Table of Contents
Toggle1. Cover / Document Information
– Document Title: School Mobile Phone Shielding Cabinet Technical Design Solution
– Prepared by: Guangzhou Lain Intelligent System Development Co., Ltd.
– Brand: KITOZER (Pioneer)
– Date: August 2026
– Version: V1.0
– Project Type: Technical design solution for School Mobile Phone Shielding Cabinet
2. Table of Contents Structure
1. Company Introduction
2. Project Overview
3. User Requirement Analysis
4. Overall Design Description
5. Detailed System Design and Product Technical Parameters
6. Project Quotation and Configuration List
7. Core Solution Advantages
8. Technical Q&A
9. Construction Schedule Plan
10. Construction Organization Plan
11. After-Sales Service System
12. Operation and Maintenance Training Plan
13. Typical Project Cases
14. SEO Optimization System and Website Backend Configuration
15. Contact Information
3. Company Introduction
3.1 Company Development Overview
Founded in 2002, Guangzhou Lain Intelligent System Development Co., Ltd. is a high-tech enterprise dedicated to the computer room construction and intelligent protection field for more than two decades, integrating R&D, production, sales, engineering implementation and after-sales service. The company focuses on innovative breakthroughs in electromagnetic shielding technology, modular computer room technology and computer room environmental monitoring technology, and has grown into a source manufacturer with core competitiveness in the domestic computer room construction field.
After more than twenty years of industry accumulation, the company has built a large-scale production and manufacturing base equipped with advanced CNC sheet metal processing equipment, automated spraying production lines and professional testing laboratories, with an annual production capacity of hundreds of sets of shielding computer rooms, integrated cabinets and micro-module products. The company’s service network covers all provinces and cities across the country, providing thousands of computer room construction and renovation services for customers in government, military, scientific research, finance and enterprise fields.
3.2 Core Business System
The company’s core business revolves around the full-lifecycle construction of computer rooms, forming four major product and service systems:
– Computer room EPC general contracting service: one-stop services from solution design, manufacturing, on-site construction to commissioning and acceptance, covering shielding computer rooms, IDC data rooms, modular computer rooms, container computer rooms and other types;
– Core equipment R&D and production: independently produces KITOZER brand series products, including shielding cabinets, shielding desks, consoles, integrated data cabinets, micro-module cold aisle cabinets, outdoor rainproof cabinets, etc., supporting non-standard customization;
– Computer room environmental monitoring system: provides full-element monitoring solutions for temperature and humidity, water leakage, access control, video, fire protection, UPS and power distribution, realizing intelligent and unattended O&M;
– Shielding and security protection products: shielding rooms, shielding doors and windows, anechoic chambers and related auxiliary materials, widely used in confidential, military and scientific research fields.
3.3 Brand and Qualification Honors
The core brand KITOZER (Pioneer) focuses on computer room equipment and shielding products, positioned as an “efficient, green, innovative and safe” solution provider. Products have passed multiple authoritative tests and comply with national and industry standards. The company holds multiple utility model patents and software copyrights, has been awarded high-tech enterprise qualification, and follows the ISO9001 quality management standard.
3.4 Core Competitive Advantages
1. Source production, controllable quality: own production base and professional processing equipment; core products independently produced with full-process quality control, providing more cost-effective solutions without intermediate links;
2. Customized design, matching needs: tailor-made solutions per site conditions, technical requirements, configuration and budget, with multiple design options provided free of charge;
3. Professional team, rich experience: a professional technical team of engineers and project managers with more than ten years of industry experience;
4. Quality after-sales, full guarantee: a 7×24 professional online service system with dedicated project follow-up from early coordination to later O&M.
4. Project Background and Objectives
4.1 Project Background
With mobile phone penetration among students, campus phone management has become a key issue: exam cheating via phones in standardized examination rooms, distracted learning in classrooms and libraries, information leaks in confidential meetings, and phone theft risks. Active signal jammers violate radio regulations and pose radiation concerns. A passive, physically shielded phone storage cabinet — no power, no radiation, fully compliant — provides the compliant solution for centralized campus phone management and physical signal isolation.
4.2 Project Objectives
Provide a 60-cell floor-standing school phone shielding cabinet with dual-layer shielding (overall cabinet + independent cells): full-band signal shielding (5G Sub-6GHz, 4G/3G/2G, WiFi 2.4G/5G, Bluetooth, NFC, GPS/BeiDou) with shielding effectiveness >=70dB at 800MHz-3GHz and >=60dB at 10kHz-10GHz; two-level lock management (administrator master door + individual cell locks); safe storage without damaging phones; optional intelligent upgrade (touch terminal, IC card/face recognition, electric locks, background management); easy operation, expandable, compliant and environmentally friendly.
