, V0 pack 5
3 Neutral silicone sealant Waterproof insulating tube 12
4 On-site installation service Piping, installation, pressure leak test item 1
5 Transport and insurance Urban transport item 1

9.8 Cost Summary

Total cost = equipment/material + engineering service + tax. The retrofit typically achieves a payback within 1-3 years through energy savings (PUE reduction, cooling energy -40%+) and reduced cargo/equipment loss risk. All reference prices in this solution are in RMB (CNY) only and are for reference purposes; a formal quotation is issued after configuration confirmation.

10. Technical Specifications

10.1 System Performance Summary

Item Specification
Retrofit scope 2× 42U cabinets, 5 servers (4 tower + 1 2U)
Cooling capacity Total ≥30kW; single cabinet ≥25kW
Temperature control Inlet ±0.5℃; CPU core 40-65℃
Pressure Secondary 0.2-0.4MPa, fluctuation ≤0.05MPa
PUE ≤1.25 (from 1.6-1.8); cooling energy -40%
Noise Room ≤50dB(A); dry cooler ≤60dB(A)
Availability ≥99.99%; MTBF ≥100000h
Coolant insulation ≥20kV; ODP=0, low GWP
Leakage detection Positioning ≤10cm, response ≤1s
Pumps 1+1 redundant, switchover ≤2s
Design life ≥10 years; B1 flame-retardant materials

10.2 Key Equipment Specifications

Equipment Key Parameters
CDU 30kW, 12U rack, dual pumps, plate exchanger, expansion tank
Dry cooler 35kW, dual VFD fans, copper-aluminum fin
Main cold plate Pure copper micro-channel, insulated
Full-coverage cold plate CPU+memory integrated, 2U-adapted
Coolant Fluoroketone type, ≥20kV insulation, 60L
Monitoring host 1U, multi-protocol, storage ≥12 months

11. Key Advantages and Customer Value

11.1 Energy Saving and Carbon Reduction

PUE drops from 1.6-1.8 to 1.15-1.25 with cooling energy reduced over 40%: liquid cooling’s high efficiency, higher chilled water temperatures enabling dry cooler free cooling, and VFD pumps/fans — significant long-term electricity savings and carbon reduction.

11.2 High-Density Deployment

Single-cabinet capacity from 5-8kW to 25kW — supporting higher-density servers and future computing upgrades within existing cabinets without new floor space.

11.3 Quiet Operation

Room noise from 65-75dB to below 50dB — eliminating high-speed fan noise, improving the O&M environment and enabling daytime work near the room.

11.4 Extended Equipment Life

Stable 40-65℃ chip temperatures reduce thermal stress; less fan vibration and dust — extending server and component service life.

11.5 Safety and Reliability

Insulating coolant ≥20kV, redundant pumps, multi-level protection, positioning leakage detection with rapid alarms, B1 materials — comprehensive safety without electrical short-circuit risk on leakage.

11.6 Existing Asset Reuse and Cost Advantage

Original cabinets, server hosts and supporting cabinets reused — low retrofit cost, short payback (1-3 years), short construction period, minimal business impact versus demolition/rebuild.

11.7 O&M Convenience

Full-parameter visualization, remote management, quick couplings for server maintenance, easy filling/venting, integration with existing DCIM — low O&M workload.

11.8 Expansion and Compatibility

Modular architecture supports adding cabinets/servers, higher cooling capacity, and integration with enterprise platforms — smooth future expansion protecting investment.

12. Technical Q&A (50+ Items)

12.1 Basic Knowledge Questions

Q1: What is cold plate liquid cooling retrofit?

A: Installing cold plates on server chips and circulating coolant through them to remove heat, replacing air cooling. In retrofit, existing cabinets and servers are kept; only cooling modules are replaced and a heat source/distribution/piping system added.

Q2: Why retrofit instead of rebuild?

A: Rebuild costs 3-5× more, takes months and disrupts business; retrofit reuses existing assets, completes in days with minimal impact, and delivers most of the energy and density benefits — the optimal balance for existing rooms.

Q3: What is a CDU?

