Shielded Area Video Surveillance Installation Manual

Table of Contents

Preface

This manual is a comprehensive technical guidance document compiled by Guangzhou Lain Intelligent System Development Co., Ltd. for dedicated video surveillance equipment used in shielded areas. It covers the entire product lifecycle, including design principles, equipment composition, technical parameters, installation and construction, wiring specifications, commissioning and validation, operation and maintenance, fault diagnosis, and acceptance and delivery. It is applicable to the deployment and operation of video surveillance systems in special scenarios such as various electromagnetic shielding spaces, classified and confidential facilities, EMC testing laboratories, and shielded computer rooms.

This manual is compiled in strict compliance with national and industry standards, including the *Technical Standard for Security and Protection Engineering* (GB 50348), the *Testing Requirements for Electromagnetic Shielding Enclosures of Classified Information Systems* (BMB 4-2021), the *Electromagnetic Compatibility – Testing and Measurement Techniques* series (GB/T 17626), the *Information Security Technology – Baseline for Classified Protection of Cybersecurity* (GB/T 22239), and the *Information Security Technology – Technical Requirements for Physical Security of Information Systems* (GB/T 21052). All technical requirements, construction specifications, and acceptance criteria conform to the security protection requirements of classified facilities and shielded spaces, ensuring that the deployment of the system does not degrade the shielding effectiveness of the original enclosure, while achieving high-definition, stable, and secure video surveillance coverage.

All construction personnel, commissioning engineers, and operation and maintenance management personnel must read this manual carefully before commencing work and strictly follow the specified procedures. Unauthorized construction, equipment modification, or system architecture changes are strictly prohibited to avoid degradation of shielding effectiveness, system failures, or security and confidentiality risks. The contents of this manual will be continuously updated along with product technology iterations. The final right of interpretation belongs to Guangzhou Lain Intelligent System Development Co., Ltd.

Scope of Application

This manual applies to the full series of shielded area video surveillance equipment manufactured by Guangzhou Lain Intelligent System Development Co., Ltd., including but not limited to:

  • The LA-SP series shielded fiber optic cameras
  • The LA-OT series shielded- room dedicated optical transceivers
  • The LA-WG series fiber optic waveguide tubes
  • The LA-NVR series shielded network video recorders
  • The LA-DSP series shielded surveillance display terminals

It covers system configurations of various channel counts, including single-channel, 4-channel, 8-channel, 16-channel, and 32-channel.

Applicable scenarios include, but are not limited to:

  • Classified shielded computer rooms, confidential archives rooms, and cryptography rooms of Party and government agencies, military units, and scientific research institutions.
  • Electromagnetic Compatibility (EMC) laboratories, anechoic chambers, and RF testing shielded rooms.
  • Data center shielded computer rooms of financial institutions and confidential meeting rooms of securities exchanges.
  • Hospital MRI rooms and dust-free shielded workshops for precision electronics manufacturing.
  • Other special venues with strict requirements for electromagnetic shielding effectiveness and information leakage prevention.

Compilation Basis

The following national, industry, and local standards and specifications were strictly followed during the compilation of this manual:

Standard Description
GB 50348-2018 *Technical Standard for Security and Protection Engineering*
BMB 4-2021 *Testing Requirements for Electromagnetic Shielding Enclosures of Classified Information Systems*
BMB 3-2019 *Technical Requirements for Classified Protection of Classified Information Systems*
GB/T 17626.1~12-2017 *Electromagnetic Compatibility – Testing and Measurement Techniques* series
GB 9254-2008 *Limits and Methods of Measurement of Radio Disturbance Characteristics for Information Technology Equipment*
GB/T 22239-2019 *Information Security Technology – Baseline for Classified Protection of Cybersecurity*
GB/T 21052-2007 *Information Security Technology – Technical Requirements for Physical Security of Information Systems*
GB 50174-2017 *Code for Design of Data Centers*
GB 50311-2016 *Code for Engineering Design of Generic Cabling Systems*
T/FLXH 005-2024 *Technical Requirements for Lightning Protection of Video Surveillance Systems*
— *Regulations on the Administration of Public Security Video Image Information Systems* (State Council Order No. 799)

Terms and Definitions

  • Shielded Area: An enclosed space formed by metal shielding enclosures with specific electromagnetic shielding effectiveness, capable of suppressing the leakage of internal electromagnetic signals and the intrusion of external electromagnetic interference. Includes shielded computer rooms, shielded rooms, shielded cabinets, and anechoic chambers.
  • Shielding Effectiveness (SE): An index characterizing the attenuation capability of a shield against electromagnetic waves, expressed in decibels (dB). A higher value indicates stronger shielding capability.
  • Fiber Optic Waveguide Tube: A dedicated metal conduit installed on shielded walls. Based on the cutoff waveguide principle, it allows optical signals to pass while blocking the conduction of electromagnetic waves. It is the standard supporting device for optical signal ingress/egress in shielded spaces.
  • Low-Radiation Camera: Dedicated camera equipment with special electromagnetic shielding design, characterized by extremely low self-electromagnetic radiation that does not cause electromagnetic information leakage, suitable for use within shielded areas.
  • Optical Transceiver (Fiber Optic Transceiver): Transmission equipment for converting between optical signals and electrical signals. Consists of a transmitter and a receiver used in pairs to achieve fiber optic transmission of video, control, and other signals.
  • Electromagnetic Leakage: The phenomenon where internal electromagnetic signals radiate outward or external interference signals intrude inward due to structural defects in the shield, improper wall penetration by cables, or other reasons.
  • Red/Black Isolation: Physical isolation between classified information systems (red system) and unclassified information systems (black system), preventing classified information from leaking to unclassified systems through conduction, radiation, or other means.
  • PoE Power Supply: A power supply method that simultaneously transmits data signals and DC power over Ethernet cabling. In shielded areas, the use of standard PoE solutions to penetrate the shield is prohibited.
  • Infrared (IR) Illumination: A function that provides illumination for cameras by emitting infrared light in low-light environments, enabling clear imaging in monochrome mode. The light is invisible to the human eye.
  • Intelligent Analytics: Functions that utilize artificial intelligence algorithms for automated processing of video images, including human detection, intrusion alarm, abandoned object detection, and behavior analysis.

Chapter 1: Product Introduction

1.1 Product Development Background

With the rapid development of information technology, scenarios such as classified information processing, precision electronic testing, and high-end scientific research experiments impose increasingly stringent requirements on the electromagnetic environment. The scale of construction for various shielded computer rooms, shielded laboratories, and confidential meeting rooms continues to expand. In these special spaces, security surveillance is an indispensable management tool. However, ordinary civil video surveillance equipment suffers from two core pain points:

  • First, ordinary cameras have high self-electromagnetic radiation intensity, generating significant electromagnetic leakage signals that can be easily received and reconstructed by external devices, causing the leakage of classified information and test data, violating confidentiality management regulations.
  • Second, ordinary surveillance systems use metal cables such as network cables and coaxial cables for signal transmission. When these cables directly penetrate shielded walls, they form natural electromagnetic conduction paths, severely degrading the overall shielding effectiveness of the shield and causing the shielded space to lose its protective function.

To address these industry pain points, Guangzhou Lain Intelligent System Development Co., Ltd., leveraging its years of technical expertise in integrated shielded computer room solutions, has independently developed a full series of dedicated video surveillance equipment for shielded areas. The entire chain—from front-end acquisition, signal transmission, to back-end storage and display—has been optimized for electromagnetic shielding, thoroughly solving the electromagnetic leakage challenge of video surveillance within shielded spaces. This is achieved while retaining all the functions of modern surveillance systems, including high-definition imaging, intelligent analytics, and reliable performance, making the products widely adaptable to shielded venues of all classification levels.

1.2 Product Positioning

This series of shielded area video surveillance equipment is a dedicated security product specifically designed for high-level electromagnetic protection and information confidentiality venues. It is positioned as a professional-grade shielded surveillance solution featuring “zero leakage, high definition, strong compatibility, and easy deployment.” Distinct from ordinary civil and industrial-grade surveillance equipment, it focuses on the core safety requirements of “not degrading shielding effectiveness and not generating electromagnetic leakage,” while satisfying the operational needs of high-definition surveillance and intelligent management. It is the standard security equipment for classified shielded computer rooms, EMC laboratories, confidential meeting rooms, and similar venues.

1.3 Core Product Value

  • Shielding Security Value: Full-chain electromagnetic shielding design with low-radiation front-end equipment. Transmission utilizes fiber optic media coupled with dedicated waveguide tubes. Installation does not reduce the shielding effectiveness of the original shield, conforms to the BMB series confidentiality standards and electromagnetic shielding testing requirements, and can successfully pass confidentiality acceptance and shielding effectiveness testing.
  • Image Quality Value: Employs high-definition CMOS image sensors, supporting multiple resolution levels including 1080P and 4K. Features include wide dynamic range, low-light performance, and IR illumination, adapting to complex lighting conditions within shielded areas to deliver clear, detailed imaging that meets detail recognition requirements.
  • Reliability Value: Industrial-grade hardware design with wide temperature and voltage operating ranges. Strong anti-electromagnetic interference capability throughout the chain enables long-term stable operation in strong electromagnetic environments. Mean Time Between Failures (MTBF) ≥ 50,000 hours, reducing long-term operation and maintenance costs.
  • Intelligent Management Value: Supports intelligent functions such as human detection, area intrusion, crossing-line alarm, video playback, and remote management. Can be integrated with shielded room access control systems and alarm systems to enhance security management efficiency.
  • Compliance and Adaptability Value: Fully compliant with national confidentiality standards, electromagnetic compatibility standards, and security engineering standards. Adaptable to new construction and renovation of shielded venues. Supports customized development to meet individualized needs across different industries and classification levels.

1.4 Product Development History

Guangzhou Lain Intelligent System Development Co., Ltd. initiated R&D of shielded surveillance equipment in 2015 and has undergone multiple generations of technical iteration:

Year Milestone
2016 Launched the first-generation analog fiber optic shielded surveillance system, addressing basic video viewing needs in shielded rooms and filling a domestic gap for this category of products.
2018 Launched the second-generation digital HD shielded surveillance system with resolution upgraded to 1080P, H.264 encoding, network storage support, designed for small and medium-scale shielded computer rooms.
2021 Launched the third-generation intelligent shielded surveillance system with H.265+ encoding, integrated AI intelligent analytics, multi-system integration support, designed for high-level classified venues.
2024 Launched the fourth-generation all-scenario shielded surveillance system, covering multiple front-end form factors (bullet, dome, PTZ), supporting 4K ultra-HD resolution, optimized waveguide tube installation process (60% improvement in installation efficiency), and comprehensive adaptation to various shielded scenarios.

To date, this product series has been successfully deployed in more than 2,000 shielded projects nationwide, serving customers across Party and government agencies, military units, scientific research institutions, financial institutions, and healthcare organizations. Product performance and reliability have received wide market recognition.

1.5 Product Model Naming Convention

This product series uses a unified model naming convention to facilitate rapid identification of product type and parameters:

LA - SP □ □ - □
│   │   │  │   └─ Resolution ID: 200=2MP (1080P), 400=4MP, 800=8MP (4K)
│   │   │  └───── Form Factor ID: Q=Bullet, B=Dome, QJ=PTZ
│   │   └──────── Product Series No.: 1=Basic, 2=Standard, 3=Premium
│   └─────────── Product Type: SP=Shielded Camera, OT=Optical Transceiver, WG=Waveguide Tube, NVR=Storage Host
└─────────────── Brand ID: LA=Lain

Example: LA-SP2Q-200 denotes a Lain brand, Series 2 standard shielded bullet camera with 2-megapixel (1080P) resolution.

Supporting equipment follows the same naming system. For example:

  • LA-OT4-200: 4-channel shielded optical transceiver, compatible with 2-megapixel cameras.
  • LA-WG2-100: 2-hole fiber optic waveguide tube, 100mm in length.

Chapter 2: Product Composition

The shielded area video surveillance system employs a layered architecture design and can be functionally divided into five major units: Front-End Acquisition Unit, Fiber Optic Transmission Unit, Control and Storage Unit, Display and Control Unit, and Supporting Materials Unit. Each unit operates collaboratively to achieve complete surveillance functionality while ensuring electromagnetic shielding security throughout.

2.1 Front-End Acquisition Unit

The front-end acquisition unit serves as the “eyes” of the system, deployed within the shielded area to capture on-site video images and audio signals. All equipment is treated with low-radiation electromagnetic shielding treatment, with self-electromagnetic leakage far below the limits required by confidentiality standards, and will not cause electromagnetic pollution within the shielded space.

2.1.1 Shielded HD Cameras

Shielded HD cameras are the core equipment for front-end acquisition. Based on form factor and function, they can be divided into three categories — bullet cameras, dome cameras, and high-speed PTZ cameras — each adapted to different installation scenarios:

  • Shielded Bullet Camera: Rectangular form factor, suitable for wall-mount or bracket installation. Used for fixed-angle, wide-area surveillance such as shielded computer room entrances/exits, main aisles, and equipment row aisles. The lens can be fixed-focus or manual varifocal, adapted to different surveillance distances.
  • Shielded Dome Camera: Hemispherical ceiling-mount design, compact and discreet installation. Suitable for indoor ceiling mounting for small-area, multi-angle surveillance, such as shielded room corners, above equipment racks, and inside confidential archive rooms. Features vandal-resistant and dust-proof characteristics.
  • Shielded High-Speed PTZ Camera: Features 360° horizontal rotation and 90° vertical tilt, supports optical zoom, enabling wide-area surveillance without blind spots. Suitable for large shielded computer rooms, EMC anechoic chambers, and other open spaces. Pan/tilt/zoom can be controlled from the back end to flexibly adjust surveillance viewpoints.

All shielded cameras feature a multi-layer electromagnetic shielding structure internally:

  • The core circuit board is covered with a shielding enclosure.
  • The camera body uses an all-metal conductive housing.
  • Conductive sealing gaskets are installed at joints.
  • The power and signal interfaces incorporate built-in filter circuits.

This design minimizes electromagnetic radiation. The lens is made of optical glass, which does not affect imaging quality while maintaining the shielding continuity of the housing.

2.1.2 Front-End Auxiliary Acquisition Equipment

  • IR Illuminator: For completely dark shielded environments without natural light, a dedicated low-radiation IR illuminator is supplied. Wavelength: 850nm. Illumination distances are available in 10m, 30m, and 50m specifications depending on the model. It is also treated with electromagnetic shielding and starts/stops synchronously with the camera to achieve clear imaging in dark conditions.
  • Audio Pickup (Microphone): For audio surveillance requirements, a shielded high-fidelity pickup is supplied with an all-metal shielding housing and built-in signal filtering circuitry. It captures on-site audio signals and transmits them via coaxial cable to the optical transceiver for synchronized audio/video acquisition.
  • Protective Housing and Mounting Brackets: Indoor/outdoor protective housings, wall-mount brackets, ceiling-mount brackets, pole-mount brackets, etc., are selected based on the installation environment. All metal brackets must be reliably electrically connected to the shield to avoid forming floating potentials.

2.2 Fiber Optic Transmission Unit

The transmission unit serves as the “nerves” connecting the inside and outside of the shielded room and is the core link in ensuring shielding effectiveness. The entire path uses fiber optic media for transmission, combined with dedicated fiber optic waveguide tubes to penetrate shielded walls, thoroughly eliminating electromagnetic conduction leakage.

2.2.1 Fiber Optic Waveguide Tubes

The fiber optic waveguide tube is a dedicated wall-penetration device installed on shielded walls and is the standard compliant accessory for signal wall penetration in shielded rooms. It is designed based on the cutoff waveguide principle: when the wavelength of an electromagnetic wave is significantly larger than the inner diameter of the waveguide tube, the electromagnetic wave attenuates rapidly within the tube and cannot pass through. Visible light, however, has an extremely short wavelength and can pass through without loss, thereby achieving the effect of “passing light but not electricity.”

Lain series fiber optic waveguide tubes are manufactured from brass or stainless steel with smooth inner walls. Both ends are equipped with dedicated flanges for secure mounting to shielded walls. Conductive rubber strips are installed at connection points to ensure shielding continuity. Available in single-hole, double-hole, 4-hole, and 8-hole configurations based on the number of ports, adapted to different fiber optic transmission channel requirements.

2.2.2 Shielded Optical Transceivers

Optical transceivers consist of a transmitter (optical transmitter) and a receiver (optical receiver), used in pairs:

  • Transmitter: Deployed inside the shielded room. It receives electrical signals output from cameras, converts them to optical signals, and transmits them outward through fiber optic cables. It features an electromagnetic shielding housing with low-radiation design, which does not affect the indoor shielded environment.
  • Receiver: Deployed outside the shielded room. It restores the optical signals transmitted through the fiber back to electrical signals and outputs them to back-end storage and display equipment.

Available in 1-channel, 2-channel, 4-channel, 8-channel, and 16-channel models based on transmission capacity. Supports simultaneous fiber optic transmission of video, audio, control, and alarm signals. Some models support bidirectional data transmission, enabling PTZ control of cameras and alarm signal return.

Based on signal type, they are classified as analog optical transceivers and digital optical transceivers. Digital optical transceivers support HD network signal transmission, are compatible with mainstream HD network cameras, and are currently the mainstream selection.

2.2.3 Transmission Cables and Accessories

  • Indoor Optical Cables: Single-mode indoor optical cables are used within shielded rooms. The number of fiber cores is determined by the number of surveillance channels, with 4-core, 8-core, and 12-core being common. They feature flame-retardant, low-smoke zero-halogen (LSZH) characteristics suitable for indoor cabling.
  • Fiber Optic Patch Cords: Used for connections between equipment and optical cables. Available in SC, LC, FC, and other connector types, with single-mode 9/125 μm specifications and lengths selected as required. Connectors feature ceramic ferrules to ensure optical signal transmission stability.
  • Fiber Optic Termination Boxes: Used for splicing, securing, and protecting optical cables. Optical fiber couplers are installed inside to enable connection between cables and patch cords. Wall-mount installation with metal housing providing electromagnetic shielding.
  • Splice Protection Sleeves and Pigtails: Used for fiber optic splicing operations to protect splice points and reduce signal loss.

2.3 Control and Storage Unit

The control and storage unit is deployed in the monitoring room or duty room outside the shielded area. It is responsible for video signal encoding, storage, management, and intelligent analysis, serving as the “brain” of the system.

2.3.1 Shielded Network Video Recorder (NVR)

Dedicated shielded NVR host with an all-metal chassis and excellent electromagnetic compatibility performance. Supports multi-channel HD video access with functions including real-time preview, recording storage, playback and retrieval, alarm integration, and remote management.

  • Channel Capacity: Available in 4-channel, 8-channel, 16-channel, 32-channel, and 64-channel configurations, adapted to systems of various scales.
  • Storage Capacity: Supports 4/8/16 hard drive bays, with a maximum single-drive capacity of 20TB, satisfying continuous recording storage requirements of 90 days or more.
  • Encoding Format: Supports H.265+ intelligent encoding, significantly reducing storage space consumption while maintaining image quality.
  • Security Features: Supports hierarchical user permission management, operation log auditing, and video encryption storage, conforming to information security requirements for classified venues.
  • Expansion Interfaces: Equipped with alarm input/output interfaces, RS485 control interfaces, and HDMI/VGA display interfaces. Supports connection to alarm devices, control keyboards, and other peripherals.

2.3.2 Intelligent Analytics Server (Optional)

For high-level intelligent surveillance requirements, a standalone intelligent analytics server can be provided. It is equipped with professional AI algorithms to implement advanced intelligent functions including human detection, facial recognition, area intrusion, crossing-line alarm, abandoned/removed object detection, and people gathering detection. Analysis results can trigger actions on the NVR such as recording and alarming. The server uses industrial-grade hardware and can operate stably 24/7.

2.3.3 Control Keyboard (Optional)

Analog control keyboard supporting PTZ control, lens zoom, screen switching, and playback shortcuts. Suitable for security duty personnel. Connects to the NVR or decoder via RS485 interface, providing intuitive and convenient operation.

2.4 Display and Control Unit

The display unit serves as the “window” of the system, used for real-time presentation of surveillance images, playback of recordings, and system operation. It is deployed in the duty room and monitoring center.