4.3 Scope
Standard mechanical model (60 cells) plus optional smart upgrade kit; grounding system; installation, shielding-effectiveness testing, training and after-sales; customization (cell count/size/color/logo/function) per school needs.
4.4 Compilation Basis
GB/T 12190-2021 (shielding effectiveness measurement), GA/T 73-2015 (B-class locks), GB/T 6739/GB/T 9286/GB/T 1732/GB/T 10125 (coating tests), GB 18401 (textile safety), UL94 (flame retardancy), ROHS, radio regulations (passive — no emission), school management requirements.
5. User Requirement Analysis
5.1 Functional Requirements
Reliable physical shielding of all mainstream communication signals when phones are stored; independent per-cell shielding (opening one cell does not affect others); safe storage with anti-scratch, anti-static lining; clear cell numbering and label slots; convenient two-level lock management; optional identity-based smart access with records.
5.2 Management Requirements
Examination rooms: batch storage before exams with individual keys; classrooms/offices: staff/student daily storage; confidential meetings: prevent recording/photography/data transmission; libraries/study rooms: voluntary storage to improve focus; administrator master control with emergency unlocking.
5.3 Performance Requirements
Shielding >=70dB (800MHz-3GHz) and >=60dB (10kHz-10GHz); cell fits <=6.7″ phones; cabinet static load >=200kg; verticality <=3mm after installation; grounding <=4 ohm; service life >=15 years; no power needed (mechanical model).
5.4 Safety and Compliance
No electromagnetic radiation (passive); no impact on phone hardware; no interference with surrounding devices; complies with radio and environmental regulations; fire-retardant materials; anti-static design.
5.5 Service Requirements
Warranty 12 months; 7×24 hotline with 2h response, 24h/48h on-site; quarterly follow-up and annual inspection; spare parts (conductive foam, locks, slides) available; training for administrators.
6. Design Principles and Applicable Standards
6.1 Design Principles
Physical shielding, compliance first: passive Faraday-cage approach — no power, no radiation, fully legal. Dual-layer architecture: overall cabinet shielding plus independent cell shielding; multi-stage seam sealing (beryllium-copper springs + conductive foam). Complete conduction: all-welded steel, continuous electrical continuity (<=0.1 ohm), reliable grounding. Campus-fit management: two-level lock control, clear numbering, simple operation with zero learning cost. Durable and expandable: thick steel, full welds, reinforcing ribs; modular; mechanical-to-smart upgrade path. Customizable: cell count/size/color/logo/function per school.
6.2 Applicable Standards
Per section 4.4 (GB/T 12190, GA/T 73, GB/T 6739/9286/1732/10125, GB 18401, UL94, ROHS).
7. System Architecture and Working Principle
7.1 Electromagnetic Shielding Principle
A conductive/enclosed cavity blocks electromagnetic waves through reflection, absorption and multiple-reflection losses: high-conductivity materials (steel, copper) reflect most incident waves; waves entering induce eddy currents converting energy to heat; internal multiple reflections add loss. This cabinet is a small Faraday cage — fully welded steel body, conductively sealed doors and drawers — providing full-band signal isolation. Unlike active jammers, physical shielding needs no power, emits nothing and does not interfere with surroundings.
7.2 Overall Architecture
KITOZER 60-cell floor-standing cabinet with “overall cabinet shielding + independent cell shielding” dual-layer architecture plus grounding and optional smart management: outer shield — fully welded electrolytic-steel body with beryllium-copper spring-sealed double doors (primary cavity); inner cells — 60 independent tin-plated steel drawers with conductive foam at each opening (secondary cavities; opening one does not leak others); grounding — dual M8 brass terminals to the building grid (drains static, improves low-frequency effectiveness); locks — B-class anti-theft three-point master locks + independent cell mailbox locks + emergency tools; smart option — touch terminal, identity module, electric locks, status LEDs, background software.
7.3 Subsystem Design
Body: 1.2mm DC04 electrolytic steel, NC bending + continuous argon full welding (no seam leakage), ground smooth + conductive passivation; internal reinforcing ribs; 4 adjustable galvanized feet (+-20mm); 4 wall-fixing holes; full pretreatment (alkaline degrease -> rinse -> acid pickle -> phosphating -> pure rinse -> dry) then electrostatic powder coating (60-80um, RAL7035, custom colors). Shielding: multi-level seam sealing — outer doors with full-perimeter high-elasticity beryllium-copper finger springs (uniform compression, continuous conductive plane); each drawer opening with high-conductivity polyurethane foam (compressed seal, good push feel); all metal parts electrically connected (<=0.1 ohm) forming an equipotential Faraday cage. Locks: two-level control — master three-point locks (top/middle/bottom, anti-pry, admin keys) + per-drawer zinc-alloy mailbox locks (interchange rate <=1/10,000, user keys) + emergency unlocking tools (admin-registered). Internal: anti-static flock lining per drawer (cushioning, scratch protection, static discharge); laser-engraved cell numbers + transparent PVC label slots (name/class/department, replaceable); two-section ball-bearing slides with auto-latch positioning. Grounding: 2 M8 brass terminals (bottom left/right), 6mm2 yellow-green multi-strand wire to the building grid, resistance <=4 ohm — drains static, ensures equipotential, improves low-frequency shielding.