A: Coolant Distribution Unit — the core device with pumps, plate heat exchanger, expansion tank, filters and controls, separating primary (water) and secondary (insulating coolant) loops and precisely regulating coolant supply.

Q4: Why separate primary and secondary loops?

A: The secondary loop uses expensive insulating coolant for server safety; the primary loop uses ordinary water with the outdoor heat source. The plate heat exchanger transfers heat while isolating the two, protecting servers and enabling dry cooler free cooling.

Q5: What is the dry cooler’s role?

A: It dissipates the primary loop’s heat to the atmosphere using fans — the “outdoor unit” equivalent, enabling free cooling without chillers in moderate climates.

12.2 Technical Principle Questions

Q6: How does cold plate cooling work?

A: Cold plates mount directly on CPUs with high-thermal grease; coolant flows through micro-channels absorbing chip heat; the CDU pumps the warmed coolant to the heat exchanger where heat transfers to the primary loop and outdoors — chip-level efficient cooling.

Q7: Why is coolant insulation important?

A: If coolant leaks onto energized components, conductive liquid causes short circuits; insulating coolant (≥20kV) eliminates this risk — a key safety feature for electronic environments.

Q8: What happens on pump failure?

A: The redundant pump auto-switches within ≤2s, maintaining cooling without interruption; alarms notify operators.

Q9: How is temperature controlled?

A: The CDU regulates flow and the dry cooler regulates fan speed per supply/return temperatures, maintaining inlet within ±0.5℃ and CPU cores at 40-65℃.

Q10: Why is condensation a concern?

A: Cold coolant surfaces below dew point cause condensation; mitigation: pipe insulation, cabinet sealing, supply temperature set above dew point, and condensation sensors with alarms.

Q11: How does leakage detection work?

A: Positioning sensing cables at cabinet bottoms detect coolant contact, locate the leak within 10cm and trigger alarms within 1s — enabling rapid response.

Q12: What is free cooling?

A: In moderate/cold weather, the dry cooler alone rejects heat without a chiller — the major energy saving mechanism of liquid cooling, especially effective in winter.

12.3 Product Selection Questions

Q13: Why cold plate rather than immersion for retrofit?

A: Immersion requires dedicated cabinets, large coolant volumes and high cost — unsuitable for existing cabinets; cold plate changes only cooling modules with high reuse and low cost, fully covering 25kW/cabinet.

Q14: Why 30kW CDU for 2 cabinets?

A: 2 cabinets × up to 25kW with margin and future expansion — 30kW provides adequate capacity with redundancy and 10%+ margin.

Q15: Why a 35kW dry cooler?

A: Slightly above the 30kW CDU capacity to maintain heat rejection capability in high ambient conditions with fan speed margin.

Q16: Why pure copper micro-channel cold plates?

A: Copper’s high thermal conductivity with micro-channel structure maximizes heat transfer from high-power CPUs; insulated surface prevents electrical issues.

Q17: Why fluoroketone-type coolant?

A: High insulation (≥20kV), ODP=0 and low GWP (environmental), wide temperature range, non-corrosive to system materials — the balanced choice for server liquid cooling.

Q18: Can other servers be retrofitted later?

A: Yes — modular architecture and quick couplings allow adding servers/cabinets with matching cold plates and manifolds.

12.4 Construction and Installation Questions

Q19: How long does the retrofit take?

A: Approximately 7 days per the schedule (survey 1, cabinet/piping 4, equipment/server 2, commissioning included in parallel); server work scheduled to minimize downtime.

Q20: Is server downtime required?

A: Each server requires brief downtime for cooling module replacement (typically 1-2 hours); work can be scheduled sequentially to minimize business impact.

Q21: Does the retrofit damage cabinets?

A: No — only reinforcement, sealing and pipe openings at the top; cabinets remain fully functional and structurally enhanced.

Q22: Where is the dry cooler installed?

A: Outdoors at the user-designated location with good ventilation; outdoor piping installed without building structural openings (per project boundary).

Q23: What is the pressure test procedure?

A: After piping connection, system pressure tested per design (typically 1.5× working pressure) holding 30+ minutes with no leakage before coolant filling.

Q24: How is coolant filled?