2.4.1 Professional Surveillance Monitors

Industrial-grade LCD monitors specifically designed for continuous monitoring use. Features include high brightness, high contrast ratio, wide viewing angle, and low image retention. Available in 22-inch, 32-inch, 43-inch, and 55-inch sizes. Supports multiple signal inputs including HDMI, VGA, and BNC, and can directly connect to NVR or optical transceiver output signals.

2.4.2 Video Wall (Optional)

Large monitoring centers can be configured with LCD video walls featuring narrow bezel design. Supports multi-screen split display, single-screen enlargement, and roaming overlay functions. Used in conjunction with decoders to achieve centralized display of multiple video channels, enhancing surveillance visualization.

2.4.3 Surveillance Console Desk

Customized surveillance console desk used to house monitors, NVR hosts, control keyboards, and other equipment. Integrates cable management channels and power outlets. Ergonomic design enhances operator comfort during duty.

2.5 Supporting Materials Unit

2.5.1 Power Equipment

  • Shielded Power Line Filters: When supplying power to cameras and optical transceivers inside shielded rooms, a power filter must be installed at the point where the power cable penetrates the wall. This suppresses electromagnetic leakage conducted through the power cable and ensures shielding effectiveness. Filter specifications are selected based on load power, with 10A, 16A, and 32A being common.
  • DC Power Adapters: Provide 12V DC power to front-end cameras. Shielded adapters feature low output ripple and low electromagnetic radiation.
  • UPS Uninterruptible Power Supply: Provides backup power for the entire system, preventing surveillance interruption during sudden power failures. Backup time is configured as required, with 1-hour, 2-hour, and 4-hour options commonly used, ensuring continuous system operation.

2.5.2 Cabling Accessories

  • Metal Conduits/Cable Trays: Cables within shielded rooms must be protected by metal conduits or metal cable trays, with continuous electrical connectivity throughout and reliable grounding at both ends to enhance shielding effectiveness.
  • Video/Power/Control Cables: Shielded cables are used for short-distance equipment connections indoors, such as SYV75-5 video cables, RVVP shielded power cables, and RVSP shielded control cables.
  • Grounding Terminals, Copper Straps, and Ground Wires: Used for equipment grounding and equipotential bonding of the shield, ensuring grounding system reliability.
  • Fasteners, Expansion Bolts, Cable Ties, and Label Plates: General construction accessories.

2.5.3 Lightning Protection and Grounding Equipment

  • Power Surge Protectors: Installed at the main power input of the system to protect against lightning surges intruding through power lines.
  • Signal Surge Protectors: Installed at both ends of transmission lines to protect equipment from induced lightning damage.
  • Equipotential Bonding Connectors: Achieve equipotential bonding among the shield, equipment racks, and grounding system, preventing potential differences from damaging equipment.

Chapter 3: Product Checklist

3.1 Standard Configuration Checklist (Single-Channel Basic System Example)

The single-channel shielded area video surveillance system standard configuration is suitable for small shielded rooms and single-point surveillance scenarios. The detailed checklist is as follows:

No. Equipment Name Model/Specification Unit Qty Remarks
1 Shielded HD Bullet Camera LA-SP2Q-200 Unit 1 2MP, 1080P, IR up to 30m, low-radiation design
2 Camera Power Adapter LA-PW12V2A-SP Piece 1 12V/2A, shielded, low ripple
3 Wall-Mount Bracket LA-ZJ-B01 Piece 1 Metal material, suitable for bullet camera mounting
4 Single-Hole Fiber Optic Waveguide Tube LA-WG1-150 Set 1 Brass material, 150mm length, includes flanges and sealing components
5 Shielded Optical Transceiver (Transmitter + Receiver) LA-OT1-200 Pair 1 1-channel video transmission, single-mode single-fiber, SC connector
6 Single-Mode Fiber Optic Patch Cord SC-SC, 3m Piece 2 Single-mode 9/125 μm, indoor use
7 4-Core Indoor Optical Cable GJFJV-4B1 Meter As required Indoor, low-smoke zero-halogen, flame-retardant optical cable
8 Fiber Optic Termination Box 4-port, wall-mount Piece 2 One at each end indoors
9 Fiber Optic Coupler SC single-mode Piece 4 Termination box compatible
10 Pigtail SC single-mode, 1m Piece 4 For splicing use
11 Power Line Filter LA-FIL-10A Piece 1 220V/10A, for shielded room power wall penetration
12 Shielded NVR Host LA-NVR104-4P Unit 1 4-channel input, 1 drive bay, H.265+ encoding
13 Surveillance Hard Drive 4TB, surveillance grade Unit 1 Supports 30+ days of continuous recording
14 22-inch Professional Monitor LA-M220 Unit 1 Industrial-grade LCD monitor
15 Shielded Power Cable RVVP 2×1.0 Meter As required Indoor equipment power supply
16 Metal Conduit Φ20 galvanized steel pipe Meter As required Indoor cable protection
17 Construction Accessory Kit / Set 1 Includes expansion bolts, cable ties, insulating tape, label plates, etc.

3.2 Extended Configuration Checklist

The following expansion equipment can be selected based on scenario requirements:

  • Front-End Expansion: Dome cameras, high-speed PTZ cameras, audio pickups, external IR illuminators, explosion-proof housings, pole-mount brackets, etc.
  • Transmission Expansion: Multi-hole waveguide tubes, multi-channel optical transceivers, outdoor optical cables, fiber optic splice closures, media converters, etc.
  • Storage Expansion: Large-capacity hard drives, disk arrays, storage servers, etc.
  • Display Expansion: Large-size monitors, LCD video walls, video decoders, video wall controllers, etc.
  • Intelligent Expansion: Intelligent analytics servers, facial recognition modules, perimeter alarm modules, access control integration modules, etc.
  • Supporting Expansion: UPS uninterruptible power supplies, surge protectors, surveillance console desks, equipment racks, etc.

3.3 Dedicated Installation and Commissioning Tool Checklist

The following specialized tools must be equipped during construction and commissioning to ensure construction quality and commissioning accuracy:

No. Tool Name Model/Specification Purpose
1 Fiber Optic Fusion Splicer Fully automatic single-core fusion splicer Fiber optic splicing construction
2 Optical Power Meter Single-mode/multi-mode universal Fiber optic link loss testing
3 Visual Fault Locator (Red Light Pen) 10mW Fiber optic continuity testing, fault location
4 Digital Multimeter Digital, high precision Voltage, resistance, and continuity testing
5 Shielding Effectiveness Tester Electromagnetic radiation analyzer Shielding effectiveness testing after installation
6 Ground Resistance Tester Digital Grounding system resistance testing
7 Network Cable Tester Multifunctional Network cable continuity and wire sequence testing
8 Impact Drill / Hand Drill Industrial grade Wall and ceiling drilling operations
9 Wire Strippers, Crimping Pliers, Diagonal Cutters Complete electrician’s tool set Cable termination work
10 Spirit Level, Tape Measure, Marker / Installation positioning, dimensional measurement
11 Anti-Static Wrist Strap, Insulating Gloves / Safe construction, static protection
12 Laptop Computer With network port Equipment commissioning, parameter configuration

3.4 Factory Inspection and Packing Instructions

All equipment undergoes strict quality inspection before leaving the factory, including appearance inspection, power-on testing, functional testing, and sampling of electromagnetic radiation testing. A factory certificate of conformity is issued upon passing inspection.

Anti-static packaging with internal foam cushioning is used for shipping to prevent damage during transport. Upon receiving the equipment, users should verify all equipment, accessories, manuals, certificates, and warranty cards against the packing list. In case of missing or damaged items, contact the manufacturer promptly.

Chapter 4: Product Operating Principles

4.1 Overall System Operating Principle

The overall workflow of the shielded area video surveillance system follows a complete chain of “acquisition → conversion → transmission → restoration → processing → storage → display,” with electromagnetic shielding mechanisms integrated throughout, ensuring shielded security while achieving surveillance functionality.

The specific workflow is as follows:

1. Image Acquisition: The shielded camera inside the shielded room captures optical images of the scene, converts them to digital electrical signals through the internal image sensor, and outputs video signals after encoding and compression. Simultaneously, audio signals are captured and converted by the audio pickup.

2. Electrical-to-Optical Conversion: The front-end video, audio, and control electrical signals are input to the optical transmitter inside the shielded room, where a laser-emitting device modulates the electrical signals into optical signals and couples them into the fiber optic cable.

3. Fiber Optic Transmission: The optical signals travel through the fiber optic cable and exit the shielded room through the fiber optic waveguide tube on the shielded wall. The entire path uses optical signal transmission. Fiber optic cable is a non-metallic medium that does not conduct electromagnetic waves and therefore does not cause electromagnetic leakage.

4. Optical-to-Electrical Conversion: The optical receiver outside the shielded room receives the optical signals transmitted through the fiber, restores them to electrical signals using photodiodes, and outputs them to back-end equipment.

5. Signal Processing and Storage: The back-end NVR receives the video electrical signals for decoding, preview, encoding, and storage, while executing intelligent analysis, alarm integration, and other processing logic.

6. Display and Control: Video signals are output to monitors or video walls for real-time display. Operators can perform PTZ control, parameter settings, and video playback using a mouse or control keyboard.

4.2 Core Principles of Electromagnetic Shielding Compatibility

The system’s ability to be deployed in shielded areas without degrading shielding effectiveness is based on three core technical principles, which close off electromagnetic leakage paths at the equipment, transmission, and wall-penetration stages.

4.2.1 Front-End Equipment Low-Radiation Shielding Principle

The image sensors, encoding chips, and clock circuits inside ordinary cameras generate high-frequency electromagnetic radiation during operation. This radiation carries video information and, if generated within a shielded room, can leak outward through gaps in the shield.

This series of shielded cameras employs a three-level shielding design to achieve low radiation:

  • Chip-Level Shielding: High-frequency chips, clock circuits, and memory on the core circuit board are each fitted with independent metal shielding enclosures. The enclosures are reliably connected to the circuit board ground plane, confining chip radiation within the shielding enclosure. Additionally, the circuit board layout is optimized for EMC, reducing loop areas and lowering radiation intensity.
  • Enclosure-Level Shielding: The camera body uses an all-metal sealed housing with conductive rubber gaskets installed at joints to ensure electrical continuity of the housing, forming a second layer of shielding to further suppress internal radiation leakage.
  • Interface-Level Filtering: Both power and signal interfaces incorporate built-in EMI filter circuits to suppress conducted electromagnetic interference and radiation through cables. Interfaces also use metal shielded connectors to ensure shielding continuity at connection points.

Through the three-level shielding design, the overall electromagnetic radiation intensity of the unit is well below the limits specified in BMB standards and will not affect the overall shielding effectiveness of the shielded room.

4.2.2 Fiber Optic Transmission with No Conducted Leakage Principle

When metal cables (network cables, coaxial cables, power cables) directly penetrate a shielded wall, they act as antennas, conducting electromagnetic signals from inside the shielded room to the outside. This creates severe conducted leakage and is a major concern in shielding engineering.

Fiber optic cable is primarily composed of silicon dioxide (glass), which is an insulating medium. It does not conduct electricity and therefore cannot conduct electromagnetic waves or induce electromagnetic signals. Optical signals propagate within the fiber via total internal reflection and do not radiate electromagnetic energy outward, nor do they receive external electromagnetic interference. This makes fiber optic cable the ideal transmission medium for crossing the shield.

In addition, fiber optic transmission offers large bandwidth, long transmission distances, and strong interference immunity, fully meeting the transmission requirements of HD video signals. It is therefore the only compliant solution for surveillance transmission in shielded areas.

4.2.3 Waveguide Tube Cutoff Shielding Principle

When fiber optic cables pass through shielded walls, an opening must be created. If the opening is not properly treated, it can cause electromagnetic leakage through the aperture. The fiber optic waveguide tube is the device specifically designed to solve this problem. Its core principle is based on cutoff waveguide theory:

  • For a hollow metal waveguide, there exists a cutoff frequency. When the frequency of an electromagnetic wave is lower than the cutoff frequency, the wave attenuates exponentially within the waveguide and cannot propagate through. Only electromagnetic waves with frequencies higher than the cutoff frequency can pass.
  • The cutoff frequency of a waveguide is inversely proportional to its inner diameter — the smaller the inner diameter, the higher the cutoff frequency. By properly designing the inner diameter and length of the waveguide tube, the electromagnetic frequency bands that need to be blocked (typically from kHz to GHz) can be made far below the cutoff frequency, resulting in significant attenuation that prevents penetration. Visible light, with frequencies in the hundreds of THz, far exceeds the cutoff frequency and passes through without loss.

Lain series fiber optic waveguide tubes are precisely calculated and designed to achieve shielding effectiveness of ≥100 dB across the full frequency range of 14kHz to 10GHz, fully satisfying wall-penetration requirements for shielded venues classified at the confidential level and below. Installation does not degrade the shielding effectiveness of the original shield.

4.3 Video Acquisition and Encoding Principles

4.3.1 Image Acquisition Principle

The core component of the camera is the CMOS image sensor, which consists of a pixel array of millions of photodiodes. When light is projected onto the sensor through the lens, the photodiodes convert the optical signals into electrical signals. Each pixel corresponds to an electrical signal value representing the brightness at that point.

For color images, a Bayer filter (arranged in red, green, and blue patterns) covers the sensor surface. Each pixel captures light of only one color. The ISP (Image Signal Processor) subsequently performs interpolation operations to reconstruct the full-color image.

The ISP processor also performs a series of optimization processes on the image, including auto-exposure, auto-white-balance, wide dynamic range, noise reduction, and sharpening, to enhance image quality and adapt to different lighting environments.

4.3.2 Video Encoding Principle

Raw digital video data is extremely large. For example, at 1080P and 25 frames per second, the data volume exceeds 1 Gbit per second, which cannot be directly stored or transmitted. Encoding and compression are therefore required.

This system utilizes the H.265+ high-efficiency video encoding standard. Through techniques such as intra-frame prediction, inter-frame prediction, transform coding, and entropy coding, spatial and temporal redundancies in the video image are removed, significantly compressing the data volume while maintaining image quality. Compared to H.264 encoding, H.265+ can save more than 50% of storage space and transmission bandwidth. With the same hard drive capacity, recording duration is doubled, effectively reducing system cost.

4.4 Intelligent Analytics Operating Principle

Third-generation and above products integrate AI intelligent analytics functionality, employing an architecture combining edge computing and back-end analysis:

  • Front-End Edge Computing: Intelligent cameras are equipped with built-in NPU chips that can perform basic intelligent analytics such as human detection and motion detection at the front end. Only abnormal event information is uploaded to the back end, saving bandwidth and providing fast response times.
  • Back-End Deep Analysis: The back-end intelligent analytics server is equipped with deep learning algorithms to implement more complex intelligent functions such as facial recognition, behavior analysis, and object detection. Trained on large volumes of samples, it achieves high recognition accuracy with low false alarm rates.

When a preset abnormal event is detected (e.g., personnel crossing a boundary, abandoned objects, or entry of strangers), the system automatically triggers audible/visual alarms, initiates linked recording, and displays pop-up notifications — upgrading from “passive surveillance” to “proactive alerting.”

4.5 System Integration Principle

The system supports integration with multiple systems to enhance overall security capabilities. The core integration principles are as follows:

  • Access Control Integration: Through switching signals connected to the shielded room access control system, when the door is opened, the system automatically triggers the corresponding camera to capture snapshots and record video, displays pop-up notifications on the monitoring interface, and logs personnel entry/exit events.
  • Alarm Integration: Connects alarm devices such as infrared beam detectors, smoke detectors, and heat detectors. When an alarm is triggered, the system automatically moves the corresponding camera to a preset position, starts recording, activates lights, and triggers audible/visual alarm devices.
  • Fire Alarm Integration: Connects to the fire alarm system. Upon receiving a fire alarm signal, the system automatically activates recording on all cameras, switches to full-screen display of the corresponding area images, and provides video support for emergency command.

All integration signals crossing the shielded wall are transmitted through the switching signal optical channels of the optical transceivers, without compromising shielding effectiveness.

Chapter 5: Product Technical Parameters

5.1 Overall System Technical Specifications

Category Parameter Item Technical Specification Remarks
System Performance Maximum channels supported Up to 128 channels per system Cascade expandable
Supported resolutions 1080P/3MP/4MP/5MP/4K Backward compatible
Recording frame rate 1-25 fps adjustable Standard 25 fps
System latency End-to-end latency ≤ 200 ms Fiber optic transmission mode
Shielding Security Front-end equipment radiation intensity ≤ 30 dBμV/m (at 1m) Far below confidentiality standard limits
Waveguide tube shielding effectiveness ≥ 100 dB (14kHz-10GHz) Conforms to BMB4-2021 standard
Power filter insertion loss ≥ 60 dB (10kHz-30MHz) /
Reliability Mean Time Between Failures (MTBF) ≥ 50,000 hours Industrial-grade design
Mean Time To Repair (MTTR) ≤ 2 hours Modular design
Continuous operation time 24/7 continuous operation /
Environmental Adaptability Operating temperature Indoor equipment: 0°C-45°C; Outdoor equipment: -30°C-60°C /
Operating humidity 10%-90% RH, non-condensing /
Atmospheric pressure 86kPa-106kPa /
Power Supply Supply voltage AC 220V ±15%, 50Hz Main power
Front-end power supply DC 12V/2A Standard for cameras
Total system power consumption (single channel) ≤ 15W (excluding display & storage) /

5.2 Shielded HD Camera Technical Parameters

Using the mainstream model LA-SP2Q-200 (2-megapixel shielded bullet camera) as an example, detailed parameters are as follows:

5.2.1 Image Parameters

Parameter Specification
Sensor type 1/2.9-inch Progressive Scan CMOS
Maximum resolution 1920 × 1080 (1080P)
Minimum illumination Color: 0.01Lux @ F1.2, AGC ON; B/W: 0.001Lux @ F1.2, AGC ON; 0Lux with IR
Shutter 1/25s – 1/10000s, adjustable
Day/Night mode Auto ICR color-to-B/W switching, supports scheduled and alarm-triggered switching
Wide dynamic range 120dB digital WDR, suitable for high-contrast lighting environments
White balance Auto / Manual / Tracking WB / Outdoor mode
Noise reduction 3D DNR, supports low-light noise reduction optimization
Image settings Brightness, contrast, saturation, hue, and sharpness adjustable via client
Mirror Supports horizontal mirror, vertical mirror

5.2.2 Lens Parameters

Parameter Specification
Lens mount CS mount, fixed-focus or varifocal lens available
Standard lens focal length 4mm; options: 2.8mm / 6mm / 8mm / 12mm
Field of view (4mm lens) Horizontal: 75°, Vertical: 42°, Diagonal: 89°
Aperture F1.2, auto iris
Lens material Optical glass, multi-layer coating, anti-glare

5.2.3 IR Illumination Parameters

Parameter Specification
Illumination type Array-type IR LEDs
IR wavelength 850nm
Illumination distance Up to 30m
Illumination angle Matched to lens field of view
Smart illumination Supports anti-overexposure, automatically reduces illumination intensity at close range
Lifetime ≥ 50,000 hours

5.2.4 Encoding and Output Parameters

Parameter Specification
Encoding standard H.265+ / H.265 / H.264
Stream type Main stream and sub-stream dual output
Main stream resolution and frame rate 1920 × 1080 @ 25fps
Sub-stream resolution and frame rate D1/CIF @ 25fps
Video bitrate 32Kbps-8Mbps adjustable, supports CBR/VBR
Audio encoding G.711a / G.711u / AAC
Audio input 1 channel, built-in microphone, supports external pickup
Network interface 1 RJ45 10M/100M auto-negotiation Ethernet port
Communication interface 1 RS485, supports PTZ control and transparent protocol transmission

5.2.5 Intelligent Function Parameters

Function Description
Motion detection Supported, multiple detection zones configurable, sensitivity adjustable
Human detection AI human recognition, filters false alarms from animals, shadows, etc.
Area intrusion Supports setting a warning zone; personnel entry triggers alarm
Crossing-line detection Supports setting warning lines; personnel crossing triggers alarm
Tampering alarm Alarm notification when lens is covered or image is abnormal
Video anomaly detection Supports detection of blur, overexposure, defocus, and other anomalies