8. Detailed Technical Design
8.1 Cabinet Sheet-Metal System
Main frame: DC04 cold-rolled electrolytic steel (C<=0.08%, Mn<=0.40%, P<=0.025%, S<=0.020%, Al>=0.020%; yield >=180MPa, tensile 270-410MPa, elongation >=34%); frame 1.2mm +-0.05, back/top 1.0mm; 1570x780x325mm +-2mm; overall folding + argon full welding, 4 vertical + 2 horizontal ribs; front flatness <=1.5mm/m2; verticality <=3mm installed; static load >=200kg (per-cell >=5kg); full welds >=2mm bead, ground + passivated, weld surface resistance <=0.1 ohm; IP50 indoor; 2 ground holes + 4 wall holes. Outer doors: 2 x 760x380mm, 1.2mm DC04, double-leaf; 3 stainless damping hinges each, opening >=110°, hinge life >=100,000 cycles; plated conductive sealing faces (contact <=0.05 ohm); reinforced lock zones. Separators: 0.8mm DC04, 10 rows x 6 columns = 60 cells; cell internal 82x47x218mm +-1mm; groove positioning + screws (>=4 points/plate); conductive contact <=0.1 ohm; deburred rounded edges. Surface treatment: process per 7.3; coating 60-80um (<=10um deviation), hardness >=2H, adhesion grade 0, impact >=50kg-cm, salt spray >=500h, matte 20-30°, RAL7035, ROHS.
8.2 Shielding Core System
Independent drawer: SPTE tin-plated steel, tin >=2.8g/m2 both sides, 0.6mm +-0.03, one-piece stamped (no seams); internal 78x43x215mm; fits <=6.7″ phones <=12mm thick; two-section silent ball-bearing slides, travel >=180mm, life >=50,000 cycles; stainless latch (5-8N pull-out); surface resistance <=0.05 ohm; per-cell shielding >=70dB (800MHz-3GHz). Beryllium-copper finger springs: QBe2.0 (Be 1.8-2.0%, Ni 0.2-0.4%), age-hardened, HV350-400; 0.2x10mm; contact resistance <=0.01 ohm/point; seam attenuation >=20dB; elastic recovery >=95% at 30% compression; life >=100,000 cycles; salt spray >=1000h; slot + screw mounting, no gaps; -40~+120 degC. Conductive foam: polyurethane sponge 25kg/m3, Cu+Ni double plating (Cu >=0.5um, Ni >=0.3um), surface resistance <=0.05 ohm/sq, volume resistivity <=0.01 ohm-cm; 3x8mm; permanent deformation <=10% (50% compression 24h); shielding >=30dB (10MHz-10GHz); 3M conductive adhesive >=3N/cm; UL94 V-0; -40~+85 degC; 45° miter continuous. Overall effectiveness (GB/T 12190-2021): 10k-100kHz >=60dB; 100k-1MHz >=65dB; 1-100MHz >=70dB; 100-800MHz >=75dB; 800MHz-3GHz >=70dB; 3-10GHz >=65dB. Coverage: GSM900/1800, CDMA2000, WCDMA, TD-SCDMA, LTE-FDD/TDD, 5G NR Sub-6GHz, WiFi 2.4G/5G, Bluetooth, NFC, GPS/BeiDou — phones have no signal, cannot call/message/connect/locate/transmit.
8.3 Lock System
Master three-point lock: Zamak5 zinc alloy chrome-plated body; copper blade cylinder; three-point linkage (top/middle/bottom, throw >=10mm); interchange <=1/100,000; GA/T 73-2015 B-class; anti-technical >=5min, anti-force >=15min; life >=50,000 cycles; 3 copper keys; -20~+70 degC. Cell mailbox lock: Zamak3 zinc alloy, powder-coated matching color; pin cylinder; 90° rotary latch; interchange <=1/10,000; life >=30,000 cycles; 2 flat keys; anti-pick plate; front embedded. Emergency tools: food-grade stainless, universal for all cell locks, 2 per cabinet, admin-registered.
8.4 Internal Storage and Labeling
Anti-static flock lining: black long-pile, 200g/m2, 2mm +-0.2; surface resistance 10^6-10^9 ohm; eco adhesive no lifting; >=5,000 rubs; GB 18401 B-class, no odor/formaldehyde. Numbering: fiber laser, 01-60 (custom rules), permanent. Label slot: high-transparency PVC 0.5mm, 30x15mm U-slot, adhesive mounting, blank labels included.