A: Via the filling unit: fill, vent air through vent valves, verify level and pressure; the expansion tank compensates thermal volume changes.

Q25: Does installation require room shutdown?

A: No — piping and most work proceed without room shutdown; only individual server work requires that server’s brief downtime.

Q26: What tools are needed?

A: Standard tools for piping and server work; our team provides all tooling and testing instruments; training included.

12.5 O&M Questions

Q27: What daily checks are needed?

A: Monitor platform parameters (temperatures, pressures, flow, level), check alarms, verify pump status; monthly: filter check, visual inspection for leaks; quarterly: sensor check; annual: comprehensive inspection, coolant level/quality check.

Q28: How is the server disconnected for maintenance?

A: Close the branch valve, disconnect the self-sealing quick coupling (no spill), service the server, reconnect and reopen — other servers unaffected.

Q29: How often is coolant replaced?

A: With proper filtration and quality maintenance, the fluoroketone coolant lasts years; check level and quality annually; top up or replace per manufacturer guidance.

Q30: How are filters maintained?

A: Y-type strainers inspected/cleaned periodically (typically semi-annual or per pressure differential); easy access for quick cleaning.

Q31: What if the system pressure fluctuates?

A: Check for air in the system (vent), coolant level, pump status and filter blockage; the expansion tank maintains stable pressure.

Q32: How is data reviewed?

A: The monitoring host stores ≥12 months history; touch display and WEB/client provide real-time view, history query and export for analysis.

Q33: What spares are recommended?

A: Spare quick couplings, seals, filters, coolant, sensors and a spare pump module for critical redundancy.

12.6 Safety and Compliance Questions

Q34: What if coolant leaks onto equipment?

A: The insulating coolant (≥20kV) does not short-circuit equipment; leakage detection alarms with location; isolate the branch valve, clean and repair, refill if needed.

Q35: Is the system fire-safe?

A: All insulation, cables and hoses are B1 flame-retardant; coolant is non-flammable; existing room fire protection unaffected.

Q36: What electrical protections exist?

A: Over/under-voltage, over-current, over-temperature, flow-loss and low-level protection with automatic protection actions and alarms.

Q37: Which standards apply?

A: GB 50174-2017, GB 50462-2016, GB/T 41378.1-2022 and related electrical/fire standards; system compliance documented at acceptance.

Q38: Is the retrofit safe during operation?

A: Yes — closed loops, sealed joints, redundant pumps and multi-level monitoring make normal operation leak-free; emergency procedures documented.

12.7 Cost and Benefit Questions

Q39: What is the energy saving?

A: Cooling energy reduced 40%+ with PUE from 1.6-1.8 to 1.15-1.25 — for a typical 30kW load, annual electricity savings are substantial (often 30-50% of cooling cost).

Q40: What is the payback period?

A: Typically 1-3 years depending on load, electricity price and climate; higher density and longer operation accelerate payback.

Q41: What costs are involved?

A: Equipment (CDU, dry cooler, cold plates, piping, coolant, monitoring), installation, and services; ongoing costs are low (VFD energy, minor maintenance).

Q42: Does the retrofit increase computing capacity?

A: Yes — the 25kW/cabinet capability allows deploying higher-density servers in existing cabinets, increasing total computing per floor area.

Q43: What is the ROI beyond energy?

A: Reduced equipment failure (stable temperatures), longer server life, quieter environment, compliance with green data center requirements and higher customer perception.

Q44: How does the retrofit affect the room’s total load?

A: IT load can increase (higher density), while cooling energy decreases — net PUE improves; electrical capacity check recommended before adding load.

12.8 Project and Service Questions

Q45: What is the warranty?

A: Typically 2-year equipment warranty with free repair of quality problems; lifetime cost-price maintenance; monitoring platform support per subscription.

Q46: What training is provided?

A: Training for O&M staff (system architecture, operation, emergency handling — 4h), front-line staff (device operation, inspection, fault handling — 8h) and server administrators (coupling operation, temperature checks — 2h).

Q47: What documentation is delivered?

A: As-built drawings, configuration lists, device certificates, pressure test records, coolant quality data, monitoring system guide, O&M manual and after-sales card.