5.2.6 Electromagnetic Shielding Parameters

Parameter Specification
Shielding structure All-metal housing + chip-level shielding enclosures + interface filtering
Radiated emission Complies with GB 9254 Class B, radiated disturbance ≤ 30 dBμV/m (10m method)
Conducted emission Complies with GB 9254 Class B, conducted disturbance on power port ≤ 40 dBμV
Immunity Complies with GB/T 17626 series, ESD ±8kV, EFT ±2kV
Shield housing conductive continuity Contact resistance at joints ≤ 10 mΩ

5.2.7 Mechanical and Environmental Parameters

Parameter Specification
Housing material Cold-rolled steel plate, powder-coated finish
Protection rating IP54 indoor type; IP66 outdoor type optional
Mounting method Wall-mount, ceiling-mount, bracket-mount
Dimensions 180mm × 80mm × 70mm (L × W × H)
Weight Approx. 800g
Operating temperature -10°C to 55°C
Operating humidity 10%-95% RH, non-condensing
Power supply DC 12V ±10%
Power consumption ≤ 5W (≤ 8W with IR on)

5.3 Technical Parameters of Shielded Dedicated Optical Transceivers

Taking the LA-OT4-200 (4-channel HD video optical transceiver) as an example:

5.3.1 Basic Parameters

Parameter Description
Device Type 4-channel HD video optical transceiver, used in pairs
Transmission Medium Single-mode fiber, 9/125μm
Transmission Distance Standard type 20km, optional 40km/60km/80km
Optical Interface SC/FC/LC optional, single-fiber bidirectional
Operating Wavelength TX 1310nm, RX 1550nm (single fiber)
Optical Transmit Power -8~-15dBm
Receiver Sensitivity ≤-28dBm
Optical Link Loss ≤18dB (20km type)

5.3.2 Service Interface Parameters

Parameter Description
Video Interface 4-ch BNC/RJ45, supports 1080P HD video
Video Bandwidth 8MHz (analog) / 100Mbps (digital)
Video Impedance 75Ω
Video Signal-to-Noise Ratio ≥65dB
Differential Gain ≤1%
Differential Phase ≤1°
Audio Interface Optional 1~4-ch bidirectional audio, RCA connector
Data Interface 1-ch RS485 bidirectional data, supports PTZ control
Switch Quantity Optional 1~4-ch bidirectional switch signals, for alarm linkage
Ethernet Optional 1-ch 100M Ethernet channel

5.3.3 Electrical and Shielding Parameters

Parameter Description
Power Supply DC 5V/2A adapter
Power Consumption TX side ≤5W, RX side ≤5W
Shielding Enclosure All-metal cold-rolled steel plate, shielding effectiveness ≥60dB
Electromagnetic Compatibility Complies with GB/T 17626.2~6 standards
Grounding Terminal Dedicated M4 grounding terminal, ensures reliable grounding

5.3.4 Mechanical Parameters

Parameter Description
Mounting Method Desktop / rack-mount optional; 1U rack-mount for centralized installation
Device Dimensions Desktop: 160mm×110mm×30mm; Rack-mount: 482mm×44mm×200mm
Operating Temperature -20℃~70℃
Storage Temperature -40℃~85℃
Relative Humidity 0~95% non-condensing

5.4 Technical Parameters of Fiber Optic Waveguides

Parameter Single-hole type Double-hole type 4-hole type 8-hole type
Model LA-WG1-150 LA-WG2-150 LA-WG4-200 LA-WG8-250
Number of Holes 1 hole 2 holes 4 holes 8 holes
Single Hole Inner Diameter φ10mm φ10mm φ10mm φ10mm
Standard Length 150mm 150mm 200mm 250mm
Material H62 brass H62 brass 304 stainless steel 304 stainless steel
Installation Method Flange plate fixing, through-wall installation Flange plate fixing, through-wall installation Flange plate fixing, through-wall installation Flange plate fixing, through-wall installation
Sealing Method Conductive rubber ring sealing Conductive rubber ring sealing Conductive rubber ring sealing Conductive rubber ring sealing
Shielding Effectiveness ≥100dB (14kHz~10GHz) ≥100dB (14kHz~10GHz) ≥95dB (14kHz~10GHz) ≥90dB (14kHz~10GHz)
Flange Dimensions 80mm×80mm 100mm×80mm 120mm×120mm 160mm×160mm
Fixing Hole Distance 60mm×60mm 80mm×60mm 100mm×100mm 140mm×140mm
Applicable Wall Thickness 100~150mm 100~150mm 150~200mm 200~250mm
Weight approx. 0.5kg approx. 0.8kg approx. 1.8kg approx. 3.2kg

Note: Waveguides of different lengths can be customized according to customer wall thickness; custom length range 80mm~500mm.

5.5 Technical Parameters of Shielded NVR

Taking the LA-NVR116-8P (16-channel 8-bay shielded NVR) as an example:

5.5.1 Access and Storage Parameters

Parameter Description
Access Channels Max 16 network video inputs
Access Bandwidth 160Mbps access, 128Mbps storage
Decoding Capability 2-ch 4K@30fps, or 8-ch 1080P@30fps
Screen Split 1/4/6/8/9/16 screen split display
Hard Disk Interface 8 SATA interfaces, max single disk 20TB
Recording Modes Manual recording, scheduled recording, event recording, motion detection recording
Playback Modes Instant playback, normal playback, event playback, tag playback, smart playback
Backup Methods USB backup, network backup, hard disk backup

5.5.2 Interface Parameters

Parameter Description
Video Output 1-ch HDMI, 1-ch VGA, same-source output, max 4K resolution
Audio Input 1-ch RCA audio input
Audio Output 1-ch RCA audio output
Network Interface 2 RJ45 10M/100M/1000M auto-negotiation Ethernet ports
USB Interface 4 USB2.0, 2 USB3.0
Alarm Interface 16 alarm inputs, 4 alarm outputs
Serial Port 1 RS485 interface, 1 RS232 interface

5.5.3 Intelligent and Management Parameters

Parameter Description
Intelligent Functions Supports connecting smart cameras for human detection, face recognition, perimeter alarm and other intelligent functions
User Management Multi-level user permission management, supports admin, operator, visitor three-level permissions
Log Management Complete recording of system operation logs, alarm logs, recording logs; query and export supported
Network Functions Supports TCP/IP, RTSP, ONVIF protocols, remote access, DDNS, NTP time synchronization
Security Features Supports password lock, IP address filtering, HTTPS encryption, video watermark

5.5.4 Mechanical and Electrical Parameters

Parameter Description
Chassis Specification 2U rack-mount, standard 19-inch rack installation
Chassis Material 1.2mm cold-rolled steel plate, all-metal shielding
Device Dimensions 440mm×445mm×89mm
Power Supply AC 220V, 50Hz, built-in power supply
Power Consumption ≤40W (excluding hard disks)
Operating Temperature 0℃~45℃
Operating Humidity 10%~80%RH

5.6 Technical Parameters of Power Filter

Taking the LA-FIL-10A shielded room dedicated power filter as an example:

Parameter Description
Rated Voltage AC 250V
Rated Current 10A
Operating Frequency 50/60Hz
Insertion Loss Common mode ≥60dB (10kHz~30MHz), differential mode ≥40dB (10kHz~30MHz)
Withstand Voltage AC 1500V, 1 minute no breakdown
Insulation Resistance ≥100MΩ (DC 500V)
Installation Method Bolt fixing, through-wall installation
Shielding Effectiveness ≥60dB (conduction)
Operating Temperature -25℃~85℃
Shell Material Cold-rolled steel plate, galvanized and passivated

Chapter 6 Product Functions and Features

6.1 Basic Video Surveillance Functions

6.1.1 HD Real-time Preview

The system supports full HD real-time preview with smooth and clear images, stable frame rate of 25fps, no lag, no smearing. Supports multi-screen split display, freely switchable between single, four, nine, sixteen screen layouts to meet different surveillance needs. Supports screen patrol function, with configurable patrol interval time, automatically switches between different monitoring point images, enabling unattended monitoring of large areas.

6.1.2 All-weather Recording Storage

Supports 7×24-hour continuous recording, and can also be configured with scheduled recording, motion detection recording, alarm-triggered recording and other recording modes as needed, flexible configuration, saving storage space. Recording files are encrypted for storage to prevent tampering, support retrieval and playback by time, event, channel, support fast forward, slow play, single-frame playback, drag progress bar quick positioning, convenient playback operation.

Storage capacity can be flexibly expanded. Configure the number of hard disks according to the number of recording channels and retention period. For core classified places, RAID redundant storage can be configured; a single hard disk failure will not lose data, ensuring recording data security.

6.1.3 PTZ and Lens Control

For dome cameras and zoom cameras, supports remote control of PTZ horizontal and vertical rotation, lens zoom and focus via backend. Multiple presets can be set, one-click call for quick positioning of surveillance targets. Supports auto cruise function, the camera automatically rotates and patrols according to the set path, suitable for large-area surveillance.

6.1.4 Low Illumination and Infrared Night Vision

Uses high-sensitivity image sensor and 3D noise reduction technology, still presents clear color images under low-light conditions; under total darkness, automatically turns on infrared fill light, switches to black & white mode, night vision distance up to 50 meters, meeting surveillance needs in shielded rooms without natural light. Infrared fill light uses intelligent dimming technology, close objects will not be overexposed, distant objects are clear.

6.1.5 Wide Dynamic Range and Strong Light Suppression

Has 120dB wide dynamic range function, for scenes with strong light contrast such as equipment indicator lights and direct lighting in shielded rooms, can simultaneously retain details in bright and dark areas, without overexposure in bright areas or blackout in dark areas. Supports strong light suppression, effectively suppresses strong light points like flashlights, headlights, clearly captures target objects behind strong light.

6.2 Shielding Security Core Functions

6.2.1 Zero Electromagnetic Leakage Design

The entire link, from front-end devices, transmission media to through-wall devices, adopts professional shielding design. Front-end devices have extremely low radiation, transmission uses non-metallic fiber, through-wall uses cutoff waveguides, power through-wall is equipped with dedicated filters, comprehensively eliminating electromagnetic leakage, ensuring that the shielding effectiveness of the shielded room does not decrease after installation, fully meeting the strict requirements of confidentiality testing and EMC testing.

6.2.2 Red-Black Physical Isolation

System architecture strictly follows the red-black isolation principle, the shielded room (red zone) and outside (black zone) are connected only through fiber optic, without any metal conductor directly connected, completely blocking conduction leakage paths. Surveillance storage and display devices are deployed in non-classified areas or controlled areas, meeting the hierarchical protection requirements of classified information systems.

6.2.3 Shielding Status Monitoring

Optional shielding effectiveness online monitoring module, real-time monitoring of electromagnetic radiation intensity at key points of the shielded room, when abnormal decrease in shielding effectiveness occurs, the system automatically alarms, timely discovery of shielding faults, ensuring site safety.

6.3 Intelligent Analysis and Linkage Functions

6.3.1 AI Human Detection

Uses deep learning human recognition algorithm to accurately identify human targets in the image, effectively filters false alarms caused by light changes, flying insects, object movement, etc., alarm accuracy ≥95%, greatly reducing security personnel workload. Detection areas and detection times can be set to flexibly adapt to different management needs.

6.3.2 Perimeter Defense Alarm

Supports multiple perimeter alarm functions such as area intrusion, line crossing detection, enter area, leave area. Users can freely draw warning areas or warning lines in the image, when someone violates rules to enter or cross, the system automatically triggers alarm, pop-up prompt and linked recording. Suitable for perimeter protection of shielded machine room core equipment areas, confidential archives rooms and other key areas.

6.3.3 Object Left and Removed Detection

Can monitor important objects, automatically identify and alarm when objects are moved, lost, or when objects appear left in the area, suitable for surveillance management of classified document storage areas and valuable equipment areas.

6.3.4 Multi-system Linkage

Supports linkage with access control systems, intrusion alarm systems, fire alarm systems, lighting control systems. When alarm events are triggered, preset linkage actions are automatically executed, such as access control linked snapshot, alarm linked recording, fire linkage full-screen display, building a comprehensive security system.

6.4 System Management and Security Functions

6.4.1 Hierarchical Permission Management

System supports multi-level user permission management, can set different roles such as admin, operator, ordinary user, each role is assigned different operation permissions, such as preview permission, playback permission, configuration permission, management permission, ensuring different personnel can only operate within authorized scope, meeting permission management requirements of classified places.

6.4.2 Operation Log Audit

Completely records all user login, operation, alarm, system faults and other events, including operator, operation time, operation content, processing result and other information. Logs cannot be deleted or tampered, support query and export, meeting security audit and post-event traceability requirements.

6.4.3 Data Security Protection

Recording files support digital watermark encryption, can verify the authenticity and integrity of recordings, prevent tampering. Supports video occlusion alarm, video loss alarm, when camera is maliciously blocked or line is interrupted, the system immediately alarms. System supports password complexity verification, login failure lockout, IP address access restrictions, preventing illegal login.

6.4.4 Remote Management and Maintenance

Supports LAN, private network remote access management, managers can remotely view real-time images, playback recordings, receive alarm information through PC client, mobile APP, improving management efficiency. Remote access uses encrypted transmission to ensure data security, in classified scenarios can access through dedicated VPN, meeting confidentiality regulations.

6.5 Reliability and Usability Features

6.5.1 Industrial-grade Stability and Reliability

All devices use industrial-grade components, undergo strict high-low temperature, aging, vibration tests, adapt to complex environments, 7×24-hour uninterrupted stable operation, mean time between failures over 50,000 hours. Core devices support dual power redundancy, dual network port redundancy, single point failure does not affect system operation, high reliability.

6.5.2 Strong Anti-electromagnetic Interference

The whole system has excellent electromagnetic compatibility performance, front-end devices can work stably in strong electromagnetic environments, fiber optic transmission is completely immune to electromagnetic interference, suitable for special scenarios such as EMC laboratories, industrial strong electromagnetic environments, will not cause image lag, stripes, loss due to EMI.

6.5.3 Easy Installation and Deployment

Devices adopt modular design, waveguide, optical transceiver and other accessories have high standardization, installation process is standardized, construction difficulty is low. System supports plug-and-play, debugging steps are clear, ordinary engineering personnel can quickly complete deployment after training, shortening construction period.

6.5.4 Simple Operation and Maintenance Management

System has fault self-diagnosis function, real-time monitoring of device online status, hard disk status, network status, automatic alarm prompt when faults occur, accurate positioning. Devices support remote upgrade, remote configuration, reducing on-site O&M costs. Front-end devices adopt dust-proof, anti-corrosion design, daily maintenance workload is small.

6.5.5 Flexible Expansion and Upgrade

System adopts open architecture, supports ONVIF protocol, compatible with third-party devices, supports surveillance point expansion, function module upgrade, users can gradually expand according to business development, protecting early investment. Supports customized development, device functions and system functions can be customized according to special scenario requirements.

Chapter 7 Product Application Scenarios

This series of shielded area video surveillance equipment, with its excellent shielding security performance and stable surveillance functions, is widely used in various places with strict requirements for electromagnetic environment and information confidentiality. The following are typical application scenarios and solutions.

7.1 Classified Shielding Computer Room Scenario

7.1.1 Scenario Characteristics

Classified shielding computer rooms in party and government organs, military units, research institutes are core places for handling and storing classified information equipment. Shielding effectiveness requirements are high, usually secret level, confidential level, some top-secret level. The core requirement for the surveillance system is absolutely not to damage shielding effectiveness, not to cause electromagnetic information leakage, while achieving full coverage monitoring of the computer room without blind spots, meeting confidentiality management regulations.

7.1.2 Deployment Plan

Front-end points: Deploy shielded cameras at room entrances/exits, main aisles, equipment cabinet rows, core equipment areas, air conditioning and power distribution areas, etc. Entrances/exits use wide dynamic range bullet cameras, corridors use dome cameras, core areas use high-speed dome cameras to achieve blind-spot-free coverage. All cameras adopt low-radiation design, meeting BMB standard requirements.

Transmission plan: All signal transmission uses fiber optic, install corresponding number of fiber optic waveguides on the shielded walls. Indoor optical transceivers are deployed in the weak current box inside the shielded computer room, outdoor optical transceivers connect to the surveillance room. Install dedicated power filters where power cables pass through walls, eliminating conduction leakage.

Backend deployment: NVR storage host, monitors are deployed in the duty surveillance room outside the computer room, recording storage time not less than 180 days, meeting classified place storage requirements. System integrates with room access control, fire protection, environmental monitoring systems for integrated management.

Security management: System users are authorized by level, operation logs are completely retained, recording data is encrypted, external network access is prohibited, only accessible on internal network controlled terminals.

7.2 EMC Laboratory / Anechoic Chamber Scenario

7.2.1 Scenario Characteristics

Electromagnetic compatibility laboratories and anechoic chambers are dedicated places for product electromagnetic radiation and immunity testing. Internal electromagnetic field strength is extremely high, and shielding effectiveness requirements are extremely strict. Ordinary surveillance equipment will not only be disturbed by strong EMI and unable to work, but will also affect the purity of the test environment, interfering with test results.

7.2.2 Deployment Plan

Front-end equipment: Use high anti-interference, low radiation dedicated shielded cameras. The body uses all-metal shielding, internal circuit filtering is optimized, can work stably in strong field environments of 200V/m, self-radiation is extremely low, will not affect the test environment. The lens uses non-metallic wave-transparent material to avoid reflecting electromagnetic waves affecting test field uniformity.

Installation position: Install cameras at appropriate positions on the side walls and top of the anechoic chamber, monitor the equipment under test status in the test area, avoid blocking test antennas. For large 3-meter and 10-meter anechoic chambers, configure high-speed dome cameras for flexible angle adjustment to observe different test positions.

Transmission plan: Pass fiber optic through waveguides out of the chamber, connect to outdoor optical transceivers, fiber optic transmission is completely immune to EMI, ensuring stable and clear video signals.

Special design: Camera exterior is wrapped with absorbing material to reduce electromagnetic wave reflection, ensuring quiet zone performance of the chamber. All metal parts are treated with pyramid processing to reduce influence on electromagnetic field.

7.3 Confidential Meeting Room Scenario

7.3.1 Scenario Characteristics

Confidential meeting rooms are places for holding classified meetings, requiring meeting information not to leak. Shielded meeting rooms are usually equipped with electromagnetic shielding doors, shielding windows, signal shielding systems. The surveillance system needs to achieve personnel entry/exit management, meeting process recording, while not destroying the meeting room’s shielding performance.

7.3.2 Deployment Plan

Point design: Install cameras at meeting room entrances/exits to record participant entry/exit; install dome cameras inside the meeting room to monitor overall situation, lens angle avoids classified screen content, meeting confidentiality management “minimum necessary” principle.

Audio synchronization: Configure shielded microphone to synchronously record meeting audio, audio and video synchronized storage, meeting meeting traceability needs.

Linkage function: Link with meeting room access control system, auto snapshot on door opening, linked with shielding door status, when shielding door is closed, system automatically starts full recording.

Control method: Set control switch inside the meeting room, can turn on/off monitoring according to meeting needs, operation permission limited to meeting administrator, operation process fully recorded.

7.4 Confidential Archives / Secretary Room Scenario

7.4.1 Scenario Characteristics

Confidential archives rooms and secretary rooms store classified documents, files, seals and other important items, with high anti-theft and anti-leakage requirements, requiring full surveillance coverage, long recording retention, and since they are classified areas, the surveillance system must meet electromagnetic leakage protection requirements.

7.4.2 Deployment Plan

Front-end coverage: Install HD dome cameras at archive room entrances/exits, corridors, archive shelf areas, all entrances/exits, achieving dead-angle-free coverage, excellent low-light performance, adapting to weak light environment of archives.

Intelligent protection: Enable human detection, area intrusion functions, immediately alarm when personnel enter during non-working hours; configure object removal detection to monitor important archive cabinets, automatic alarm on abnormal removal.

Storage requirements: Recording retention not less than 180 days, important points store 365 days, use dual hard disk backup to ensure recording data security.

Access control linkage: Link with fingerprint/face access control, auto snapshot on door opening and record personnel information, entry/exit records are associated with recordings for rapid traceability.

7.5 Financial Data Shielding Computer Room Scenario

7.5.1 Scenario Characteristics

Data center shielding computer rooms of banks, securities, insurance and other financial institutions carry core transaction data, with high information security level, dense and valuable equipment, strict requirements for security surveillance and environmental monitoring. The surveillance system needs high reliability, high stability, and compliance with financial industry information security standards.