8.5 Grounding
Terminals: H62 brass M8 internal thread, nickel-plated, contact <=0.01 ohm, rated >=50A, 2 units, with washers/lock nuts. Wire: BVR 6mm2 yellow-green (19/0.64mm oxygen-free copper, PVC, 450/750V), 1.5m standard, OT-8 crimped ends, insulation >=100M ohm. Requirement: to the building grid, <=4 ohm, annual check.
8.6 Optional Smart System
Touch terminal: 7″ IPS capacitive 1024×600; ARM A7 quad 1.2GHz; 1GB DDR3; 8GB Flash; embedded Linux; Chinese GUI; 2 RS485 + USB; DC12V <=10W; embedded above the front; -10~+60 degC. Identity module: IC card (Mifare One, ISO14443A, 13.56MHz, 0-5cm, <=0.3s, 10,000 users, RS485, encryption, campus-card compatible) or face recognition (2MP wide-dynamic dual camera, visible+IR liveness, <=0.5s, >=99.5%, 5,000 faces, 0-10,000Lux). Electric lock: electromagnetic DC12V, power-on open / power-off closed, <=200mA, holding >=50N, response <=0.1s, life >=100,000, status feedback, embedded in drawer; Status LEDs: SMD red/green per cell, >=50,000h. Background software: C/S; user management with batch import/export; multi-level admin permissions; all access records queryable by time/person/cell; real-time cell state; usage statistics reports; Excel export; >=1-year local records; TCP/IP networking to smart campus.
9. Recommended Configuration and Preliminary Budget
9.1 Configuration Summary
Standard mechanical (60 cells): main frame (1.2mm, 1570x780x325), separators (60 cells), 2 doors, 60 tin-plated drawers, 2 beryllium-copper spring sets, 60 conductive foam strips, 2 master locks (B-class), 60 mailbox locks, 2 emergency tools, 60 anti-static linings, 60 numbering/label sets, 4 feet, 2 grounding terminals, nameplate. Optional smart kit: touch terminal, identity module, 60 electric locks, 60 status LEDs, background software, DC12V/5A adapter, control board (60-way). Installation/services: ground wires, expansion bolts, sealing tape, transport, installation/commissioning + shielding test, acceptance documents, 12-month warranty.
9.2 Budget Notes
Standard 60-cell mechanical cabinet, mechanical-to-smart upgrade priced separately; customization (cells, size, color, logo, functions) quoted per request; tax-inclusive in RMB (CNY) only; delivery standard 3-5 days in stock, custom 7-15 days; includes shielding-effectiveness test report and 12-month warranty.
10. Technical Specifications
10.1 System Specification Summary
| Item | Specification |
|---|---|
| Cabinet | 1570x780x325mm; DC04 electrolytic steel frame 1.2mm (back/top 1.0mm); argon full welds >=2mm; 4+2 reinforcing ribs; IP50; static >=200kg; front flatness <=1.5mm/m2; coating 60-80um RAL7035 (custom); salt spray >=500h; life >=15 years |
| Cells | 60 (10×6), internal 82x47x218mm; 0.8mm separators; 0.6mm SPTE tin-plated drawers (tin >=2.8g/m2), one-piece stamped; fits <=6.7″ phones; two-section ball slides >=50,000 cycles; per-cell shielding >=70dB (800MHz-3GHz) |
| Shielding | 10kHz-10GHz >=60dB overall; 800MHz-3GHz >=70dB; 100-800MHz >=75dB (GB/T 12190-2021); beryllium-copper springs QBe2.0 (contact <=0.01 ohm, >=100,000 cycles, recovery >=95%); conductive foam Cu+Ni (<=0.05 ohm/sq, UL94 V-0, deformation <=10%); covers 5G/4G/3G/2G, WiFi 2.4/5G, BT, NFC, GPS/BeiDou |
| Locks | Master: B-class (GA/T 73-2015) three-point zinc alloy, interchange <=1/100,000, anti-technical >=5min; cell: mailbox locks interchange <=1/10,000, 2 keys each; emergency tools x2 |
| Grounding | 2 M8 H62 brass terminals (>=50A, <=0.01 ohm); BVR 6mm2 yellow-green to building grid; resistance <=4 ohm |
| Smart option | 7″ touch (ARM A7, Linux); IC card (13.56MHz, 10,000 users, campus-card compatible) or face recognition (>=99.5%, 5,000 faces, liveness); 60 electric locks (DC12V, >=100,000); 60 status LEDs; background software (C/S, records, reports, Excel, >=1yr, TCP/IP) |
| Performance | Shielding effectiveness verified per GB/T 12190 with test report; verticality <=3mm; zero power (mechanical); no radiation; compliance GA/T 73, UL94, ROHS |
| Schedule/service | Standard ~10 days (custom ~15, incl. transport/install); 12-month warranty; 7×24 support, 2h response, 24h/48h on-site; quarterly follow-up, annual inspection; spare parts available |
10.2 Standards Compliance
GB/T 12190-2021 (shielding measurement), GA/T 73-2015 (B-class locks), GB/T 6739/9286/1732/10125 (coating), GB 18401 (textile), UL94 V-0 (flame), ROHS, radio regulations (passive, no emission); third-party shielding-effectiveness test report delivered.