Q48: What is the response time for faults?

A: 7×24 hotline; remote guidance within 1 hour; on-site per region (urban 4h); critical faults prioritized with spare parts.

Q49: Can the system be expanded?

A: Yes — additional cabinets/servers with matching cold plates connect to the CDU loop (within capacity) or add CDUs; platform scales accordingly.

Q50: Does the retrofit integrate with the existing DCIM?

A: Yes — the monitoring host integrates with the existing DCIM via standard protocols for unified management.

Q51: What if the outdoor dry cooler fails in summer?

A: Alarms notify operators; the system can temporarily operate at reduced capacity; redundant fan design and quick maintenance restore full cooling; consider spare fan availability.

Q52: How is the project accepted?

A: Acceptance covers: cooling capacity verification, temperature control accuracy, pressure stability, leak-free operation, noise levels, alarm/linkage functions, DCIM integration and documentation — jointly signed.

13. Construction Schedule

13.1 Stage Division

Total period approximately 7 working days, with server work scheduled to minimize downtime.

13.2 Detailed Schedule

Stage Work Days
1. Preparation Site survey, technical disclosure; material/equipment arrival and inspection 1
2. Cabinet and piping Cabinet load reinforcement and sealing; indoor main piping; outdoor dry cooler installation and outdoor piping; in-cabinet branch installation 3.5
3. Equipment and server work CDU and monitoring installation/wiring; server air module removal and cold plate installation 2
4. Connection and test Pipe connection, pressure leak test 0.5
5. Commissioning System filling, commissioning, alarm/linkage tests, DCIM integration 0.5
6. Trial and acceptance Trial run, documentation, training, acceptance included

13.3 Key Node Control

– Material incoming inspection; pressure leak test node; server retrofit quality check; commissioning and linkage verification; acceptance with documentation.

13.4 Schedule Assurance Measures

Experienced liquid cooling retrofit team; advance stocking; server work scheduled per business windows (sequential, brief downtime each); daily plan review; spare parts available; overtime arrangements as needed.

14. Construction Organization and Quality/Safety Measures

14.1 Organization Structure

– Project manager: overall responsibility, client interface, progress/quality/safety/cost;

– Technical leader: retrofit design deepening, disclosure, server retrofit supervision, commissioning;

– Construction team: piping, cabinet works, dry cooler installation;

– Server retrofit technicians: cooling module replacement (ESD-trained);

– QC/safety officer: quality inspection, safety supervision.

14.2 Pre-Construction Preparation

1. Technical: site survey, point confirmation, technical and safety disclosure; server inventory and pre-retrofit testing plan;

2. Materials: incoming inspection (certificates, appearance, quantity); coolant quality data;

3. Personnel: team trained on server handling and liquid cooling safety;

4. Site: coordinate work areas and server downtime windows with the client.

14.3 Key Processes and Standards

– Cabinet works: reinforcement and sealing per design; top bulkhead installation sealed;

– Piping: stainless pipe welding/connection per code, clamps every 1.5m, sleeved penetrations, insulation applied;

– Dry cooler: installed at designated location, secured, piped with slope for drainage;

– Server retrofit: ESD protection, air module removal, grease application, cold plate mounting with standard torque, internal connections, per-server pressure test;

– System test: pressure test 1.5× working pressure, 30min hold; coolant filling with venting; commissioning per acceptance items.

14.4 Quality Control

– Three-level inspection; key control points: weld/connection quality, pressure test, cold plate mounting torque, coolant quality, sensor calibration, alarm/linkage functions, DCIM integration;

– Records per server and per system; acceptance documentation.

14.5 Safety Management

– Server work with ESD precautions and data safety (no hardware/software changes); electrical work by certified electricians with lockout/tagout;

– Pressure test safety (vent, controlled pressurization); coolant handling with PPE; dry cooler installation safety;

– B1 materials; fire safety maintained; emergency plan for leakage, injury and equipment issues.

14.6 Civilized Construction and Protection

– Clean work areas, finished product protection for existing equipment; server bays protected during work; daily site cleaning; compliance with client data center rules.