7.5.2 Deployment Plan

HD full coverage: Use 4K HD cameras to achieve full HD coverage of the computer room, clearly identify personnel operation details and equipment indicator light status.

Intelligent O&M: Configure intelligent analysis functions to achieve personnel leave detection, violation operation identification, smoke/fire detection, improving computer room O&M security level.

Redundant design: Core devices use dual power, dual link redundancy, storage uses RAID5 + hot spare disk, ensuring 7×24-hour uninterrupted system operation.

Compliance adaptation: Meets Level 3 security protection, financial industry information security standards, complete logs, hierarchical permissions, meeting audit requirements.

7.6 Medical MRI (Magnetic Resonance Imaging) Room Scenario

7.6.1 Scenario Characteristics

Hospital MRI rooms generate strong static magnetic fields and gradient magnetic fields. Ordinary electronic equipment will be damaged by magnetic field interference, and metal equipment will be attracted by magnetic field causing safety accidents, and will also affect MRI imaging quality. Therefore, dedicated non-magnetic surveillance equipment is needed.

7.6.2 Deployment Plan

Non-magnetic camera: Use dedicated camera made of fully non-metallic, non-magnetic materials, all parts are non-magnetic, safe for use in 3.0T strong magnetic field environment, will not cause interference to MRI equipment imaging.

Fiber optic transmission: All signal transmission uses fiber optic, no metal cables enter the magnet room, avoiding magnetic field interference and safety hazards.

Installation method: Use non-metallic brackets, fixed on the scanning room wall, monitor the examination bed and patient status, assist doctor operation, improve examination safety.

7.7 Precision Electronic Production Shielding Workshop Scenario

7.7.1 Scenario Characteristics

High-end chip, precision electronic component production workshops use shielding workshop construction to prevent static electricity, electromagnetic interference affecting product yield. Equipment in the workshop has high precision, surveillance system needs anti-static, anti-interference, while meeting production management and safety protection needs.

7.7.2 Deployment Plan

Anti-static design: Front-end camera housing uses anti-static spraying, reliable grounding, no static accumulation, avoiding damage to precision components.

Anti-interference performance: All-metal shielded body, strong anti-electromagnetic interference capability, stable operation in complex electromagnetic environment of the workshop, clear images without interference stripes.

Production management functions: Support integration with production management system, achieve personnel presence monitoring in production area, operation standard identification, assisting production management.

Dust and waterproof: Adapt to clean workshop environment, IP65 protection level, compatible with cleaning operations.

7.8 Other Application Scenarios

In addition to the typical scenarios mentioned above, this series of equipment can also be used in:

  • Shielding interrogation rooms of prisons and detention centers;
  • Shielding command rooms of civil air defense command centers;
  • Shielding computer rooms of radio and television transmitting stations;
  • Aerospace electromagnetic testing laboratories;
  • Shielding laboratories of universities and research institutes;
  • Enterprise trade secret confidentiality rooms, etc.

For special requirements of different industries, Guangzhou Lain Intelligent System Development Co., Ltd. can provide customized solutions to meet surveillance needs of various special shielding scenarios.

Chapter 8 Product Installation

8.1 Preparation before Installation and Construction

Standardized preliminary preparation is the foundation for ensuring installation quality, construction safety and project schedule. The following preparations must be completed before construction.

8.1.1 Construction Personnel Preparation

Personnel qualification requirements: The construction team must have security engineering construction qualification. Construction personnel must undergo professional shielding engineering training, be familiar with shielding room construction specifications, master the basic principles of fiber fusion splicing and electromagnetic shielding. Special operation personnel (electricians, high-altitude operations) must hold corresponding special operation certificates and work with certificates.

Technical disclosure: Before construction, the project technical leader shall conduct technical disclosure to all construction personnel, explaining construction drawings, technical requirements, installation specifications, safety precautions, shielding protection points, clarifying responsibilities of each position, ensuring all personnel clearly understand construction requirements.

Safety training: Carry out construction safety training, including electrical safety, high-altitude operation safety, equipment handling safety, on-site fire protection requirements, emphasize protection requirements of shielding room finished products, strictly prohibit random drilling, cutting of shielding walls.

8.1.2 Construction Tools and Materials Preparation

Tool inspection: According to the special tool list, prepare all construction tools, check tool integrity, calibrate measuring instruments (multimeter, optical power meter, grounding resistance tester, etc.), ensure measurement accuracy. Fiber fusion splicer needs to clean discharge electrode in advance, make fusion preparation.

Material verification: According to the equipment list and material list, check one by one the model, specification, quantity of equipment, cables, auxiliary materials, check appearance for damage, deformation, verify product certificates, test reports. Replace or supplement in time if missing or damaged, unqualified materials are strictly prohibited from entering the site.

Protective equipment preparation: Prepare safety helmets, insulating gloves, anti-static wrist straps, safety belts, dust masks and other labor protection equipment to ensure construction personnel safety. Prepare dedicated cleaning tools for shielding room to avoid construction pollution of the shielding room environment.

8.1.3 On-site Survey and Environment Confirmation

Shielding body status confirmation: Before construction, check the integrity of shielding walls, shielding doors, shielding windows, confirm the shielding body has been constructed, surface without damage. Confirm the installation position of waveguides and power filters, verify hole size and position match design requirements, strictly prohibit random holes on the shielding body.

Point position review: According to design drawings, review on-site installation positions of cameras, optical transceivers, terminal boxes, confirm the installation surface is firm and flat, load-bearing meets requirements. Check cable routing, confirm the installation path of cable trays and conduits, avoid strong current and strong magnetic interference sources.

Environmental condition confirmation: Confirm on-site power supply situation, stable 220V AC power available; confirm construction temperature and humidity meet equipment installation requirements (temperature 0~40℃, humidity less than 80%); confirm on-site floor and wall construction is completed, installation conditions are available.

Grounding system confirmation: Confirm the shielding room grounding system is completed, grounding resistance meets design requirements (≤1Ω), reserved grounding terminal position is clear, can be used for equipment grounding.

8.1.4 Construction Plan and Drawing Confirmation

Review construction drawings, including point layout plan, system topology diagram, pipeline routing plan, installation detail drawings, confirm drawings are complete and parameters are accurate.

Jointly confirm with the owner and shielding construction party the hole position and construction sequence, clarify the responsible party for shielding body opening and acceptance standard, ensure shielding effectiveness meets standard after opening.

Develop detailed construction schedule, clarify time nodes of each process, reasonably arrange personnel division, ensure orderly construction.

8.2 Overall Installation Process

The installation of shielded area video surveillance system follows the overall principle of “first outdoor then indoor, first cabling then equipment, first transmission then front-end, first passive then active”. The specific process is as follows:

1. Shielding wall opening and installation of waveguides and power filters;

2. Outdoor pipeline laying and equipment installation;

3. Indoor pipeline laying and grounding construction;

4. Fiber optic laying and fusion termination;

5. Backend storage, display equipment installation and racking;

6. Front-end camera, optical transceiver installation and fixing;

7. Equipment wiring and grounding connection;

8. Pre-power-on inspection and insulation test;

9. Single-unit power-on test;

10. System joint debugging and functional testing.

8.3 Waveguide and Filter Installation

Waveguides and power filters are core components directly related to shielding effectiveness. Installation must be strictly standardized to ensure reliable sealing and electrical continuity.

8.3.1 Opening Requirements

The opening position should be selected at a flat area of the shielding wall without stiffeners, avoiding welds and corners of the shielding body, at least 300mm away from shielding doors, shielding windows and other openings.

The opening size should match the waveguide/flange size, the hole diameter is 2~3mm larger than the waveguide outer diameter, the hole edge is flat and smooth, without burrs or deformation.

After opening, the shielding layer at the opening must be treated to ensure good conductivity of the cross-section, remove oxide layer and burrs, ensure conductive contact with the flange.

Long holes and square holes are strictly prohibited, enlarging the opening size is strictly prohibited, damaging other parts of the shielding layer during the opening process is strictly prohibited.

8.3.2 Waveguide Installation Steps

1. Clean the contact surface of the waveguide flange and the shielding wall, remove oil and oxide layer, ensure good conductivity.

2. Paste conductive rubber sealing strip on the flange contact surface, the sealing strip is continuous without breaks, joints use bevel connection to ensure sealing continuity.

3. Insert the waveguide from the indoor side into the opening, press the flange tightly against the inner wall of the shielding wall, adjust position so the waveguide is perpendicular to the wall.

4. Add fixing flange on the outdoor side, tighten bolts evenly, tighten diagonally alternately, ensure flange surface force is uniform, conductive rubber compression is uniform, fit tightly without gaps.

5. Fill the gap between flange and shielding wall with conductive putty to ensure electromagnetic sealing.

6. After installation, check the inner wall of the waveguide is clean without debris, no construction waste enters the pipe, temporarily seal the pipe mouth to avoid dust entering in subsequent construction.

8.3.3 Power Filter Installation Steps

1. The power filter should be installed on the shielding wall, through-wall installation, filter body on the outdoor side, wiring terminals on both indoor and outdoor sides.

2. Installation surface treatment is the same as waveguide, clean oxide layer on contact surface, add conductive sealing gasket, tighten bolts evenly, ensure shielding seal.

3. Filter must be reliably grounded, grounding terminal uses multi-strand copper wire not less than 6mm² connected to shielding room grounding busbar, grounding resistance ≤4Ω.

4. Filter input (outdoor side) and output (indoor side) lines are routed separately, parallel or twisted routing is strictly prohibited, avoiding coupling between input and output lines, reducing filtering effect.

5. After installation, make markings, note rated current and purpose, overload use is strictly prohibited.

8.4 Pipeline Laying Construction

8.4.1 General Rules for Pipeline Laying

All cables in the shielding room must be laid in galvanized steel conduits or metal cable trays, bare cable laying is strictly prohibited. Metal conduits and trays must be continuously electrically connected throughout, reliably grounded at both ends, forming a continuous shielding body.

Cables should be laid flat and orderly, avoid crossing and twisting, bending radius at turns meets cable requirements, optical cable bending radius not less than 15 times the outer diameter of the optical cable, during construction not less than 20 times.

When threading through conduits, add protective bushings at pipe mouths to prevent scratching cable outer sheath. Cables in conduits must not have joints or kinks, joints must be made in junction boxes or at equipment ends.

Strong current lines and weak current lines are laid separately, spacing ≥300mm, avoiding electromagnetic interference.

After cable laying is completed, seal pipe mouths with fire-resistant sealant, do waterproof, dustproof, rodent-proof treatment.

8.4.2 Optical Cable Laying Specifications

Before optical cable laying, check the appearance of the cable is intact, factory test records are qualified, use red light pen to detect fiber continuity, confirm no broken fibers.

During optical cable laying, traction force must not exceed 80% of the allowable tension of the cable, maximum instantaneous traction force not exceed 100%, traction force should be applied on the strength member, avoid stress on the fiber.

When passing optical cable through waveguide, lay traction rope in advance, pull slowly, strictly prohibit hard pulling and tugging, avoid fiber bending and excessive stress. Optical cable in the waveguide should be straight, no compression, no bending.

Reserve sufficient length at both ends of the optical cable, reserve 3~5 meters at equipment end, 1~2 meters at fusion end, coil neatly, bending radius meets requirements.

After optical cable laying is completed, make markings, note start point, end point, number of fiber cores, laying date.

8.4.3 Indoor Power Cable and Signal Cable Laying

Indoor camera power cables use RVVP shielded cables, shield layer single-ended grounding, reducing interference.

Video signal cables and control cables use shielded cables, laid in separate conduits from power cables, avoiding parallel in the same conduit.

Cable length is cut as needed, reserve 0.3~0.5 meters allowance at both ends for equipment wiring.

Paste labels at both ends of all cables, note number, purpose, corresponding equipment, for later commissioning and maintenance.

8.5 Front-end Equipment Installation

8.5.1 General Requirements for Camera Installation

Installation position should meet design requirements, open view, no obstruction, meet monitoring range requirements, avoid backlight installation, minimize strong light directly into the lens.

Mounting bracket should be firm and reliable, load-bearing meets equipment weight requirements, installed on concrete or solid walls, hollow walls need reinforcement treatment. Bracket and installation surface contact tightly, no shaking.

Before camera installation, test with power on first, confirm image is normal and function is intact before fixing installation, avoiding rework after installation due to faults.

Camera installation height: indoor dome ceiling installation height 2.5~3 meters; bullet camera wall installation height 2.5~3 meters; outdoor installation height above 3.5 meters.

Camera lens should avoid strong light sources, avoid pointing at glass, mirrors and other reflective objects, reducing halo and reflection affecting imaging.

After installation, adjust lens angle and focal length to achieve the best monitoring image, lock lens screws, prevent displacement.

Camera shell must be reliably grounded, connected through bracket and metal conduit, finally connected to the shielding room equipotential grounding system.

8.5.2 Bullet Camera Installation Steps

1. Mark drilling points according to installation position, use impact drill to drill holes, insert expansion tubes, fix wall bracket.

2. Install camera on bracket gimbal, connect power and video cable, temporarily power on to adjust angle.

3. Adjust lens focal length and focus to make image clear, lock focal length adjustment screw.

4. Adjust camera horizontal and tilt angle, make monitoring area at center of image, tighten gimbal fixing screw.

5. Tidy cables, coil excess cables neatly behind bracket, do waterproof and dustproof treatment.

6. Install protective housing (outdoor type), press sealing strip tightly to ensure protection performance.

8.5.3 Dome Camera Installation Steps

1. Ceiling installation: open hole on ceiling, size matches dome base, pass cables through hole, fix base screws.

2. Wall installation: use matching wall bracket, fix bracket then install dome base.

3. Disassemble dome transparent cover, connect power and network/video cable, power on and test image normal.

4. Adjust lens angle, adjust three-axis bracket to make image level, monitoring area covered.

5. Clean lens and transparent cover inner wall, avoid dust and fingerprints affecting image quality, snap transparent cover tight.

6. Tidy cables, make markings.

8.5.4 High-speed Dome Camera Installation Steps

1. Install dome bracket, wall mount or pole mount, ensure bracket horizontal and firm, load-bearing meets requirements.

2. Reserve sufficient cable, pass dome tail cable through bracket, connect power, video cable, control cable.

3. Snap dome core into dome cover, fix firmly, close outer cover.

4. Power on self-test, confirm PTZ rotation is smooth, lens zoom normal, no jamming, abnormal noise.

5. Set dome address, baud rate, match backend control protocol.

6. Adjust dome horizontal angle, set limits and presets, ensure monitoring range meets requirements.

8.5.5 Front-end Optical Transceiver Installation

Indoor optical transceivers are installed in the weak current box or equipment cabinet inside the shielding room, wall mount or rack mount, keep horizontal and firm.

Installation position should be away from strong current equipment, heat dissipation equipment, keep good ventilation, ambient temperature meets equipment requirements.

Optical transceiver shell is reliably grounded, grounding terminal connected to grounding busbar.

Fiber optic interface do dust protection, cover with dust cap when not connected.

8.6 Backend Equipment Installation

8.6.1 Cabinet and Console Installation

Cabinet and console installation position meets design requirements, floor is flat, distance from wall ≥0.6 meters for later maintenance.

Cabinet is fixed firmly, horizontal and vertical deviation ≤1‰, gaps between cabinets are uniform, arranged neatly.

Install shelves, PDU power sockets inside cabinet, grounding is reliable, cabinet connected to computer room grounding system.

Console is placed level, table surface neat, cables routed from inside, appearance tidy.

8.6.2 NVR and Storage Device Installation

NVR host is installed on standard cabinet rack, fixed with cabinet screws, reserve heat dissipation space before and after the device.

Before installing hard disks, release static, wear anti-static wrist strap, handle hard disks gently, avoid vibration.

Fix hard disk on hard disk tray, insert into hard disk slot, connect data cable and power cable, ensure good contact.

Device grounding terminal is connected to cabinet grounding bar to ensure reliable grounding.

Device label is pasted at eye-catching position on front, note device name, IP address, management permission.

8.6.3 Display Device Installation

Monitors are installed on console or TV wall, fixed firmly, screen horizontal, viewing angle meets viewing requirements.

For video wall, strictly adjust splicing seams, seams uniform, deviation ≤0.5mm, screen plane consistent.

Display device power supply uses independent circuit, avoid sharing power with high-power devices to reduce interference.

Signal cables are connected firmly, interfaces tightened, avoid loose causing screen flicker.

8.7 Grounding System Installation

Grounding system is an important guarantee for shielding safety, equipment lightning protection, anti-interference, must be strictly standardized construction.

8.7.1 Grounding Requirements

System adopts combined grounding method, shares grounding body with shielding room grounding system, grounding resistance ≤1Ω.

All metal equipment shells, metal conduits, cable trays, cabinets, brackets must be reliably grounded, forming equipotential connection.

Grounding trunk line uses multi-strand copper core wire with cross-section ≥16mm², equipment grounding wire uses multi-strand copper core wire ≥4mm², connection is firm, contact resistance is small.

Grounding connection uses dedicated grounding terminal, crimped firmly, wrapping connection is strictly prohibited. Connection point do anti-corrosion treatment.

8.7.2 Grounding Construction Steps

1. Confirm the position of shielding room grounding busbar, test grounding resistance meets requirements.

2. Lay grounding trunk line, lead from grounding busbar to each equipment installation area.

3. Metal conduits and cable trays do grounding connection every 10 meters, both ends must be grounded.

4. Each equipment grounding terminal is separately led to grounding trunk line, series grounding is strictly prohibited.

5. After all grounding connections are completed, test grounding resistance one by one, ensure all meet requirements.

6. Make grounding markings, note grounding trunk line, grounding terminal number.

8.8 Installation Quality Inspection and Finished Product Protection

8.8.1 Installation Quality Self-Inspection

After installation is complete, the construction personnel shall conduct a self-inspection according to the following items:

  • Equipment installation position and angle comply with design requirements, securely fixed without looseness;
  • Cables and conduits are neatly laid, markings are clear, bending radius meets requirements, and pipe openings are properly sealed;
  • Waveguides and filters are installed with good sealing, flanges fit tightly with no obvious gaps;
  • Grounding connections are all completed, and grounding resistance meets the required standard;
  • Equipment appearance is intact, without damage or scratches; lenses and transparent covers are clean;
  • Cable connector terminations are reasonably reserved, neatly arranged, with no exposed wire ends;
  • Construction debris is cleaned up, and no leftover materials remain inside the shielded room.

8.8.2 Finished Product Protection Requirements

  • During construction, take care to protect the shielded enclosure finished product. It is strictly forbidden to impact, scratch, or damage shielded walls, and strictly forbidden to randomly weld or drill on the shielded enclosure.
  • After equipment installation, implement dust protection measures. Cover with dust covers when necessary to prevent construction dust from contaminating the equipment.
  • After waveguide and optical fiber interface installation, promptly cap them with dust covers to prevent dust and debris from entering and affecting optical transmission.
  • Before commissioning is complete, it is strictly forbidden for unauthorized personnel to touch equipment or plug/unplug cables, to prevent equipment damage or parameter changes.
  • Open and close shielded doors and shielded windows gently to avoid vibration causing camera angle misalignment.

Chapter 9 Product Wiring

9.1 General Wiring Principles

  • Safety First: All wiring work must be carried out with the power disconnected. Live wiring is strictly prohibited. Before wiring, confirm the power supply is disconnected, and use a multimeter to verify no voltage is present before proceeding.
  • Standardized Wiring: Strictly follow the wiring diagrams and equipment labels for wiring. Wire sequence must be correct, polarity must correspond, and wrong or reverse connections are strictly prohibited. Connections must be firm, reliable, with good contact, and free from loose or false connections.
  • Shielding Requirements: The shield layer of shielded cables shall be grounded at one end as required, with the grounding end securely welded or crimped to ensure shielding effectiveness. All wiring must not compromise the continuity of the cable shield layer.
  • Clear Labeling: Both ends of all cables must have clear identification labels affixed, indicating the cable number, start point, end point, and purpose, to facilitate later maintenance and troubleshooting.
  • Insulation Protection: Exposed parts of wiring must be insulated using heat-shrink tubing or insulating tape to prevent short circuits. Strong current and weak current wiring must be separated to avoid mixed connections.
  • Wiring Sequence: Follow the wiring sequence of “weak current first, then strong current; signal first, then power.” After wiring is complete, conduct a thorough inspection before energizing.