11. Key Advantages and Customer Value
11.1 Technical Performance
Passive physical shielding, compliant and safe: no power, no radiation, no interference with surroundings — fully compliant, avoiding the legal risk of active jammers. Dual-layer shielding: overall cabinet + independent cells with multi-stage seam sealing — effectiveness far above industry average, full-band, no dead corners. Independent cells: opening one drawer does not affect others — safer than whole-open cabinets. Durable: thick steel, full welds, reinforcing ribs; 15+ year life.
11.2 Management Convenience
Two-level control for campus: administrator master doors + user cell locks — clear responsibilities for exams, teaching buildings and offices. Zero learning cost: mechanical model needs no power or training. Clear labeling: laser numbers + replaceable labels for quick location by class/department/exam room. Flexible expansion: multi-cabinet combination; mechanical-to-smart upgrade path.
11.3 Product and Service
Source factory, controlled quality: own production base, full-process QC, reliable delivery, better price. Full customization: cells, size, color, function, labeling; free design options. One-stop service: design, production, transport, installation, testing, training, after-sales. Complete support: 7×24 hotline, 24h/48h on-site, lifetime maintenance.
11.4 Cost Benefits
Zero running cost: no electricity, no consumables. Low maintenance: pure mechanical, few wear parts, no specialist needed. Risk reduction: compliant (no jammer penalties), prevents phone loss and cheating. Long-term value: durable, upgradable, high ROI.
12. Technical Q&A (50+ Items)
12.1 Fundamentals
Q1: How does the shielding cabinet work?
A: Faraday-cage principle — a high-conductivity metal enclosed cavity blocks signals by reflecting and absorbing electromagnetic waves, so stored phones receive no base-station signal and cannot transmit — physical-level shielding.
Q2: Difference from signal jammers?
A: Cabinet — passive physical shielding, no radiation, fully compliant, only shields inside, zero running cost; jammer — active device emitting interference, has radiation, violates radio regulations if used privately, covers an area and may disturb nearby devices.
Q3: Campus application scenarios?
A: Standardized examination rooms (gaokao/zhongkao); teaching buildings, offices and administrative buildings; confidential meeting rooms; libraries, study rooms and labs.
Q4: Does storage damage phones?
A: No — only blocks signals; anti-static flock lining cushions and protects; reliable grounding prevents static damage.
Q5: Does it shield 5G?
A: Yes — covers 5G NR Sub-6GHz full band (all three carriers) plus 2G/3G/4G, WiFi and Bluetooth.
Q6: Does it need power?
A: Mechanical model — no; smart model — low-power DC12V for electric locks/touch terminal.
Q7: How many phones per cabinet?
A: Standard 60; custom 10-200 cells; multi-cabinet combination.
Q8: Does it fit large phones?
A: Cell 78x43x215mm fits <=6.7″ phones with normal cases; larger cells custom for tablets/radios/laptops.
Q9: Does it block GPS/BeiDou positioning?
A: Yes — satellite signals are electromagnetic waves blocked by the cavity; no positioning possible.
Q10: Does it prevent recording?
A: It blocks wireless transmission of recordings but not the microphone itself; recording-jamming devices available if needed.
12.2 Performance
Q11: Shielding effectiveness and standard?
A: >=70dB at 800MHz-3GHz (mobile bands), >=60dB at 10kHz-10GHz, per GB/T 12190-2021 with third-party test report.
Q12: What does 70dB mean?
A: Field attenuated to ~1/3162, power to ~one-millionth — phones receive no usable signal.
Q13: Do door gaps leak?
A: No — continuous beryllium-copper springs on doors and conductive foam at drawer openings, uniformly compressed into continuous conductive seals.
Q14: Does frequent opening degrade shielding?
A: No — springs retain >=95% elasticity after 100,000 cycles; foam permanent deformation <=10%.
Q15: Do welds leak?
A: No — continuous argon full welds with no voids, ground smooth and conductively passivated (surface resistance <=0.1 ohm).
Q16: What material and thickness?
A: DC04 electrolytic steel — frame 1.2mm, back/top 1.0mm, separators 0.8mm, drawers 0.6mm SPTE tin-plated.