14.7 Emergency Plans

– Coolant leakage: isolate valve, clean, repair, refill; equipment anomaly: stop work, assess; injury: first aid and emergency services.

15. After-Sales Service

15.1 Warranty Commitment

Typically 2-year equipment warranty with free repair/replacement of non-artificial quality problems; lifetime cost-price maintenance after warranty; monitoring platform support per subscription.

15.2 Response Time Commitment

7×24 hotline; remote guidance within 1 hour; on-site per region (urban 4h); critical faults (cooling interruption) prioritized with green channel.

15.3 Full-Lifecycle Services

Design consultation, retrofit, commissioning, training, periodic inspection, maintenance, upgrades and expansion — one-stop service with dedicated follow-up.

15.4 Periodic Inspection

Semi-annual inspection (pipes, connections, filters, coolant level/quality, sensors, pumps); annual comprehensive inspection with reports.

15.5 Fault Repair and Spare Parts

Spare parts stocked (couplings, seals, filters, sensors, pump module, coolant); emergency logistics within 48h; genuine parts with warranty.

15.6 Upgrade and Expansion

Adding servers/cabinets, capacity upgrades, DCIM integration and platform enhancements at preferential terms.

15.7 Lifetime Technical Support

Free technical consultation, remote assistance, and industry technology updates for the system’s lifetime.

15. After-Sales Service

15.1 Warranty Commitment

The overall project warranty period is 2 years from the date of completion acceptance; core equipment has a 3-year warranty. During the warranty period, all failures and damage caused by product quality or construction process problems are repaired and parts replaced free of charge. After the warranty period, lifetime cost-price maintenance is provided, charging only parts cost and basic labor, ensuring long-term stable system operation.

15.2 After-Sales Response Mechanism

– A 7×24 after-sales hotline receives fault reports and technical consultations at any time;

– Within the urban area: respond within 2 hours, technicians on site within 4 hours;

– Suburban and surrounding areas: respond within 4 hours, personnel on site within 8 hours;

– General faults resolved on the spot; complex faults solved within 24 hours with a solution;

– Emergency faults get a green channel with priority dispatch of personnel and parts.

15.3 Periodic Inspection and Maintenance

During the warranty period, a free on-site inspection is provided every six months, with a comprehensive maintenance inspection annually. Inspection contents include equipment operating status, connection firmness, sealing and rust conditions, filtering/grounding performance and safety devices. After each inspection, a formal inspection report is issued recording equipment status and maintenance content with optimization suggestions.

15.4 Spare Parts Supply Guarantee

A local spare parts warehouse is established, stocking common wearing parts for quick replacement to shorten fault handling time. For uncommon special parts, a fast supply channel with the factory ensures availability within 48 hours. During warranty, non-artificial-damage spare parts are replaced free; after warranty, parts are charged at cost price without markup.

15.5 System Upgrade and Technical Support

– Free lifetime technical consultation services by phone or online at any time;

– If the customer later needs upgrades or expansions, preferential upgrade solutions and construction services are provided;

– Industry new technology and standard information is regularly pushed to customers.

16. Training Plan

16.1 Training Objectives and Audience

Training objectives: through systematic training, enable management personnel to fully understand the system structure, working principles and performance characteristics, master daily operation methods and inspection/maintenance essentials, identify common faults and handle simple problems, ensuring safe, stable and long-term operation.

Training audience: management and O&M personnel designated by the client, recommended 2-3 persons with basic electrical and equipment knowledge.

16.2 Tiered Training Content System

Level 1: Basic operation training (1 day)

– Basic principles: system concepts, structure composition, performance indicators;

– Daily operation standards: correct operation of equipment, control and safety systems;

– Daily inspection contents: daily/weekly/monthly check items;

– Safety precautions: usage prohibitions and emergency handling procedures.

Level 2: Maintenance training (1 day)

– Detailed structure of each subsystem and working principles;

– Daily maintenance methods: cleaning, fastening checks, routine care;

– Common fault identification and simple handling;

– Emergency handling procedures for power failure, fire and equipment faults.