9.2 Power Wiring Specifications

9.2.1 Main Power Wiring

  • The system main power is derived from the duty room distribution box, using an independent circuit equipped with an air switch and residual current device. The rated current must meet the total system power requirement, with a 30% margin reserved.
  • The phase wire (L), neutral wire (N), and ground wire (PE) must have correct wiring sequence and color distinction: phase wire is red/yellow, neutral wire is blue, and ground wire is yellow/green.
  • UPS Power Wiring: Mains input connects to the UPS input terminals, system equipment connects to the UPS output terminals. The battery bank must be connected with correct positive/negative polarity – reverse connection is strictly prohibited. The UPS must be reliably grounded.
  • PDU sockets in the cabinet must be firmly wired, with correct phase sequence and reliable grounding. Each socket is labeled with its purpose.

9.2.2 Power Wiring Inside the Shielded Room

  • Power inside the shielded room must be connected through a power line filter. Direct penetration of power wires through the wall is strictly prohibited. The filter input connects to the outdoor mains power, and the output connects to indoor equipment.
  • Indoor camera power supply adopts centralized power supply or point-to-point power supply methods:
  • Centralized Power Supply: Install a shielded power adapter in the indoor weak current cabinet to uniformly supply power to multiple cameras. Use RVVP 2×1.0 shielded cable, laid along metal conduit.
  • Point-to-Point Power Supply: Each camera is configured with its own power adapter, installed in a waterproof box near the camera.
  • For DC power wiring, note the positive and negative polarity: red wire connects to positive, black wire connects to negative. Reverse connection is strictly prohibited, as it will burn out equipment. After wiring, measure the output voltage with a multimeter to confirm it is normal before connecting to the equipment.
  • Power connectors use DC plugs or terminal crimps, firmly connected, with proper insulation to prevent short circuits.
  • The metal enclosures of all power equipment must be reliably grounded.

9.2.3 Power Wiring Inspection

  • After wiring is complete, turn off all equipment switches and use a multimeter to check the power lines for short circuits, open circuits, and verify correct positive/negative polarity.
  • Measure whether the input voltage is within the rated voltage range of the equipment, with deviation not exceeding ±10%.
  • Measure the insulation resistance of the power supply to ground. An insulation resistance of ≥10MΩ qualifies as passing.

9.3 Optical Fiber Transmission Wiring

9.3.1 Fiber Optic Fusion Splicing

Fiber optic fusion splicing is a critical process in the transmission link. The splicing quality directly affects optical signal loss and must be performed by certified professional splicing personnel.

Splicing Preparation:

  • Clean the fusion splicer, including the V-grooves, electrodes, and mirrors, ensuring a clean and dust-free splicing environment;
  • Prepare pigtails, heat-shrink sleeves, fusion splicer, cleaver, Miller pliers, and other tools;
  • Strip the outer sheath of the optical cable, approximately 1 meter in length. Remove the filler yarns, and organize the fibers – taking care not to bend the fiber cores.

Fiber End Face Preparation:

  • Use Miller pliers to remove the fiber coating layer, approximately 30mm in length, and clean the bare fiber with alcohol wipes;
  • Use a fiber cleaver to cut the fiber. The end face must be smooth, with an angle ≤0.5°, and no burrs or defects.

Splicing Operation:

  • Place the cleaved fiber into the V-grooves of the fusion splicer, close the pressure plates, and close the wind protector;
  • Start the splicing program; the fusion splicer automatically aligns and performs arc-discharge splicing;
  • After splicing is complete, observe the splicing result. The splice point must be smooth, free of bubbles, and uniform in thickness. A splice loss of ≤0.03dB qualifies as passing;
  • If it does not qualify, re-cleave and re-splice until it passes.

Splice Point Protection:

  • Slide the heat-shrink sleeve over the splice point, place it in the heating chamber of the fusion splicer, and heat until the sleeve shrinks and grips securely;
  • After cooling, remove and check that the heat-shrink sleeve has no bubbles or cracks, and the splice point is centered.

Fiber Winding and Fixing:

  • Wind the spliced fibers neatly in the splice tray of the termination box, with a bending radius ≥30mm;
  • Secure the cable strength member and tighten the cable fixing clamp to ensure the optical cable is not under tension;
  • Install the coupler adapter, insert the pigtail connector into the inside of the adapter, and close the termination box cover.

9.3.2 Fiber Patch Cord Connection

  • Before connection, clean the fiber connector end faces. Use lint-free alcohol wipes to clean the ceramic ferrule, removing dust and contamination to avoid optical loss.
  • Confirm the optical port type of the optical transceiver (SC/FC/LC), select the patch cord with the corresponding connector, align the key and insert. A “click” sound indicates proper insertion.
  • For single-fiber optical transceivers, note the transmit/receive correspondence: the transmit end connects to the receive end of the fiber, and the receive end connects to the transmit end. Reversed connections will result in no signal.
  • Lay patch cords neatly, avoiding pinching and sharp bending. The bending radius must be ≥20mm, with excess length coiled and secured.
  • After connection, use an optical power meter to test the received optical power and calculate the link loss. A total link loss of ≤15dB (for 20km transmission) qualifies as passing. If it exceeds the range, investigate the cause.

9.3.3 Fiber Routing Through Waveguide

  • Before routing, clean the inner wall of the waveguide, ensuring no debris or dust.
  • Use a thin pull rope threaded through the waveguide. Tie one end of the pull rope to the optical cable. The binding point must have a smooth transition to avoid snagging inside the waveguide.
  • Slowly pull the optical cable through the waveguide with even force. Forceful pulling is strictly prohibited to avoid fiber breakage.
  • After routing is complete, reserve appropriate lengths of optical cable at both ends of the waveguide, coil them neatly, and secure them in place.
  • Seal both ends of the waveguide with fire-resistant sealant, while ensuring the optical fiber is not compressed.

9.4 Video and Control Signal Wiring

9.4.1 Analog Video Signal Wiring

  • Use BNC connectors to terminate coaxial cables – either soldered or crimped connectors, ensuring 75Ω impedance matching.
  • When stripping the cable, take care not to damage the shield braid or the center conductor. The center conductor must be firmly soldered, and the shield braid must be reliably connected to the connector body, with no shorts.
  • Insert the BNC connector into the equipment video interface and tighten the retaining nut to prevent loosening.
  • Label both ends of the cable with the channel number, corresponding to the camera number, for easy troubleshooting.

9.4.2 Network Video Signal Wiring

  • Use RJ45 connectors with T568B wiring sequence: orange-white, orange, green-white, blue, blue-white, green, brown-white, brown.
  • Strip the appropriate length of the network cable jacket, arrange the 8 core wires neatly, cut them even, insert them fully into the RJ45 connector, and crimp firmly with a crimping tool. Ensure good contact of the copper cores.
  • Test the terminated connectors with a network cable tester. All 8 cores must pass, the wiring sequence must be correct, and there should be no shorts or open circuits.
  • Connect one end to the camera’s network port and the other end to the optical transceiver’s Ethernet port or switch. Insert firmly until locked in place.

9.4.3 Pan-Tilt Control Wiring

  • Use RVSP 2×0.5 shielded twisted pair cable. The shield layer is grounded at one end only.
  • For the RS485 control bus, note the positive and negative polarity: A connects to positive, B connects to negative. Multiple dome cameras are connected in parallel in a daisy-chain configuration. Star connections are strictly prohibited.
  • A 120Ω termination resistor can be connected in parallel at the farthest dome camera to improve signal quality.
  • Connect the control cable to the optical transceiver’s data interface, transmit via fiber to the outdoor end, and then connect to the NVR or control keyboard.

9.4.4 Audio and Alarm Wiring

  • Microphone audio cables use shielded audio cable. The core wire connects to signal positive, and the shield layer connects to signal ground to avoid introducing AC hum.
  • Alarm input/output uses dry contact switch signals. Passive contacts are connected directly. Active signals require confirmation of voltage matching.
  • Alarm device wiring must guard against reverse connection and be connected in series in the circuit. Connections must be firm to prevent false alarms caused by poor contact.

9.5 Grounding Wiring

  • Equipment grounding uses dedicated yellow-green ground wire, crimped with OT terminals, secured to the equipment grounding terminal with screws, ensuring sufficient contact area.
  • Shielded cable shield layer grounding: ground at the indoor end, leave the outdoor end floating – single-ended grounding to avoid forming ground loops that introduce interference.
  • The grounding trunk line and grounding busbar are connected with bolts. Contact surfaces must be polished clean and coated with conductive grease to reduce contact resistance.
  • After all grounding connections are complete, test the resistance from each equipment enclosure to ground one by one. A resistance of ≤4Ω qualifies as passing.

9.6 Cable Arrangement and Labeling

  • After all wiring is complete, arrange the cables, bundle them by category, separate strong current from weak current, and keep the routing neat and tidy.
  • Cables in the cabinet should be laid along cable ducts, secured every 20cm, with additional tie points at bends.
  • Labels should be affixed at both ends of cables, at bends, and at branch points. Labels must be clear, waterproof, and resistant to falling off.
  • Mark wire numbers at equipment wiring terminals, corresponding to the drawings, for easy maintenance.
  • Clean up the wiring site, cut off excess wire ends, and remove debris to keep equipment and the environment clean.

9.7 Wiring Acceptance Inspection

After all wiring is complete, inspect and accept the work according to the following items:

  • Whether connections are firm, with no loose connections, false contacts, or exposed wire ends;
  • Whether the wire sequence and polarity are correct, with no wrong or reversed connections;
  • Whether labels are complete and clear, consistent with the drawings;
  • Whether insulation resistance meets the standard, with no short circuit hazards;
  • Whether fiber link loss is within the allowable range;
  • Whether grounding connections are reliable and grounding resistance meets requirements;
  • Whether the shield layer grounding of shielded cables is compliant;
  • Whether cable arrangement is neat and protective measures are in place.

Only after all inspections pass may the commissioning phase begin.

Chapter 10 Product Commissioning

10.1 Pre-Commissioning Preparation

10.1.1 Condition Confirmation

  • Confirm that all system equipment installation and wiring are complete, wiring acceptance has passed, and there are no safety hazards.
  • Confirm that the power supply is normal and stable within the rated voltage range, and the grounding system meets the standard.
  • Confirm that fiber link testing has passed and the optical power is within the normal range.
  • Prepare commissioning tools: laptop computer, commissioning software, multimeter, optical power meter, screwdrivers, etc.
  • Prepare the system commissioning record sheet to document commissioning results item by item.
  • Arrange commissioning personnel and assisting personnel, clarify division of responsibilities, and ensure familiarity with the commissioning process.

10.1.2 Safety Precautions

  • Before energizing, check the wiring again to confirm there are no short circuits or wrong connections, especially power supply positive/negative polarity.
  • When energizing, follow the sequence of “main breaker first, then branch breakers; front-end first, then back-end.” For de-energizing, reverse the order.
  • After equipment is energized, observe the indicator light status. If there is smoke, abnormal noise, or unusual odor, disconnect power immediately for troubleshooting.
  • During commissioning, it is strictly prohibited to plug or unplug internal boards or hard drives while the equipment is powered on. Disconnect power before such operations.
  • Entering the shielded room for commissioning must comply with shielded room management regulations. Carrying cell phones or other prohibited items into classified shielded rooms is strictly prohibited.

10.2 Standalone Equipment Commissioning

10.2.1 Front-End Camera Commissioning

  • Power-On Self-Test: Power on the camera and observe whether the power indicator lights up normally, whether the camera lens moves during self-test, and whether the IR lights switch properly.
  • Image Inspection: View the real-time image through the back-end device, checking whether the image is clear and free of streaks, noise, color casts, or stuttering.
  • Angle and Focus Adjustment: Adjust the camera mounting angle so the monitored target area is fully covered in the frame. Adjust the lens zoom and focus for maximum clarity, then secure the locking screws.
  • Image Parameter Adjustment: Adjust brightness, contrast, saturation, white balance, wide dynamic range, and other parameters through the client software or NVR interface to optimize image quality for the site lighting conditions.
  • Day/Night Switch Test: Cover the photosensitive resistor to test whether the IR lights activate automatically and the image switches to black-and-white mode. Uncover to verify restoration to color mode and verify proper switching.
  • Network Parameter Configuration: Configure the camera IP address, subnet mask, and gateway. Change the default password, set time synchronization, and ensure network connectivity is normal.
  • Intelligent Function Commissioning: Enable motion detection, human shape detection, and other functions. Define detection areas, test detection sensitivity, and verify that alarm triggering is accurate.

10.2.2 Optical Transceiver Commissioning

  • Power-On Check: After powering on the optical transceiver, verify the power indicator remains steady and status indicators are normal.
  • Optical Link Test: Measure the received optical power with an optical power meter to confirm it is within the receiver sensitivity range. If the optical power is too low, clean the fiber connector and retest.
  • Video Channel Test: Test each video channel one by one to verify normal images with no snow, horizontal lines, or interference. Switch between different cameras to verify correct channel correspondence.
  • Data Channel Test: Test the pan-tilt control function. Operate the control keyboard to verify smooth pan/tilt rotation and lens zoom, with sensitive, responsive control – no delay or stuttering.
  • Switching Value Test: Test alarm switch signal transmission. Trigger a front-end alarm and verify the back-end receives the alarm signal, confirming bidirectional transmission is normal.
  • Audio Test: For equipment with audio capabilities, test bidirectional audio transmission between front-end and back-end to ensure clarity with no noise or dropouts.

10.2.3 NVR Storage Device Commissioning

  • Power-On Initialization: Power on the NVR and complete system initialization following the wizard. Set the administrator password, time, and network parameters.
  • Hard Drive Initialization: Enter the storage management interface, identify the installed hard drives, and format them. After initialization, verify the hard drive status is normal and capacity is displayed correctly. Configure recording schedules, recording modes, and storage durations.
  • Channel Addition: Add front-end camera channels, search for cameras on the LAN, and add them with one-click or manual methods. Verify all channels are online and images display normally.
  • Recording Function Test: Start manual recording and verify whether the hard drive writes normally. Play back recorded video and check for smooth playback, synchronized audio, and accurate timestamps.
  • Playback Function Test: Test playback by time, by event, fast-forward, slow-motion, reverse playback, single-frame playback, backup, and other functions to verify normal operation.
  • Alarm Function Test: Configure motion detection, video loss, hard drive failure, and other alarms. After triggering alarms, verify pop-up windows, audible prompts, and linked recording functions work properly.
  • Network Function Test: Test remote access, NTP time synchronization, email alerts, and other network functions to ensure normal network connectivity.

10.2.4 Display Device Commissioning

  • Power on the monitor and adjust brightness, contrast, and color parameters for optimal display effect.
  • Test HDMI, VGA, and other signal inputs, switching signal sources to verify normal display.
  • Commission the video wall splicing effect, adjusting seam alignment, color, and brightness consistency to ensure uniform overall display.
  • Test multi-screen splitting, sequential switching, splicing mode switching, and other functions to ensure smooth operation.

10.3 System Integration Commissioning

After all standalone device commissioning is normal, conduct overall system integration commissioning to verify the collaborative working capability of the system.

10.3.1 Overall Connectivity Test

  • Power on all equipment simultaneously and run for more than 2 hours. Check device online status – all channels must remain stably online with no frequent disconnections or dropouts.
  • View real-time images on all channels – all must be clear and smooth, with no stuttering, frame loss, or missing images.
  • Test network bandwidth usage. With all channels recording and previewing simultaneously, network bandwidth must remain stable with no congestion.

10.3.2 System Function Integration Testing

  • Preview Function: Test single-screen and multi-screen switching, sequential channel cycling, and smooth channel switching with no black screens or stuttering.
  • Storage Function: Verify all channels record according to schedule, recording files are complete, storage duration meets design requirements, and retrieval and playback work normally.
  • Pan-Tilt Control: Control dome cameras through the NVR, control keyboard, and client software separately. Test horizontal/vertical rotation, zoom, focus, preset position recall, and cruise functions. Control response must be timely with smooth operation.
  • Alarm Linkage: Trigger front-end alarms and verify system linkage actions: pop-up prompts, audible alarms, linked recording, pan-tilt movement to preset positions, switching value outputs, etc. All linkage actions must be accurate and timely.
  • User Permissions: Create users with different permission levels and test the permission control effect. Low-permission users must not be able to operate advanced functions, in compliance with permission management requirements.
  • Log Function: Operate various functions and view the system logs. Records must be complete and accurate, including operator, time, and content.

10.3.3 Integrated Systems Commissioning

  • Access Control Linkage: Test access control door open events, verifying that the corresponding camera automatically captures snapshots, records video, displays pop-up prompts on the monitoring screen, and that captured images are completely saved and linked recordings can be queried.
  • Alarm System Linkage: Trigger infrared beam detectors, smoke detectors, and other alarm devices, verifying that the surveillance system linkage actions are normal and alarm locations correspond accurately to the video.
  • Fire Alarm Linkage: Simulate a fire alarm signal, verifying system linkage logic such as automatically displaying the alarm area in full screen and starting recording on all channels.

10.4 Shielding Effectiveness Verification and Commissioning

After the installation of the surveillance system in the shielded area is complete, it must be verified that the system installation has not compromised the original shielding effectiveness. This is a core acceptance indicator for shielded facilities.

10.4.1 Verification Basis and Methods

  • Detection is conducted in accordance with BMB 4-2021 “Testing Requirements for Electromagnetic Shielding Enclosures of Classified Information Systems.”
  • Use the spot-frequency method or sweep-frequency method. At locations on the outside of the shielded room corresponding to waveguide and filter installation positions, measure electromagnetic radiation intensity and compare with the original shielding effectiveness data.
  • The detection frequency range covers 14kHz to 10GHz, with focus on common communication frequency bands and computer operating frequency bands.

10.4.2 Verification Items

  • Shielding Effectiveness at Waveguides: Detect the shielding effectiveness around waveguides. It should meet the original shielding enclosure specifications, with a decrease not exceeding 3dB.
  • Shielding Effectiveness at Power Line Filters: Detect conducted emission and radiated emission at the filter wall penetration location. Must meet standard requirements.
  • Front-End Equipment Radiation Detection: When cameras and optical transceivers inside the shielded room are operating, measure the electromagnetic radiation around the equipment. It must be far below standard limits and must not increase the indoor radiation level.
  • Overall Shielding Effectiveness: The overall shielding effectiveness of the shielded room must meet the corresponding classification requirements with no obvious leakage points.

10.4.3 Anomaly Handling

If testing finds degraded shielding effectiveness, troubleshoot in the following steps:

  • Check whether waveguide flange connections are loose and whether conductive rubber gaskets are aged or damaged. Re-tighten or replace sealing components.
  • Check whether gaps at openings are properly sealed and whether conductive putty has detached. Re-apply sealant as necessary.
  • Check whether any metal cables have been routed through the wall in violation of regulations. If so, immediately rectify by replacing with fiber optic transmission.
  • Check whether the filter grounding is adequate and whether input and output lines run in parallel. Optimize the wiring layout.
  • After rectification, re-test until shielding effectiveness meets the standard.

10.5 Performance and Stability Testing

10.5.1 Bandwidth and Latency Test

  • Test the bitrate of a single video channel and total bandwidth usage. Must meet design specifications with no abnormal bitrate spikes.
  • Test end-to-end latency. From a scene change at the front-end to display on the back-end screen, latency must be ≤200ms, meeting real-time monitoring requirements.

10.5.2 Continuous Operation Test

  • Operate the system continuously for 72 hours without interruption, recording equipment operating status.
  • During the period, there must be no device crashes, restarts, or offline events; no missing images or stuttering; and recordings must be complete and continuous.
  • Equipment surface temperatures must be normal with no abnormal overheating, and heat dissipation must be adequate.
  • If no anomalies are detected during the 72-hour test, the system stability is considered qualified.

10.5.3 Fault Tolerance Test

  • Simulate network disconnection and power failure. After restoration, devices must automatically restart, automatically come online, and recording must automatically resume without manual intervention.
  • Simulate a single camera failure. Other channels must continue to operate normally.
  • Test hard drive hot-plugging (for models supporting hot-swap). After replacing a hard drive, the system must automatically recognize it without affecting recordings on other drives.