Q17: Does powder coating affect shielding?
A: No — coating is on the exterior only; internal contact/sealing faces are masked and conductively treated.
Q18: Lock security?
A: Cell interchange <=1/10,000; master interchange <=1/100,000 with B-class cylinder and three-point locking.
Q19: Anti-static?
A: Yes — grounded cabinet drains static; anti-static lining 10^6-10^9 ohm prevents damage.
Q20: Service life?
A: Body 15+ years; wear parts (foam 3-5yr, springs 8-10yr, locks/slides) replaceable individually.
12.3 Installation
Q21: Is professional installation needed?
A: Mechanical — adjust level and use; grounding/wall fixing by electrician or our installer; smart — professional installation required.
Q22: Is grounding mandatory?
A: Recommended for safety and low-frequency performance — drains static and ensures equipotential; without it high-frequency shielding mostly remains but static risk and low-frequency effectiveness suffer.
Q23: Where to connect the ground?
A: M8 brass terminal -> 6mm2 yellow-green wire -> building grounding bus/equipotential box/reinforcement; resistance <=4 ohm.
Q24: Wall-mount possible?
A: Small models (20/30 cells) yes; >=60 cells floor-standing with optional wall anchoring against tipping.
Q25: Environment requirements?
A: Indoor dry ventilated; -10~+40 degC; RH <=85%; no corrosive gas/strong EMI/vibration; avoid outdoor, damp, direct sun.
Q26: Can cabinets be combined?
A: Yes — standardized dimensions, side-by-side with sealed joints.
Q27: Transport precautions?
A: Upright, no impact/pressure; lift don’t drag; level after positioning; check drawers and seals.
Q28: How to verify shielding on site?
A: Place a phone in a drawer, lock it, call it — “unreachable” confirms; signal bars drop to zero; professional test per GB/T 12190 with spectrum analyzer provided at delivery.
12.4 Use and Maintenance
Q29: Daily use precautions?
A: Gentle open/close; no heavy/sharp objects on top; keep clean and dry; no self-disassembly; keep keys safe; check grounding periodically.
Q30: Cleaning?
A: Soft dry cloth; neutral detergent for stains then dry; never strong acids/bases/thinner/gasoline; clean sealing faces with dry brush only.
Q31: Drawer not sliding smoothly?
A: Check leveling; clear slide debris; apply small amount of silicone oil (not cooking/grease oil); replace damaged slides.
Q32: Lost key?
A: Cell key — admin emergency tool opens, then replace cylinder; master key — factory service opens and replaces; no self-prying.
Q33: Shielding degraded — causes?
A: Door/drawer not fully closed; dust on springs/foam (dry brush); aged sealing parts (replace); body deformed by impact (factory correction); loose grounding (retighten).
Q34: Replacement cycles for seals?
A: Foam 3-5 years; beryllium-copper springs 8-10 years per use/environment; replace on elasticity loss or damage.
Q35: Long-term storage?
A: Clean, close all drawers/doors, keep indoors dry and ventilated, periodic check against moisture.
Q36: Phones stored long-term?
A: Safe; recommend powering off and removing removable batteries to avoid deep discharge.
12.5 Customization and Purchase
Q37: Custom cell count and size?
A: 10-200 cells; length/width/height per stored items (phones, tablets, radios, USB drives, laptops).
Q38: Custom colors and appearance?
A: RAL7035 standard; school VI colors; silk-screen logos/names/slogans.
Q39: Custom smart functions?
A: Fingerprint, password, QR code, networked management; campus-card and smart-campus integration.
Q40: Delivery time?
A: Standard in stock 3-5 days; custom 7-15 days per complexity.
Q41: On-site installation service?
A: Nationwide installation, commissioning and training by professional technicians.
Q42: Warranty and after-sales?
A: 12-month whole-unit (smart system 12 months); lifetime repair at cost; 7×24 hotline, 2h response, 24h/48h on-site; wear parts (foam/locks/slides) paid replacement.
Q43: Certifications and reports?
A: Third-party shielding-effectiveness test report, high-tech enterprise certification, product patents.
Q44: Sample testing?
A: Yes — samples for batch customers before ordering.
Q45: Is the smart upgrade worth it?
A: For large deployments and audit needs (records, permissions) yes; mechanical is fully adequate for exam-room and simple campus use.
Q46: How is the smart system powered?
A: DC12V/5A 3C adapter; control board drives 60 electric locks; low consumption.
Q47: Can face recognition work in low light?
A: Yes — dual camera with IR liveness, 0-10,000Lux adaptability.
Q48: How are smart records managed?
A: All access recorded (time/person/cell), queryable, Excel export, >=1-year local storage, TCP/IP to smart campus.
Q49: Why choose KITOZER/Lain?