Level 3: Advanced management training (as needed)

– Performance influencing factors and how to avoid degradation;

– Upgrade and expansion knowledge and specification requirements;

– Relevant national standards interpretation.

16.3 Training Methods and Schedule

– Methods: combination of “theory explanation + on-site practice + Q&A interaction”;

– Schedule: training arranged at the completion acceptance stage, synchronized with handover, 2 days of intensive training total; time flexibly adjustable; a free repeat training session is provided for newly assigned personnel.

16.4 Training Assessment and Documentation Delivery

– Assessment: theory written test plus practical operation; training qualification certificates issued upon passing; supplementary training for those who fail;

– Documentation delivery: complete O&M documentation, including operation and maintenance manual, equipment manuals and certificates, completion drawings and hidden work records, test reports and after-sales service contact card, all bound into volumes.

17. Anonymous Typical Project Scenarios

All project scenarios below are anonymous, generalized examples compiled from typical industry deployments; no real customer names, addresses or confidential information are disclosed.

17.1 Existing Cabinet Cold Plate Retrofit for a Manufacturing Enterprise

A manufacturing enterprise’s computer room with standard cabinets and air-cooled servers faced heat dissipation bottlenecks and high PUE. The retrofit reused existing cabinets and servers, adding a 30kW CDU, 35kW dry cooler, server cold plates and monitoring. Single-cabinet capacity rose from 6kW to 25kW, PUE dropped from 1.7 to 1.22, cooling energy reduced over 40%, and room noise fell below 50dB. The retrofit completed in about 7 days with minimal business impact and paid back within two years through energy savings.

17.2 Server Liquid Cooling Upgrade for a Government Data Center

A government data center upgraded existing server racks to liquid cooling for density and energy compliance. Tower and rack servers were retrofitted with cold plates, the system integrated with the existing DCIM for unified monitoring, and alarm linkage ensured rapid response. The upgraded room met green data center requirements with lower energy consumption, and the traceable monitoring data supported compliance reporting.

17.3 High-Density Room Retrofit for a Research Institute

A research institute’s high-density computing room required higher per-cabinet cooling for new compute nodes. Cold plate retrofit of existing cabinets with redundant pumps and positioning leakage detection delivered 25kW/cabinet capacity, stable 40-65℃ chip temperatures, and 99.99%+ availability. The modular architecture allowed subsequent node expansion without rework, and staff training enabled independent daily O&M.

18. SEO Optimization Section

All reference prices in this technical solution are in RMB (CNY) only and are for reference purposes; final quotation is subject to the confirmed configuration.

18.1 Keyword System

– Core keywords: technical design solution, system configuration, technical parameters, construction and O&M services;

– High-conversion long-tail keywords: design solution, configuration list, technical parameters, construction plan, after-sales service;

– Industry traffic keywords: system architecture, applicable standards, technical Q&A, project cases;

– Brand keywords: KITOZER, Guangzhou Lain.

18.2 SEO Tag System

– Title tag: the article title — Guangzhou Lain KITOZER;

– Meta description: Guangzhou Lain professionally provides complete technical design solutions with detailed configuration list, full-system product technical parameters, construction organization plan and after-sales service — source manufacturer customization, compliant performance, third-party testing supported;

– H1 tag: the article title;

– H2 tags: system design and product parameters, construction organization plan, after-sales service and training, engineering cases.

18.3 Internal Link Anchor Text

– Core anchor text: technical design solution, system construction;

– Long-tail anchor text: configuration list, technical parameters, construction plan;

– Related anchor text: shielding cabinet, micro-module cold aisle, integrated computer room, outdoor cabinet.

19. Official Contact Information

– Company Name: Guangzhou Lain Intelligent System Development Co., Ltd.

– Brand: KITOZER (Pioneer)

– Official Website: https://gdlain.com

– Tel: +86 139 2228 9957 (WeChat available), +86 185 2066 8845 (WeChat available)

– Address: No. 5 Huashan Road, Shilou Town, Panyu District, Guangzhou, China

For any inquiries about this technical design solution, configuration customization, quotation or construction services, please contact us through the information above. We provide free design consultation and tailored solutions for your specific requirements.

Scroll to Top