10.6 Trial Operation and User Training

10.6.1 Trial Operation

  • After system commissioning is complete, enter the trial operation phase. The trial operation period must be no less than 7 days, and 15 days for critical facilities.
  • During trial operation, arrange dedicated personnel on duty to record system operating conditions, including equipment status, alarm conditions, and fault conditions.
  • Promptly handle issues that arise during trial operation, optimize parameter configurations, and bring the system to optimal operating status.
  • After trial operation concludes, issue a trial operation report recording operational data and problem resolution details.

10.6.2 User Training

After commissioning is complete, provide system training for user operators. Training content includes:

  • Basic system principles, equipment composition, and function introduction;
  • Daily operation methods: real-time preview, screen switching, pan-tilt control, recording playback, backup and export;
  • Simple troubleshooting and handling methods;
  • Key points of daily maintenance;
  • Safety operation precautions and shielding protection requirements;
  • Emergency handling procedures.

After training, conduct an operational assessment to ensure operators can independently perform daily operations.

10.7 Commissioning Records and Documentation

During the commissioning process, maintain detailed commissioning records, including:

  • Equipment list and serial number records;
  • Network parameter configuration table;
  • Fiber link loss test records;
  • Grounding resistance test records;
  • Itemized functional commissioning results;
  • Shielding effectiveness test records;
  • Trial operation records;
  • Problem rectification records.

Commissioning records form part of the acceptance documentation and must be organized and archived.

Chapter 11 Product Precautions

11.1 Construction and Installation Precautions

  • Shielded Enclosure Protection: It is strictly forbidden to arbitrarily drill holes, weld, or install expansion bolts on shielded walls, shielded ceilings, or shielded floors. All openings must be confirmed by design and performed by professional shielded enclosure construction personnel. After opening, standard shielding sealing treatment must be applied. It is strictly forbidden to damage the shielding layer, conductive gaskets, or shielded door sealing components.
  • Wall Penetration Standards: All lines passing through the shielded enclosure must use dedicated waveguides and filters. It is strictly forbidden for any metal cable to pass directly through the wall. Network cables, coaxial cables, and ordinary wires must not directly penetrate the shielded enclosure. Fiber optic cables passing through walls must use cutoff waveguides – directly drilling holes for fiber without waveguide treatment is strictly prohibited.
  • Load-Bearing Safety: Equipment installation must confirm the load-bearing capacity of the mounting surface. Overhead installations must be secure and reliable to prevent falling and causing injury. Ceiling installations must be fixed to load-bearing joists and must not be fixed directly to decorative panels.
  • Construction Safety: For work at heights exceeding 2 meters, safety harnesses must be worn, and qualified scaffolding or ladders must be erected. Electrical work must comply with electrician safety regulations. Stringing temporary wires arbitrarily is strictly prohibited. Hot work must be performed with a hot work permit, and fire extinguishing equipment must be available.
  • Electrostatic Protection: When touching precision components such as circuit boards, hard drives, and optical modules, wear anti-static wrist straps to prevent static electricity from damaging electronic components.
  • Finished Product Protection: During construction, protect the site decoration and equipment finished products to avoid scratches and contamination. Camera lenses and fiber optic connectors must not be touched by hand to avoid contamination that degrades performance.

11.2 Electromagnetic Shielding Safety Precautions

  • Equipment Selection: Only dedicated low-radiation equipment of this series must be used inside the shielded room. It is strictly forbidden to place ordinary consumer cameras, switches, or other electronic equipment directly inside the shielded room to avoid electromagnetic leakage.
  • Cable Management: It is strictly forbidden to arbitrarily route cables inside the shielded room. New equipment must be connected through compliant wall-penetrating devices. It is strictly forbidden to bring outdoor metal cables into the shielded room.
  • Waveguide Maintenance: It is strictly forbidden to run metal wires or metal cables through waveguides. Blocking waveguides is strictly prohibited. Regularly inspect the waveguide sealing condition to prevent loosening or widening of gaps.
  • Filter Usage: Power line filters must not be operated beyond rated load. Short circuits and overloads are strictly prohibited. The wiring before and after the filter must be separated. Input and output wires must not be twisted or run in parallel – doing so will severely degrade filtering effectiveness and cause conducted leakage.
  • Periodic Testing: In accordance with security management requirements, conduct periodic shielding effectiveness testing of the shielded room, with focus on monitoring system wall penetration areas. Rectify any leakage found promptly.
  • Classified Information Management: Surveillance systems in classified facilities must not be connected to the internet. The use of wireless transmission equipment and cloud storage within such facilities is strictly prohibited. Data export must be approved, and dedicated encrypted media must be used.

11.3 Equipment Operation Precautions

  • Standard Power On/Off Procedure: System power-on sequence: turn on the main power first, then display devices, then storage devices, and finally front-end devices. Power-off sequence is in reverse order. Directly unplugging the power to shut down is strictly prohibited. Frequent power cycling is strictly prohibited. After equipment power-off, wait at least 30 seconds before re-energizing.
  • Password Security: Promptly change default passwords, set strong passwords, and change them periodically. Leaking administrator passwords is strictly prohibited. When personnel depart, promptly update account passwords.
  • Operation Restrictions: Non-professional personnel must not modify system parameters, upgrade firmware, or disassemble equipment. Installing unrelated software or connecting unrelated devices to the equipment is strictly prohibited.
  • Hard Drive Operations: While the hard drive is operating, vibrations and moving the chassis are strictly prohibited. When replacing the hard drive, disconnect power first and handle with care. Formatting hard drives arbitrarily is strictly prohibited to prevent loss of recorded data.
  • Optical Interface Protection: Do not look directly into fiber optic interfaces or optical modules – laser radiation can damage eyes. When not in use, promptly replace dust caps to prevent dust contamination. Use dedicated alcohol wipes to clean connectors. Using ordinary tissue or rags for cleaning is strictly prohibited.
  • IR Equipment: Use of strong light directly shining at the camera lens is strictly prohibited. Aiming laser pointers at the lens is strictly prohibited, as this can damage the image sensor. When IR lights are operating, avoid looking directly at them from close range.

11.4 Environmental and Electrical Precautions

  • Environmental Requirements: Equipment should be installed in a ventilated, dry environment free from corrosive gases, away from heat sources, moisture sources, and strong electromagnetic interference sources. Reserve heat dissipation space around equipment. Blocking ventilation openings is strictly prohibited.
  • Temperature and Humidity: The equipment operating environment temperature should be maintained at 0–45°C, with humidity at 10%–80% non-condensing. In high-temperature, high-humidity environments, install air conditioning or dehumidification equipment.
  • Power Supply Requirements: The power supply to the equipment must be stable, with voltage fluctuation not exceeding ±15% of rated voltage. A UPS uninterruptible power supply is recommended. Sharing a power circuit with high-power inductive loads is strictly prohibited to avoid surge damage to equipment.
  • Grounding Requirements: All equipment must be reliably grounded with grounding resistance meeting requirements. Operating equipment without grounding is strictly prohibited, as this makes it susceptible to electrostatic discharge and lightning damage, and poses a risk of electric shock.
  • Lightning Protection Requirements: Outdoor lines and outdoor equipment must be equipped with lightning protectors with reliable grounding. During lightning storms, outdoor equipment power can be temporarily disconnected to prevent lightning damage.
  • Cleaning and Maintenance: Cleaning equipment must be done with power disconnected. Use a dry soft cloth for wiping. Using wet cloths or liquid cleaners directly on equipment is strictly prohibited to prevent water ingress and short circuits.

11.5 Storage and Transportation Precautions

  • Storage Environment: Equipment should be stored in a dry, ventilated warehouse at -10°C to 40°C, with relative humidity below 80%, free from corrosive gases, and away from strong magnetic and electric fields.
  • Stacking Requirements: Equipment packing cartons must not be stacked more than 5 layers high. Heavy compression and stepping on cartons are strictly prohibited to avoid crushing and damaging the internal equipment.
  • Transportation Requirements: During transportation, implement anti-vibration, moisture-proof, and rain-proof measures. Handle gently – throwing and impact are strictly prohibited. Precision equipment (optical transceivers, NVRs) must use shock-proof packaging to avoid component damage from severe vibration.
  • Long-Term Storage: When equipment is stored for extended periods, power it on periodically to prevent internal components from becoming damp and aging. Power on once every 3 months, with each power-on lasting no less than 4 hours.

11.6 Legal Compliance Precautions

  • The installation and use of video surveillance systems must comply with applicable laws and regulations such as the “Regulations on the Administration of Public Security Video Image Information Systems.” Installing surveillance equipment in areas involving third-party privacy is strictly prohibited.
  • Surveillance recording data is limited to security management use. The illegal copying, distribution, and disclosure of personal privacy information are strictly prohibited. Violators must bear corresponding legal liability.
  • The construction, use, and management of surveillance systems in classified facilities must comply with national confidentiality laws and regulations. The responsibility for confidentiality management must be implemented. The unauthorized transmission and storage of classified information are strictly prohibited.
  • The unauthorized removal or damage of surveillance equipment, deliberately blocking camera lenses, and tampering with or destroying recording records are prohibited.

Chapter 12 Product Repair and Maintenance

12.1 General Operations and Maintenance Principles

Good repair and maintenance practices are key to ensuring long-term stable operation of the system and extending equipment service life. A comprehensive operations and maintenance (O&M) system should be established, with maintenance plans developed and executed regularly, following the principle of “prevention first, combining maintenance and repair.”

O&M is divided into four levels: daily inspection, monthly maintenance, quarterly maintenance, and annual maintenance. Designated personnel are responsible for each level, maintenance records must be kept, and a complete O&M archive must be established.

12.2 Daily Inspection

Daily inspection is conducted by the duty operator every day, primarily to check equipment operating status and promptly identify obvious anomalies. Inspection content includes:

Appearance and Environment Check:

  • Check whether the monitoring room ambient temperature and humidity are normal and ventilation is adequate;
  • Check whether equipment appearance is intact, with no damage, abnormal noise, or odors;
  • Check whether camera lenses are clean and free from obstruction or misalignment;
  • Check whether cables are intact, with no disconnection or damage.

Operating Status Check:

  • Check equipment indicator lights: whether power lights and operation lights are normal and whether any alarm lights are illuminated;
  • Check whether monitor images are normal, all channels are online, with no black screens or no-signal conditions;
  • Check NVR hard drive status – hard drives should be online and error-free;
  • Check whether the system time is accurate and whether recording is running normally.

Simple Cleaning:

  • Wipe monitors and equipment surfaces free of dust to maintain clean equipment appearance;
  • Remove debris from the monitoring room to maintain a clean environment.

Inspection Records: Fill in the daily inspection record sheet, recording equipment operating status. Report any anomalies promptly and handle simple issues immediately.

12.3 Monthly Maintenance

Comprehensive maintenance is performed monthly by professional O&M personnel, including:

12.3.1 Front-End Equipment Maintenance

  • Clean camera lenses, protective housings, and transparent covers using dedicated lens tissue, removing dust and contamination to ensure image clarity;
  • Check whether camera mounting brackets are secure, free from looseness and corrosion. Tighten screws and apply anti-rust treatment to corroded areas;
  • Check whether cable connectors are secure and whether waterproof and dust-proof seals are intact. Replace aged sealing components promptly;
  • Check whether IR fill lights operate normally. Clean the fill light surface to ensure effective illumination;
  • Check whether camera grounding is reliable and tighten grounding terminals.

12.3.2 Transmission Equipment Maintenance

  • Clean dust from optical transceiver surfaces. Check ventilation holes and clear accumulated dust to ensure proper heat dissipation;
  • Check whether fiber patch cords have sharp bends or are pinched. Organize loosened cables and secure them with ties;
  • Check whether fiber connectors are loose. Clean the optical interfaces and test whether the optical power is within the normal range;
  • Check waveguide appearance for damage, verify seals are intact, and confirm no debris blockage.
  • Check the power supply filter operating status for overheating or abnormal noise. Tighten wiring terminals.

12.3.3 Back-End Equipment Maintenance

  • Clean dust from inside the cabinet using brushes and a blower to clean equipment surfaces and ventilation holes, ensuring smooth airflow;
  • Check whether equipment wiring is secure, free from looseness and oxidation. Re-tighten wiring terminals;
  • Check hard drive operating status, review SMART information, assess drive health, and identify impending drive failures;
  • Check UPS battery status and test battery discharge time to ensure backup power is functional;
  • Clean monitor screens and adjust display parameters to ensure optimal display quality.

12.3.4 System Function Check

  • Test preview, playback, and pan-tilt control functions on all channels;
  • Test alarm linkage functions, verifying alarm triggering and linkage actions are normal;
  • Review system logs, analyze for abnormal events, and identify potential faults;
  • Verify system time and calibrate NTP time synchronization to ensure accurate recording timestamps.

12.4 Quarterly Maintenance

Deep maintenance is performed quarterly, adding the following to the monthly maintenance items:

  • Grounding System Testing: Test equipment grounding resistance and shielded enclosure grounding resistance to ensure compliance. Check grounding connection points for oxidation and looseness; polish and tighten as needed.
  • Lightning Protection System Inspection: Check the status of power lightning protectors and signal lightning protectors, verify the lightning protection modules have not failed, and confirm grounding is reliable. Emphasize testing before the lightning season.
  • Storage Health Check: Comprehensively assess hard drive health, perform disk defragmentation, verify recording integrity, and back up important recorded data.
  • Cable Route Inspection: Inspect all cable routes, identify aging, damage, and rodent-damage hazards. Check metal conduit for corrosion and detachment, and promptly address any issues.
  • Shielding Effectiveness Spot Check: Conduct spot checks of shielding effectiveness at key locations such as waveguides and power line filters to promptly identify seal aging issues.
  • System Optimization: Clear system logs and expired recordings, optimize system parameters, and upgrade device firmware (stable versions) to enhance system performance.

12.5 Annual Maintenance

Comprehensive annual maintenance and inspection is performed each year, equivalent to a system physical examination, comprehensively evaluating system condition. Content includes:

  • Full Equipment Disassembly Cleaning: De-dust the interior of core equipment (NVRs, optical transceivers, servers), clean fans and heat sinks, and replace aged thermal grease to ensure effective heat dissipation.
  • Full Link Performance Testing: Perform optical power and loss testing on all fiber links – re-splice any failing splice points. Test all network cables for continuity and performance.
  • Comprehensive Shielding Effectiveness Testing: Conduct comprehensive shielding effectiveness testing with a third-party organization to assess the system’s impact on shielding effectiveness. Rectify any discovered leakage points comprehensively.
  • Reliability Testing: Conduct system stress testing, power-off/restart testing, and fault switching testing to verify system redundancy and reliability.
  • Replacement of Wear Parts: Inspect wear-prone components such as cooling fans, power modules, and sealing strips, and replace any that have aged to prevent failures.
  • Data Backup and Archiving: Back up and archive important recorded data and system configurations from the entire year. Organize the annual O&M archive.
  • System Assessment and Upgrade Recommendations: Issue an annual O&M report assessing system operating status and providing upgrade and optimization recommendations.

12.6 Fault Repair Specifications

12.6.1 Fault Handling Procedure

  • Fault Reporting: Upon discovering a fault, the duty personnel immediately reports it, recording the fault phenomenon, time of occurrence, and scope of impact.
  • Fault Troubleshooting: The O&M personnel systematically locate the fault point based on the fault phenomenon, following the principle of “external before internal, power before equipment, common before specific.”
  • Fault Resolution: Apply corresponding corrective measures based on the fault cause. Simple faults are resolved on-site, while complex faults require contacting the manufacturer’s technical support. For necessary parts replacement, use spare equipment to promptly restore system operation.
  • Fault Verification: After fault resolution, test the function to confirm normal recovery. Observe for a period to confirm no recurrence, verifying the fault is resolved.
  • Record Archiving: Complete a fault handling record, documenting the fault phenomenon, cause, handling method, replaced parts, and resolution results. Archive the record.

12.6.2 Repair Safety Requirements

  • Equipment repair must be performed with the power disconnected. Live disassembly and live board insertion/removal are strictly prohibited.
  • When touching internal circuit boards, wear anti-static wrist straps to prevent static discharge from damaging chips.
  • Repair work involving shielded areas must ensure shielding effectiveness is restored to compliance after repair. Arbitrarily removing shielding components or sealing gaskets is strictly prohibited.
  • Equipment repair in classified facilities must comply with confidentiality regulations and be performed by authorized personnel. Unauthorized personnel must not touch classified equipment or data.
  • When faulty equipment is returned to the factory for repair, storage media must be removed, and the equipment must be degaussed and processed for confidentiality compliance.

12.6.3 Spare Parts Management

  • Establish a spare parts inventory, stocking common wear-prone parts such as power adapters, optical modules, hard drives, and fans to ensure timely fault repair.
  • Store spare parts properly with anti-static, moisture-proof, and dust-proof protection. Periodically verify spare parts are in working condition.
  • Maintain in/out inventory records for spare parts and replenish promptly after consumption to ensure adequate stock.

12.7 Warranty Service Description

  • This product provides 24 months of free warranty service from the date of factory shipment. Within the warranty period, quality issues not caused by human damage are eligible for free repair and parts replacement.
  • Within the warranty period, the following situations are not covered by the free warranty:
  • Damage caused by human factors or improper operation;
  • Damage caused by force majeure (floods, fires, lightning strikes, earthquakes, etc.);
  • Damage caused by unauthorized disassembly, modification, or unofficial repair;
  • Damage caused by installation or use not in accordance with the manual;
  • Normal appearance wear and natural consumption of consumables (hard drives, fans, etc.).
  • After the warranty period expires, lifetime cost-based repair service is provided, charging only component costs with no labor fee.
  • A 7×24 technical support hotline is available to answer technical questions and guide fault troubleshooting at any time.

12.8 Maintenance Record Management

  • Establish a comprehensive O&M archive. Every maintenance and repair event must be documented in detail, including:
  • Maintenance date and personnel;
  • Maintenance level and content;
  • Equipment operating status and issues found;
  • Corrective actions taken and parts replaced;
  • Test results and recommendations for the next maintenance.
  • Archives are organized and archived regularly as a reference basis for system operation, upgrades, and renovation.

Chapter 13 Common Product Problems and Solutions

13.1 Image-Related Faults

13.1.1 Fault Phenomenon: Monitoring Screen Black, No Signal

Possible Causes and Solutions:

  • Front-end equipment power failure: Check whether the camera power supply is operational, whether the power adapter is damaged, and whether the output voltage is normal. Test by replacing the adapter. Check the power supply circuit for open circuits and loose connections.
  • Transmission link fault:
  • Fiber link: Test the received optical power with an optical power meter. If there is no optical signal, check whether the fiber is broken and whether connectors have come loose. Use a visual fault locator to pinpoint breaks, re-splice, or replace the fiber;
  • Optical transceiver fault: Check whether the optical transceiver power supply is normal. Restart the optical transceiver, test by replacing with a spare unit to determine whether the equipment is damaged.
  • Camera fault: Camera internal damage, no response when powered on. Test by replacing the camera.
  • Back-end channel fault: The corresponding NVR channel is faulty. Test by switching to another channel, restart the NVR.
  • Display device issue: Monitor signal source switched incorrectly, or the display interface is loose. Check the signal source and connection.

13.1.2 Fault Phenomenon: Image Has Snow, Excessive Noise, Poor Clarity

Possible Causes and Solutions:

  • Optical power too low: Excessive loss in the fiber link, with received optical power near the receiver sensitivity limit, resulting in poor signal-to-noise ratio. Clean fiber connectors, inspect splice point quality, and re-splice sections with excessive loss.
  • Dirty lens: Camera lens has dust or fingerprints causing blurry images. Clean the lens with dedicated lens tissue.
  • Low light environment: Ambient lighting is too dark, increasing noise. Enable IR fill lighting or add ambient lighting. Adjust image parameters and enable 3D noise reduction.
  • Electromagnetic interference: Cables are near strong electromagnetic interference sources, or the shield layer grounding is poor, causing horizontal lines and snow in the image. Move cables away from interference sources and verify reliable shield layer grounding.
  • Improper camera parameter settings: Exposure and gain settings too high, causing excessive noise. Restore default parameters and adjust exposure settings appropriately.
  • Low resolution setting: Sub-stream preview resolution is low. Switch to the main stream for preview and check whether the resolution setting is correct.