A: Source factory, 20+ years of shielding expertise, certified performance, full customization, one-stop service.
Q50: What makes it cost-effective?
A: Zero running cost, low maintenance, compliance risk avoidance, 15-year life and upgrade path — best long-term value.
13. Construction Schedule
13.1 Schedule (Standard 60-Cell)
| No. | Stage | Work | Duration | Responsible | Acceptance node |
|---|---|---|---|---|---|
| 1 | Preparation | Site survey, requirement confirmation, scheme, contract, order | 2d | PM, sales | Scheme confirmation, contract |
| 2 | Production | Sheet-metal cutting, bending, welding, surface, assembly, factory QC | 7d | Production lead, QC | Factory report, certificate |
| 3 | Transport | Packing, logistics, delivery, count/sign | 2d | Logistics | Receipt |
| 4 | Installation | Positioning, leveling, grounding, wall fixing, wiring (smart) | 1d | Installer, electrician | Leveled, ground test pass |
| 5 | Testing | Shielding test, lock debug, smart system debug, function tests | 1d | Engineer, QC | Shielding report, test records |
| 6 | Acceptance | Customer acceptance, documentation, training, sign-off | 1d | PM, customer | Acceptance report |
| 7 | After-sales | Periodic visits, fault response, maintenance | Full cycle | After-sales | Visit records |
Total: standard ~10 days incl. transport/installation; custom ~15 days; multi-cabinet parallel.
14. Construction Organization and Quality/Safety Measures
14.1 Organization
PM (1): overall progress, quality, coordination, acceptance. Technical lead (1): scheme disclosure, on-site guidance, testing, documentation. Installers (2): cabinet installation, grounding, accessories, cleanup. Safety officer (1, part-time): safety management and supervision. After-sales specialist (1): training, follow-up, response.
14.2 Preparation
Technical: review scheme/drawings; technical and safety disclosure; tools and instruments (impact drill, level, multimeter, earth-resistance tester, wrenches, screwdrivers) ready; coordinate position, grounding point, entry time and power/water with the school. Materials: verify products/accessories complete and qualified; prepare expansion bolts, ground wires, ties, sealant; PPE (helmet, gloves, insulating shoes, goggles). Site: clear and level the area; confirm power (smart) and grounding availability; protect school finishes; schedule outside teaching/office hours.
14.3 Process Flow
Mechanical: position/mark -> unpack/check -> place -> level (verticality <=3mm, level <=2mm) -> ground terminal wiring -> drill wall holes -> expansion-bolt fixing -> ground resistance test -> drawer/lock debug -> shielding test -> cleanup -> self-check. Smart: same plus smart component installation, wiring, power connection, system power-on debug, full function tests, shielding test.
14.4 Quality Control
Per national codes and product requirements — each process self-checked before next; verticality <=3mm, level <=2mm; grounding per electrical safety code (<=4 ohm, firm, insulated); neat wiring with firm joints; sealing faces protected (no scratches/contamination); hidden work checked before covering; full function + shielding tests before acceptance.
14.5 Safety and Civilized Construction
PPE and school safety rules; certified electrician for electrical work (no random wiring); harnesses for high work; check walls for cables/pipes before drilling; tools secured; emergency plan; tidy dress and conduct; schedule away from teaching/office hours; noise control; daily cleanup (work done, materials clean); compensate for any damage.
14.6 Finished-Product Protection
Packing protection during transport/handling; protect coating from tool scratches; post-install protection against renovation pollution and misuse; locks, keys and accessories secured and handed over uniformly.
15. After-Sales Service
15.1 Warranty Commitment
12-month whole-unit and smart-system warranty from acceptance; free repair/replacement/on-site service for quality faults; lifetime repair at parts + reasonable service cost; wear parts (foam, cylinders, slides) paid replacement.
15.2 Response
7×24 hotline; technical consultation solution within 1h; fault report response within 2h (remote first); on-site within 24h (province) / 48h (nationwide, remote extended); major emergencies with expedited response.
15.3 Service Content
Quarterly follow-up in warranty (semi-annual after); annual free on-site inspection (full check, cleaning, debugging); original spare parts shipped within 3 working days; mechanical-to-smart upgrade and function additions; lifetime free technical consultation.
15.4 Flow
Report -> register -> remote triage -> on-site repair -> customer confirmation -> 3-day follow-up and archive.
15.5 Exclusions
Human damage, unauthorized modification, force majeure, non-original parts, normal wear of consumables.
16. Training Plan
16.1 Training Objectives and Audience
Training objectives: through systematic training, enable management personnel to fully understand the system structure, working principles and performance characteristics, master daily operation methods and inspection/maintenance essentials, identify common faults and handle simple problems, ensuring safe, stable and long-term operation.
Training audience: management and O&M personnel designated by the client, recommended 2-3 persons with basic electrical and equipment knowledge.