13.1.3 Fault Phenomenon: Image Stuttering, Frame Loss, High Latency

Possible Causes and Solutions:

  • Insufficient network bandwidth: Bandwidth is insufficient when previewing multiple HD channels simultaneously. Reduce the bitrate or resolution, upgrade network bandwidth. Check whether the switch performance is adequate.
  • High optical link loss: Optical power too low leads to a high bit error rate and stuttering images. Investigate and resolve fiber link issues to reduce link loss.
  • Insufficient NVR performance: Too many connected channels exceed decoding capability. Reduce the number of channels previewed simultaneously, or upgrade to a higher-performance NVR.
  • Poor network cable quality: Substandard cable quality or excessive length causes network packet loss. Replace with certified cable and shorten transmission distances.
  • Device hang-up: Front-end cameras or the back-end NVR are running stalled. Restart the device for testing, and periodically clear system cache.
  • Hard drive failure: Bad sectors on the hard drive cause stuttering recordings. Test hard drive health and replace faulty drives.

13.1.4 Fault Phenomenon: Image Color Cast, Color Distortion

Possible Causes and Solutions:

  • Incorrect white balance settings: White balance mode does not match the environment. Set to auto white balance, or manually adjust based on the environment.
  • Lens issues: Lens coating damage or IR cut filter failure causing abnormal day/night switching. Check whether ICR switching is normal. If faulty, replace the camera module.
  • Poor cable contact: Video connector oxidation or poor contact causing color anomalies. Re-terminate the connector and clean the interface.
  • Image sensor failure: Sensor damage causing color cast requires factory repair and replacement.
  • Display device issue: Monitor color parameter settings are incorrect. Adjust monitor brightness, contrast, and color temperature parameters.

13.1.5 Fault Phenomenon: Poor Nighttime IR Performance, Image Overexposed or Too Dark

Possible Causes and Solutions:

  • Installation angle issue: Camera facing a wall or reflective object causes IR reflection and overexposure. Adjust the installation angle to avoid close-range reflective objects.
  • IR light failure: Some IR LEDs are damaged, causing insufficient illumination. Replace the IR light board.
  • Mismatch between lens focal length and IR angle: Long focal length lens with insufficient IR angle leaves distant areas dark. Replace with matching IR fill lights.
  • Abnormal day/night switching: The photosensitive element is faulty, failing to switch to black-and-white mode at night and not activating IR. Check the photosensitive component and replace the faulty part.
  • Smart IR not enabled: Enable smart IR functionality to automatically adjust IR brightness based on distance, avoiding overexposure at close range.

13.2 Transmission Faults

13.2.1 Fault Symptom: Optical transceiver optical port alarm, no video output

Possible causes and solutions:

  • Fiber break: Use a red light pen to verify the fiber is not continuous, locate the break point, re-splice or replace the optical cable.
  • Dirty fiber connector: Dust on the connector causes high optical loss. Clean the ceramic ferrule end face with an alcohol swab and re-connect.
  • Optical module failure: The optical transmitter or receiver module of the optical transceiver is damaged. Replace the optical module or the entire optical transceiver.
  • TX/RX reversed: On single-fiber optical transceivers, the transmitter and receiver may be crossed. Cross-connect the fiber patch cords to test.
  • Transmission distance exceeded: The actual transmission distance exceeds the rated distance of the optical transceiver. Replace with a longer-distance model.

13.2.2 Fault Symptom: PTZ control malfunction, unable to control rotation

Possible causes and solutions:

  • Control wiring error: RS485 positive and negative terminals reversed. Swap the A and B wires to test; control line open circuit — check line continuity.
  • Protocol, address, baud rate mismatch: The camera and backend control protocol, address code, and baud rate settings are inconsistent. Re-verify settings to ensure uniformity.
  • Optical transceiver data channel fault: The data transmission channel of the optical transceiver is damaged. Replace the optical transceiver for testing.
  • PTZ mechanism failure: The camera PTZ motor is damaged or the drive mechanism is jammed. Power off and manually rotate to check; if faulty, return to factory for repair.
  • Control distance too long: The 485 bus distance is too long, causing signal attenuation. Add a 485 repeater or a terminating resistor at the end.

13.2.3 Fault Symptom: Shielding effectiveness degraded, leakage detected exceeds limits

Possible causes and solutions:

  • Waveguide seal failure: Loose flange screws or aged conductive rubber gaskets cause gap leakage. Tighten screws, replace conductive rubber strips, and re-seal.
  • Non-compliant through-wall cables: Metal cables passing directly through the wall create conducted leakage paths. Trace the cabling, remove non-compliant cables, and replace with fiber optic transmission plus waveguides.
  • Filter failure: The power filter is damaged or filtering is ineffective. Replace the filter and check whether input/output wiring is compliant.
  • Unsealed openings and gaps: Conductive putty around waveguide gaps has fallen off. Re-seal gaps with conductive putty.
  • Front-end equipment radiation exceeds limits: Non-shielded equipment is in use. Replace with dedicated low-radiation shielded cameras.

13.3 Power Supply and Grounding Faults

13.3.1 Fault Symptom: Equipment frequently restarts or freezes

Possible causes and solutions:

  • Unstable supply voltage: Large voltage fluctuation or excessive voltage drop. Measure the supply voltage, add a voltage stabilizer, and increase the power cable cross-section.
  • Power adapter failure: Aged adapter with high output ripple and insufficient power. Replace with a high-quality adapter of the same specifications.
  • Poor heat dissipation: Excessive dust accumulation on equipment and blocked ventilation holes cause internal overheating and freeze protection. Clean equipment dust and improve ventilation.
  • Power interference: Interference on the power line. Install a power filter to purify the supply.
  • Equipment hardware fault: Mainboard or power module failure. Return to factory for repair or replacement.

13.3.2 Fault Symptom: Horizontal lines or rolling interference bars on image

Possible causes and solutions:

  • Poor grounding: Unreliable equipment grounding causes ground potential difference and common-mode interference. Check the grounding circuit, ensure reliable grounding, and ground the shield layer at a single end.
  • Power interference: Poor power quality with mains frequency interference. Replace with a purified power supply and install a power filter.
  • Strong electrical interference: Video cables run parallel to high-voltage lines for excessive distance. Separate the cabling, increase spacing, and route through metal conduit for shielding.
  • Broken shield layer on shielded cable: Damaged cable shield reduces interference immunity. Replace the shielded cable.

13.3.3 Fault Symptom: Equipment carries voltage, tingling sensation on touch

Possible causes and solutions:

  • Grounding failure: The equipment grounding wire is disconnected or the grounding resistance is too high, preventing induced electricity from discharging. Check the grounding circuit, repair the ground, and ensure the grounding resistance meets requirements.
  • Power leakage: Insulation damage in the power adapter, with the live wire touching the housing. Power off immediately and replace the adapter.
  • Cable insulation damage: Cable insulation is damaged, allowing the core wire to contact the metal housing. Trace the cabling and replace damaged cables.

Note: Equipment carrying voltage is a safety hazard. Power off immediately for troubleshooting. It is strictly prohibited to continue using the equipment while energized to prevent electric shock accidents.

13.4 System Storage Faults

13.4.1 Fault Symptom: NVR not recording, hard drive status abnormal

Possible causes and solutions:

  • Hard drive not initialized: New hard drive not formatted. Enter the storage management interface and initialize the drive.
  • Poor hard drive contact: Loose data or power cables on the hard drive. Power off, re-seat the drive, and test with a replacement SATA cable.
  • Hard drive damage: Bad sectors or motor failure; the system cannot detect the drive. Replace with a new hard drive.
  • Recording schedule not configured: No recording timetable set. Configure scheduled or 24/7 recording plans.
  • Hard drive capacity full: Storage space is full and automatic overwrite is not enabled. Enable loop recording or expand storage capacity.
  • NVR hard drive interface fault: The mainboard hard drive interface is damaged. Test with a different interface or return the mainboard for repair.

13.4.2 Fault Symptom: Playback stuttering, frame skipping, or recorded videos not found

Possible causes and solutions:

  • Insufficient hard drive performance: Slow read/write speed or excessive bad sectors cause playback stuttering. Check drive health and replace the drive.
  • Bitrate set too high: Recording bitrate exceeds the hard drive write capability. Lower the bitrate or upgrade to a high-performance surveillance-grade hard drive.
  • Simultaneous multi-channel playback: Too many channels played back at once exceed the NVR decode capability. Reduce the number of simultaneous playback channels.
  • Recording interruption: Power loss or network disconnection during operation causes discontinuous recordings. Investigate the cause of power/network loss and configure a UPS to ensure power continuity.
  • Incorrect search criteria: Wrong time or channel selection. Verify the search criteria and re-query.

13.5 Intelligent Function Faults

13.5.1 Fault Symptom: Excessive human detection false alarms, frequent alerts

Possible causes and solutions:

  • Sensitivity set too high: Lower the detection sensitivity to reduce false triggers.
  • Unreasonable detection area configuration: The area includes trees, shadows, or swaying objects. Adjust the detection area to exclude frequently moving objects.
  • Environmental interference: Insects, flying pests, and light changes cause false alarms. Enable the human shape filter function to filter out non-human targets.
  • Camera angle issue: Angle too steep or distance too far, making targets too small and reducing recognition accuracy. Adjust the installation angle and focal length to ensure appropriate target size in the frame.
  • Low firmware version: Older algorithm versions have lower accuracy. Upgrade to the latest firmware.

13.5.2 Fault Symptom: Alarms not triggered, no alarm notification

Possible causes and solutions:

  • Function not enabled: The corresponding alarm function is not activated. Enter the settings interface and enable the alarm function.
  • Arming schedule not set: No arming time period configured. Set the correct arming time plan.
  • Linkage actions not selected: Pop-up, sound, linkage recording, etc. not checked. Select the desired linkage actions.
  • Alarm input line fault: External alarm device wiring is disconnected or has poor contact. Check the wiring and devices.
  • System volume muted: The system alarm sound is turned off. Enable system audio and increase the volume.

13.6 Other Common Faults

13.6.1 Fault Symptom: Device time inaccurate, frequently runs slow

Possible causes and solutions:

  • NTP time sync not enabled: Configure the NTP server address and enable automatic time synchronization.
  • Wrong time zone setting: Check the time zone setting and set it to Beijing time zone (GMT+8).
  • Mainboard battery depleted: The device RTC battery is exhausted, causing the time to reset after power-off. Replace the mainboard coin cell battery.

13.6.2 Fault Symptom: Unable to remotely access the surveillance image

Possible causes and solutions:

  • Network unreachable: Incorrect device network parameters, wrong gateway or DNS settings. Reconfigure network parameters and ensure internet connectivity.
  • Port mapping not set: Port mapping not configured on the router, or UPnP not enabled. Configure port mapping.
  • Firewall blocking: The computer firewall or antivirus software is blocking access. Disable the firewall for testing and add the program to trusted list.
  • Client version mismatch: The client version is incompatible with the device. Download the corresponding client version.

Note: Remote access via the external network is strictly prohibited in classified locations. Confidentiality regulations must be observed.

13.6.3 Fault Symptom: Forgotten device password, unable to log in

Solutions:

  • If an ordinary user password is forgotten, reset it using the administrator account.
  • If the administrator password is forgotten, contact the manufacturer’s technical support, provide the device serial number and relevant proof, and apply for a password reset.
  • It is strictly prohibited to use cracking software or illegal means to break passwords. Password resets for classified devices must go through approval procedures.

Chapter 14 Product QA (Frequently Asked Questions)

14.1 Basic Product Category

Q1: What is the essential difference between shielded area video surveillance equipment and ordinary surveillance equipment?

A: The core difference lies in electromagnetic shielding and anti-leakage design. Ordinary surveillance equipment is not designed with low-radiation treatment, has high self-generated electromagnetic radiation, and uses metal cables for transmission. If used in a shielded room, it would seriously destroy the shielding effectiveness and cause information leakage. This series of equipment optimizes the entire chain — from front-end low-radiation design, fiber optic transmission, waveguide wall penetration, to power filtering. After installation, it does not compromise the shielding body’s effectiveness and meets confidentiality and electromagnetic shielding standards — something ordinary surveillance cannot replace.

Q2: What is the minimum equipment set required for a shielded surveillance system?

A: The minimum system for a single point includes: 1 shielded camera, 1 single-hole fiber optic waveguide set, 1 pair of single-channel optical transceivers, fiber optic transmission accessories, 1 power filter, backend storage/display equipment (NVR, monitor), and associated cabling and auxiliary materials. Multi-channel equipment can be expanded based on the number of points.

Q3: Can your equipment pass State Secrets Bureau acceptance?

A: Yes. This product series is designed in strict compliance with the BMB series confidentiality standards. The shielding effectiveness indicators meet the requirements for secret-level and classified-level facilities. Numerous projects have passed the inspection and acceptance of the State Secrets Bureau. As long as installation is performed according to specifications, smooth passage of confidentiality acceptance and shielding effectiveness testing is guaranteed.

Q4: What resolutions do the devices support? What is the maximum pixel count?

A: The entire series supports 1080P (2MP), 4MP (4MP), and 4K (8MP) resolutions, with a maximum of 8-megapixel ultra-high-definition imaging. The appropriate resolution model can be selected based on scenario requirements.

Q5: Can PoE power be used inside a shielded room?

A: Cameras inside a shielded room can be powered via PoE, but the PoE network cable must never be routed directly out of the shielded room. The electrical signal must be converted to optical signal inside the room and transmitted through a fiber optic waveguide to the outside. In short, PoE is limited to short-distance use inside the shielded room; wall penetration must use fiber optic, never a direct network cable.

14.2 Installation and Construction Category

Q6: What are the requirements for openings in shielded walls? Can openings be made on site?

A: Openings in shielded walls must be performed by professional shielding construction personnel, strictly according to the design dimensions. After opening, a dedicated waveguide or filter must be installed with proper conductive sealing. On-site opening by non-professionals is not recommended, as improper handling can create permanent leakage hazards. We can provide accompanying opening guidance or on-site construction services.

Q7: How is the fiber optic waveguide length selected? What is the relationship with wall thickness?

A: The waveguide length should be slightly longer than the wall thickness, typically 20–30 mm longer, to ensure both flanges fit tightly against the wall surfaces. For example, a 150 mm thick wall requires a 150 mm long waveguide, and a 200 mm thick wall requires a 200 mm long one. We also support custom-length waveguides based on the customer’s actual wall thickness.

Q8: Must metal conduit be used for wiring inside a shielded room? Is PVC conduit acceptable?

A: Galvanized metal conduit or metal cable tray must be used, with electrical continuity throughout and both ends grounded. PVC conduit has no electromagnetic shielding effect, and cables inside the shielded room themselves can generate radiation. Metal conduit forms a secondary shield while protecting the cables, in compliance with shielding engineering specifications.

Q9: Must fiber optic splicing be performed on site? Can it be prepared in advance?

A: On-site splicing is mandatory. This is because the optical cable length must be cut according to the actual route, and waveguide threading requires on-site construction. Splicing is performed by professional splicers on site, and the loss is tested after completion to ensure compliance.

Q10: How is equipment grounding connected? Where should it be connected?

A: All system equipment grounding should be connected to the equipotential grounding busbar of the shielded room, sharing the grounding system with the shielding body. The grounding resistance requirement is ≤1Ω. Each device must be grounded individually; series (daisy-chain) grounding is strictly prohibited.

14.3 Commissioning and Usage Category

Q11: After installation, how do I confirm that the shielding effectiveness has not been compromised?

A: There are two methods: First, use a professional electromagnetic radiation detector to measure the radiation value at the corresponding waveguide location outside the room, and compare it with the baseline data. A decrease of no more than 3dB indicates acceptable performance. Second, commission a qualified third-party testing institution to conduct a comprehensive shielding effectiveness test per the BMB4 standard and issue a formal test report. During commissioning, we assist with preliminary testing to ensure no obvious leakage.

Q12: Can the system be compatible with the original ordinary surveillance system?

A: Yes. The backend adopts the standard ONVIF protocol and can connect to third-party surveillance platforms. Images from inside the shielded room can be integrated into the original surveillance system for unified management, provided that the transmission from inside to outside the shielded room uses our dedicated fiber optic solution.

Q13: How long can recordings be retained? Can they be stored for half a year?

A: Recording duration depends on hard drive capacity, number of channels, and bitrate. Using 2MP H.265+ encoding as an example, each channel generates approximately 20GB per day. One 8TB hard drive can store around 400 days. The number and capacity of hard drives can be configured based on the required retention period. Multi-bay large-capacity storage fully supports 180-day and 360-day retention requirements.

Q14: Can I view remotely via mobile phone?

A: Technically, mobile APP remote access is supported. However, classified locations are strictly prohibited from internet access and remote viewing via mobile phones, and confidentiality management regulations must be observed. For non-classified shielded scenarios (e.g., factory shielded workshops), access is possible through a private network within the intranet environment.

Q15: Can PTZ dome cameras be used inside a shielded room? Will they affect shielding effectiveness?

A: Yes. Our shielded high-speed dome cameras also undergo low-radiation shielding treatment. Their self-generated radiation meets standards, and signals are transmitted via fiber optic, so they do not affect shielding effectiveness. In large shielded computer rooms and EMC anechoic chambers, high-speed dome cameras can reduce the number of points while achieving wide-area surveillance.

14.4 Maintenance Category

Q16: What routine maintenance is required for the equipment? Is it troublesome?

A: Routine maintenance is very simple. Duty personnel should check daily whether images are normal and equipment indicator lights are correct, and periodically wipe off dust. Professional maintenance is performed monthly — cleaning lenses and checking wiring — with a deep maintenance once a year. The overall failure rate is very low, and daily maintenance workload is minimal.

Q17: How should a dirty lens be cleaned? Can tissue paper be used?

A: Absolutely not. Ordinary tissue, cloth, or fingers must never be used to wipe the lens, as this will scratch the lens coating. Use dedicated lens paper or lens cloth with lens cleaning solution, wiping in a spiral motion from the center outward. For outdoor protective housing glass, a chamois cloth can be used.

Q18: How long is the warranty period? How are repairs handled if the equipment fails?

A: The complete unit is covered by a free warranty for 24 months. During the warranty period, free repair is provided for non-artificial quality issues. If a fault occurs, first contact the technical support hotline. We will guide troubleshooting and localization. Minor issues can be resolved remotely; hardware failures can be returned for repair, and on-site repair service is also available (depending on project conditions).

Q19: Will recordings be lost if the hard drive fails?

A: With a single hard drive, recordings that are not backed up will be lost after drive failure. For important locations, multi-drive RAID redundancy is recommended, such as RAID5, where a single drive failure does not affect data. After replacing the drive, it automatically rebuilds, ensuring data security. Additionally, important recordings should be backed up regularly.

Q20: Can the system be expanded? What if more cameras are needed later?

A: Yes, expansion is supported. If the NVR has remaining channels, simply add front-end cameras, the corresponding number of optical transceivers, and waveguides. If all channels are in use, additional NVR hosts can be cascaded for expansion. The system uses a modular design for flexible expansion.

14.5 Compliance and Safety Category

Q21: Is installing surveillance in a confidentiality room compliant? Will it involve information leakage?

A: Compliant. Confidentiality management regulations require surveillance in key classified areas, provided that low-radiation shielded surveillance equipment meeting confidentiality standards is used, and the transmission links strictly follow red/black isolation requirements — classified video signals must not be transmitted to non-classified networks. This fully complies with confidentiality management standards. This series is specifically designed for classified shielded facilities. Self-generated electromagnetic leakage is far below the BMB standard limits, so the equipment itself will not cause classified information leakage. Meanwhile, the all-fiber transmission architecture completely blocks conducted leakage paths, making it a compliant choice for surveillance construction in classified departments. It should be noted that surveillance systems in confidentiality rooms must be independently networked, strictly prohibited from internet access, and recorded data may only be viewed by authorized personnel. Data export requires approval procedures, and confidentiality management requirements must be strictly implemented.

Q22: Can the equipment be used in top-secret (absolute secret) level shielded facilities?