16.2 Tiered Training Content System
Level 1: Basic operation training (1 day)
– Basic principles: system concepts, structure composition, performance indicators;
– Daily operation standards: correct operation of equipment, control and safety systems;
– Daily inspection contents: daily/weekly/monthly check items;
– Safety precautions: usage prohibitions and emergency handling procedures.
Level 2: Maintenance training (1 day)
– Detailed structure of each subsystem and working principles;
– Daily maintenance methods: cleaning, fastening checks, routine care;
– Common fault identification and simple handling;
– Emergency handling procedures for power failure, fire and equipment faults.
Level 3: Advanced management training (as needed)
– Performance influencing factors and how to avoid degradation;
– Upgrade and expansion knowledge and specification requirements;
– Relevant national standards interpretation.
16.3 Training Methods and Schedule
– Methods: combination of “theory explanation + on-site practice + Q&A interaction”;
– Schedule: training arranged at the completion acceptance stage, synchronized with handover, 2 days of intensive training total; time flexibly adjustable; a free repeat training session is provided for newly assigned personnel.
16.4 Training Assessment and Documentation Delivery
– Assessment: theory written test plus practical operation; training qualification certificates issued upon passing; supplementary training for those who fail;
– Documentation delivery: complete O&M documentation, including operation and maintenance manual, equipment manuals and certificates, completion drawings and hidden work records, test reports and after-sales service contact card, all bound into volumes.
17. Anonymous Typical Project Scenarios
All project scenarios below are anonymous, generalized examples provided for reference only. No real customer names, addresses or identifiable details are disclosed.
17.1 City No.1 Middle School Examination-Room Phone Shielding Project
Background. A provincial standardized examination site hosting gaokao, zhongkao and academic-level exams needed compliant, safe, manageable phone storage outside each exam room.
Solution. 30 x 60-cell standard mechanical shielding cabinets, one per exam room; students store phones in assigned cells with keys kept individually or centrally.
Results. Excellent shielding (phones completely signal-free); orderly independent-cell management with zero loss/mix-ups; simple operation for invigilators and students — highly recognized by school and examination authorities.
17.2 University Administration Building Phone Shielding Project
Background. Multiple confidential meeting rooms and administrative offices needed centralized phone management with traceable smart access.
Solution. 8 x 48-cell smart IC-card cabinets at floor entrances and meeting-room doors, integrated with the campus one-card system; staff swipe to store/retrieve; temporary cards for visitors; unified background records.
Results. Stable smart system with convenient access and traceable records; shielding met requirements protecting confidential meetings; clean appearance matching the building — raised the school’s information-management image.
17.3 Vocational College Library Phone Shielding Project
Background. Students frequently brought phones into the study room — ringtones and scrolling disrupted study; loose phones also risked theft.
Solution. 4 x 120-cell large-capacity mechanical cabinets at the library entrance; self-service storage with administrator master control; cells for temporary or long-term rental.
Results. Large capacity met peak demand; orderly storage; noticeably improved student focus in the study area; durable under high-frequency use — praised by teachers and students.
18. SEO Optimization Section
All reference prices in this technical solution are in RMB (CNY) only and are for reference purposes; final quotation is subject to the confirmed configuration.
18.1 Keyword System
– Core keywords: technical design solution, system configuration, technical parameters, construction and O&M services;
– High-conversion long-tail keywords: design solution, configuration list, technical parameters, construction plan, after-sales service;
– Industry traffic keywords: system architecture, applicable standards, technical Q&A, project cases;
– Brand keywords: KITOZER, Guangzhou Lain.
18.2 SEO Tag System
– Title tag: the article title — Guangzhou Lain KITOZER;
– Meta description: Guangzhou Lain professionally provides complete technical design solutions with detailed configuration list, full-system product technical parameters, construction organization plan and after-sales service — source manufacturer customization, compliant performance, third-party testing supported;
– H1 tag: the article title;
– H2 tags: system design and product parameters, construction organization plan, after-sales service and training, engineering cases.
18.3 Internal Link Anchor Text
– Core anchor text: technical design solution, system construction;
– Long-tail anchor text: configuration list, technical parameters, construction plan;
– Related anchor text: shielding cabinet, micro-module cold aisle, integrated computer room, outdoor cabinet.
19. Official Contact Information
– Company Name: Guangzhou Lain Intelligent System Development Co., Ltd.
– Brand: KITOZER (Pioneer)
– Official Website: https://gdlain.com
– Tel: +86 13538869979 (Tel / WhatsApp)
– Address: No. 5 Huashan Road, Shilou Town, Panyu District, Guangzhou, China
For any inquiries about this technical design solution, configuration customization, quotation or construction services, please contact us through the information above. We provide free design consultation and tailored solutions for your specific requirements.