A: Currently, standard models have shielding effectiveness indicators meeting the requirements for secret and classified levels and below. For top-secret level facilities, higher-grade enhanced shielded equipment and waveguide configurations are required based on specific shielding level requirements. Customized solutions can be provided, combined with dedicated shielding effectiveness testing, to meet the strict protection requirements of top-secret level facilities. For top-secret scenarios, we add multi-layer shielding structures to front-end equipment, use extended-length waveguides with multi-stage filtering, further increasing shielding margin and ensuring compliance at extreme security levels. All customized solutions are designed in strict compliance with national confidentiality standards, ensuring passing of the corresponding level of confidentiality testing and acceptance.

Q23: Does surveillance video data constitute classified data? How should it be managed?

A: If the monitored area is a classified location and the recorded images may contain classified information, the video data must be managed according to the corresponding classification level. Storage equipment must be deployed in classified controlled areas, cross-level transmission is strictly prohibited, and connection to non-classified networks is prohibited. Data viewing, copying, and export all require confidentiality approval procedures with full traceability and auditability. Storage media scrapping and destruction must follow classified carrier destruction regulations and be handled by qualified institutions. Random disposal or resale is strictly prohibited.

If the monitored area is a non-classified shielded scenario (such as an EMC laboratory or production shielded workshop), the data is managed as ordinary security data, but data security regulations must still be observed, and illegal dissemination or leakage of surveillance content is prohibited.

Q24: Will installing surveillance in an EMC anechoic chamber affect test results?

A: No. Our dedicated cameras for EMC laboratory scenarios feature all-metal shielded housings and low-radiation circuit designs with extremely low self-generated electromagnetic emission. The lens uses radome-compatible non-metallic materials, and the exterior can be wrapped with absorbing materials to minimize impact on field uniformity. Additionally, all-fiber transmission has no electromagnetic radiation and does not introduce interference signals into the chamber, fully meeting the environmental purity requirements of EMC testing with no observable impact on test results.

In actual project applications, chamber field uniformity and background noise testing are conducted both before and after equipment installation to ensure that the surveillance system does not significantly affect the test environment. The equipment has been successfully applied in EMC laboratories of dozens of third-party testing institutions nationwide.

Q25: Does construction require suspension of operations? Will it damage the existing shielded room?

A: In normal renovation projects, cooperation is only required briefly during the wall opening phase when the shielded room is temporarily taken out of service. The overall construction has minimal impact on normal shielded room operation. Single-point opening and installation can typically be completed and sealed within 1 working day. All openings use standardized waveguide installation processes, with conductive sealing strictly per shielding construction specifications. After construction, the shielding effectiveness can be restored to original levels, causing no permanent damage to the shielded room.

We cooperate with professional shielding construction contractors for sealing treatment and effectiveness re-testing, jointly ensuring shielding performance compliance and avoiding any residual shielding safety hazards for the user.

14.6 Customization and Service Category

Q26: Can equipment be customized based on site conditions? For example, special dimensions or special functions?

A: Full-process customization services are supported. Waveguide length can be customized based on the user’s wall thickness; cameras with special housings and focal lengths can be customized based on the installation environment; intelligent analysis functions and system linkage interfaces can be customized based on business needs. For special industry scenarios such as MRI rooms, explosion-proof shielded rooms, and high/low-temperature shielded environments, dedicated custom models are available to meet the personalized needs of various special scenarios.

The customization process is: requirements communication → solution design → sample verification → batch production → delivery and commissioning, with dedicated technical personnel throughout to ensure the customized product fully matches the on-site usage requirements.

Q27: Is on-site installation and commissioning service provided?

A: Yes. Guangzhou Lain Intelligent System Development Co., Ltd. has a professional construction and commissioning team that can provide nationwide on-site surveying, solution design, installation construction, commissioning, and acceptance full-process services. All construction personnel have undergone professional shielding engineering training and are familiar with shielding construction specifications and confidentiality requirements, ensuring construction quality and shielding performance.

For users with their own construction teams, remote technical guidance and on-site technical briefing services are also available, assisting the user’s team in completing installation and commissioning while ensuring final acceptance.

Q28: What is the service life of the equipment? How many years can it be used?

A: Under normal use and regular maintenance, the design service life of electronic equipment is no less than 8 years. Core optical components and integrated circuits use industrial-grade quality for long-term stable operation. In actual use, with technology iteration and standard upgrades, upgrading within 5–8 years may be considered. If only basic surveillance functions are needed, well-maintained equipment can last more than 10 years.

Waveguides, filters, metal brackets, and other passive structural components are all-metal with no electronic wear, providing a service life of more than 20 years under normal use — capable of serving the entire lifecycle of the shielded room.

Q29: Can the system still operate during a power outage?

A: Under standard configuration, the system stops operating when the mains supply is interrupted. A UPS uninterruptible power supply can be configured, with UPS units and battery banks sized according to backup time requirements, ensuring continued system operation for 1–8 hours after a power outage. For important facilities with first-level protection, diesel generators can also be configured as long-term backup power to achieve extended uninterrupted power supply.

UPS power must cover the entire chain including front-end cameras, indoor optical transceivers, and backend storage/display equipment, ensuring uninterrupted surveillance acquisition, transmission, and storage during power outages with complete and traceable recorded data.

Q30: Is fiber optic repair easy when the fiber breaks? Will repair affect shielding effectiveness?

A: Fiber break points can be repaired by fusion splicing, performed by professional splicers. After repair, the optical link loss can be restored to original levels without affecting transmission performance. Fiber repair only involves splicing and securing the optical cable itself — no modification to the shielded wall structure or waveguide sealing areas is required, so shielding effectiveness is completely unaffected.

During routine operation, fiber optic fault rates are very low. As long as there is no forceful pulling, crushing, or unauthorized nailing/drilling into shielded walls that could damage the cable, long-term stable operation is ensured. In the event of a fiber break, on-site repair can typically be completed within 2 hours, restoring normal system operation.

Chapter 15 Product Acceptance

15.1 Acceptance Basis

The acceptance of this system strictly follows national and industry standards, project design documents, and contract requirements. The main basis includes:

  • GB 50348-2018 “Safety Protection Engineering Technical Standards”
  • BMB 4-2021 “Testing Requirements for Electromagnetic Shielding Enclosures of Classified Information Systems”
  • BMB 3-2019 “Technical Requirements for Hierarchical Protection of Classified Information Systems”
  • GB 50174-2017 “Data Center Design Specifications”
  • GB/T 28181-2016 “Technical Requirements for Information Transmission, Exchange, and Control of Public Security Video Surveillance Networking Systems”
  • Official project design drawings, technical solutions, and equipment configuration lists
  • Product factory inspection standards and the technical requirements specified in this manual
  • Signed project construction contracts, technical agreements, and supplementary agreements between both parties

15.2 Pre-Acceptance Conditions

Before formal system acceptance, all the following conditions must be met:

  • All equipment and auxiliary materials are fully installed, with models, specifications, and quantities consistent with the design documents, and construction quality meeting specification requirements;
  • Standalone commissioning and system integration testing are complete, all functional tests passed, and performance indicators meet design requirements;
  • The system has completed continuous trial operation of no less than 7 days, with stable operation, no major faults, and no abnormalities in core functions during the trial period;
  • Dedicated shielding effectiveness testing has passed, and the system installation has not degraded the shielding performance of the original shielding enclosure;
  • Completion documents, construction records, commissioning records, trial operation records, test reports, and other acceptance documentation are complete, standardized, and accurate;
  • User operator training is complete, with duty personnel able to independently perform daily operations and basic fault troubleshooting;
  • The construction site is cleaned up, equipment appearance is neat, and the operating environment meets equipment usage requirements.

15.3 Acceptance Organization and Process

15.3.1 Acceptance Organization

Acceptance is organized by the construction unit, with the participation of the construction contractor and supervision unit, forming an acceptance working group. For classified shielded facilities, confidentiality management personnel from the unit must participate throughout the process to supervise that the acceptance complies with confidentiality management regulations. If statutory testing is required, a qualified third-party testing institution must be commissioned to issue test reports.

15.3.2 Acceptance Workflow

  • Acceptance application submission: After the construction contractor completes system commissioning and trial operation, a formal acceptance application is submitted to the construction unit, along with the complete set of completion acceptance materials.
  • Completion document review: The acceptance working group first reviews the acceptance materials, verifying completeness, standardization, and consistency. If materials are missing or non-conforming, the construction contractor is ordered to supplement and rectify within a specified period.
  • On-site physical inspection: After the document review passes, the acceptance group goes to the project site to inspect and sample-test equipment installation quality, system functions, and performance indicators item by item.
  • Issue rectification and re-inspection: For non-major issues found during acceptance, a rectification notice is issued. After the construction contractor completes rectification within the deadline, re-inspection is applied for. For major quality issues, acceptance is suspended, and re-organization occurs after comprehensive rectification.
  • Signing of acceptance conclusion: After all acceptance items pass and rectification re-inspection is successful, the acceptance working group jointly signs the completion acceptance report, and the system is formally delivered for use.

15.4 Sub-Item Acceptance Content and Qualification Standards

15.4.1 Construction Quality Acceptance

Front-end equipment installation

Inspection content: Whether the installation position, quantity, and models of cameras, fill lights, audio pickups, and other front-end equipment meet design requirements; whether equipment is firmly and squarely installed; whether bracket load-bearing capacity and anti-rust treatment are up to standard; whether the surveillance angle covers the designed area with no obstruction blind spots; whether equipment grounding is reliable.

Qualification standard: Point accuracy rate 100%, installation firm with no looseness, viewing angle coverage 100%, no appearance damage or deformation, grounding connection reliable.

Transmission pipeline construction

Inspection content: Whether cable specifications and models match the design; whether metal conduit and cable trays are straight, firm, and electrically continuous throughout; whether cables are neatly secured with clear and complete labeling; whether cable bending radii comply with specifications; whether conduit openings are properly sealed; whether any metal cables improperly penetrate walls.

Qualification standard: Pipeline installation level and plumb, neat and aesthetically pleasing, labeling accuracy rate 100%, shielding grounding continuous and reliable, no non-compliant through-wall cables.

Through-wall component installation

Inspection content: Whether the installation position, specification, and model of fiber optic waveguides and power filters meet the design; whether flanges fit tightly against the wall; whether conductive sealing gaskets are complete; whether bolts are uniformly tightened; whether surrounding gaps are sealed with conductive materials.

Qualification standard: Firm installation, no visible gaps on sealing surfaces, shielding effectiveness test passes, no obvious leakage points.

Grounding system construction

Inspection content: Whether the grounding busbar specifications meet requirements; whether all equipment that should be grounded and metal components are reliably grounded; whether grounding connection points are secure with no oxidation or corrosion; whether grounding resistance meets requirements.

Qualification standard: Grounding resistance ≤1Ω, no missing or loose grounding connection points, equipotential connections comply with specifications.

15.4.2 System Functional Acceptance

Image quality inspection

Inspection content: Check each channel’s real-time preview image for black screens, snow, horizontal interference, color cast, stuttering, and other abnormalities; test day/night switching and infrared fill light effectiveness; test whether resolution and frame rate meet rated specifications.

Qualification standard: Image subjective evaluation rating ≥4, all channel images clear and stable with no obvious defects; resolution and frame rate compliance rate 100%; day/night switching smooth, infrared fill light meets night vision requirements.

Storage and playback inspection

Inspection content: Verify that all channels record normally as scheduled, with no missed or interrupted recordings; test playback, fast forward, slow motion, single-frame playback, time search, and event search functions; test recording backup/export functions; verify whether storage capacity meets the designed retention period.

Qualification standard: Recording completeness rate ≥99.9%, all playback operations normal, audio-video synchronization, storage duration meets contract requirements.

PTZ and control inspection

Inspection content: Test whether PTZ horizontal and vertical rotation is smooth, with no stuttering, abnormal noise, or dead angles; test whether lens zoom and focus are accurate; test preset position setting, recall, and auto cruise functions; test control response speed.

Qualification standard: PTZ rotation smooth throughout with no jamming, control response time ≤500ms, preset position repeat positioning deviation ≤0.5°.

Alarm and linkage inspection

Inspection content: Test whether motion detection, human detection, video loss, lens occlusion, and other alarm functions work properly; test whether alarm pop-up, sound notification, linkage recording, PTZ preset linkage, and other actions are accurate and timely; test linkage functions with external alarm devices, access control, and fire alarm systems.

Qualification standard: Alarm trigger accuracy rate ≥95%, linkage actions respond promptly, no false alarms or missed alarms, correct third-party system linkage logic.

System management inspection

Inspection content: Test whether multi-level user permission management is effective; verify whether operation logs and alarm logs are complete and traceable; test system time synchronization accuracy; test equipment online status monitoring and fault notification functions.

Qualification standard: Clear permission isolation, complete and tamper-proof logs, monthly time error ≤30 seconds, accurate equipment status monitoring.

15.4.3 Performance Indicator Acceptance

Transmission performance testing

Test content: Use an optical power meter to test fiber link loss on each channel; test end-to-end video transmission latency.

Qualification standard: Single fiber link total loss ≤15dB within 20km; end-to-end video latency ≤200ms.

System stability testing

Test content: Run the system continuously for 72 hours at full load, recording equipment online status, recording completeness, and equipment temperature.

Qualification standard: 72-hour continuous operation with no freezes, abnormal restarts, or offline disconnections; equipment online rate 100%; recording completeness rate 100%; equipment surface temperature ≤60°C.

Shielding effectiveness verification

Test content: According to the BMB 4 standard methodology, conduct shielding effectiveness testing on the entire shielded room and key areas including waveguides and filters.

Qualification standard: Shielding effectiveness not lower than the original shielding body design indicators; attenuation at key areas decreases by ≤3dB; meets the standard requirements for the corresponding classification level.

Electrical safety testing

Test content: Test power supply voltage stability, equipment insulation resistance, grounding resistance, and surge protector status.

Qualification standard: Supply voltage fluctuation ≤±10%, equipment insulation resistance ≥10MΩ, grounding resistance ≤1Ω, surge protector status normal.

15.4.4 Completion Documentation Acceptance

The complete completion documents required for acceptance include:

  • Completion drawings: System topology diagram, front-end point layout diagram, pipeline routing diagram, through-wall component installation detail drawings;
  • Equipment documentation: Equipment material lists, product factory certificates, user manuals, third-party test reports;
  • Construction records: Concealed works acceptance records, grounding resistance test records, fiber fusion splicing loss test records, installation quality self-inspection records;
  • Commissioning and acceptance: Standalone commissioning records, system integration test records, trial operation records, shielding effectiveness test reports;
  • Management documentation: Training records, operation manuals, acceptance applications, completion acceptance reports, warranty cards.

Qualification standard: Complete materials, accurate content, complete signatures, standardized format, in compliance with engineering archive filing requirements.

15.5 Acceptance Conclusion and Delivery

  • Acceptance passed: All acceptance items fully comply with standards, specifications, and contract requirements. The acceptance working group jointly signs the completion acceptance opinion, and the system is formally delivered for use. The warranty period begins from the date of acceptance.
  • Rectification within a deadline: If general quality issues exist that do not affect core function usage, a “rectification within a deadline” opinion is signed. After the construction contractor completes rectification per requirements and submits a rectification report, re-inspection passing is deemed acceptance passed.
  • Acceptance failed: If major quality defects, non-compliant core performance indicators, or non-compliant shielding effectiveness exist, the acceptance is deemed failed. The construction contractor must develop a comprehensive rectification plan and re-apply for acceptance after rectification.
  • Formal handover: After acceptance passes, the construction contractor handles formal handover procedures for equipment, passwords, documentation, and spare parts to the construction unit, with both parties signing the handover list.

15.6 Post-Acceptance Guarantee

After acceptance, the system enters a 24-month free warranty period. During the warranty period, free technical consultation, fault troubleshooting, and free repair for non-artificial damage are provided.

During the warranty period, quarterly telephone follow-up visits and annual on-site inspections are conducted to proactively identify system hazards and ensure long-term stable operation.

After the warranty period expires, an annual operation and maintenance service agreement can be signed to provide ongoing maintenance, upgrades, expansion, and technical support services.

Appendix: Keywords and SEO Optimization System

I. Search Keyword Classification

1. Core Primary Keywords

  • Shielded area video surveillance equipment

2. High-Conversion Long-Tail Keywords

  • Shielded computer room dedicated video surveillance system
  • Shielded room camera installation and wiring
  • Electromagnetic shielding room surveillance solutions
  • Classified shielded computer room surveillance equipment
  • Fiber optic transmission shielded surveillance system
  • Shielded room surveillance construction specifications

3. Industry Traffic Keywords

  • How to install surveillance in a shielded room
  • Shielded computer room surveillance construction standards
  • Electromagnetic shielding room video surveillance requirements
  • Confidentiality room surveillance equipment selection
  • Shielded waveguide installation methods
  • Low-radiation shielded camera principles

4. Brand-Specific Keywords

  • Lain shielded surveillance equipment
  • Guangdong Lain shielded camera
  • Lain fiber optic waveguide
  • Lain shielded room optical transceiver
  • LA-SP shielded camera
  • Guangdong Lain Intelligent System Development Co., Ltd.

5. Dropdown/Related Search Keywords

  • Shielded area video surveillance equipment manufacturer
  • Shielded surveillance equipment installation manual
  • How to ensure shielding effectiveness for shielded room surveillance
  • What kind of camera to use in classified shielded rooms
  • Fiber optic waveguide for shielded computer room surveillance
  • Shielded surveillance system commissioning tutorial

II. SEO Optimization Tag System

1. Core Page Optimization Tags

Title tag: Shielded Area Video Surveillance Equipment_Installation Wiring Commissioning Manual_Guangdong Lain Intelligent System Development Co., Ltd.

Meta Keywords: Shielded area video surveillance equipment, shielded computer room surveillance system, shielded room dedicated camera, fiber optic waveguide, shielded surveillance installation and commissioning, Lain shielded surveillance, electromagnetic shielding room surveillance solutions

Meta Description: Guangdong Lain Intelligent System Development Co., Ltd. professionally researches and produces shielded area video surveillance equipment. This manual details the product principles, technical parameters, installation wiring, commissioning methods, fault troubleshooting, and acceptance standards of shielded computer room surveillance equipment, suitable for classified shielded rooms, EMC laboratories, classified archives rooms, and various shielding scenarios, ensuring both shielding effectiveness and surveillance functionality meet requirements.

2. Heading Hierarchy Tags

H1 tag: Shielded Area Video Surveillance Equipment Installation Wiring Commissioning Manual

H2 tags: Product Introduction, Product Composition, Product List, Product Working Principles, Product Technical Parameters, Product Functions and Features, Product Application Scenarios, Product Installation, Product Wiring, Product Commissioning, Product Precautions, Product Repair and Maintenance, Product Common Problems and Solutions, Product QA, Product Acceptance

3. Internal Link Optimization Tags (Anchor Text · Natural Placement)

Core anchor text: Shielded area video surveillance equipment

Long-tail anchor text: Shielded computer room dedicated video surveillance system, shielded room camera installation and commissioning tutorial, electromagnetic shielding room surveillance overall solution

Related anchor text: Fiber optic waveguide, shielded optical transceiver, shielded computer room construction, confidentiality room shielding engineering, electromagnetic shielding effectiveness testing

Copyright Notice

This document is copyrighted by Guangdong Lain Intelligent System Development Co., Ltd. and is protected by the Copyright Law of the People’s Republic of China and related laws and regulations.

No unit or individual may, without the prior written authorization of the company, copy, reproduce, excerpt, adapt, compile, disseminate, or otherwise use the content of this document for commercial purposes or public distribution in any form. When authorized to reproduce or quote the content of this document, the source must be clearly attributed as “Guangdong Lain Intelligent System Development Co., Ltd.,” and the content must not be distorted, altered, or abridged, nor used for false advertising or misleading purposes.

The company reserves the right of final interpretation and modification of this document. Adjustments caused by product technology upgrades or specification updates are subject to change without prior notice. The latest official version is based on the company website release.

Any infringement of the company’s copyrights and intellectual property rights will be pursued in accordance with the law.

Contact Information

Manufacturer: Guangdong Lain Intelligent System Development Co., Ltd.

Service Hotline: +86 13538869979 (WhatsApp available)

Technical Support: +86 13538869979

Company Address: Zhongrun Industrial Park, No. 5 Huashan Road, Shilou Town, Panyu District, Guangzhou

Official Website: gdlain.com

Scroll to Top