Manufacturer: Guangzhou Lain Intelligent System Development Co., Ltd.
Document Version: V2.0
Release Date: July 2026
Table of Contents
TogglePreface
With the continued advancement of global informatization, the protection of classified information security has become a core security issue in party and government organs, military research, finance and securities, core enterprises, and other fields. Electromagnetic leakage emission (TEMPEST) risk, as the most concealed and easily overlooked physical-layer security hazard in information security protection systems, can be captured by external high-sensitivity receiving equipment through spurious electromagnetic radiation generated during the operation of electronic devices such as computers, printers, and switches, and restored to original data, resulting in the leakage of core secrets.
As the core terminal-level electromagnetic shielding protection device, the shielded desk combines the functionality of an ordinary office workstation with full-band electromagnetic shielding protection capability, representing the optimal solution for physical-level protection of single-workstation classified equipment. Guangzhou Lain Intelligent System Development Co., Ltd. hasdeeply cultivated the electromagnetic shielding field for over a decade. Leveraging its independently developed multi-layer composite shielding technology, high-performance filtering interface technology, and modular structural design philosophy, the company has launched a full series of high-performance shielded desk products that fully comply with BMB19-2006 *Technical Requirements and Test Methods for Electromagnetic Leakage Emission Shielded Cabinets*, GJB5792-2006 *General Specification for Military Electromagnetic Shielded Cabinets*, and GB/T 12190-2021 *Measuring Methods for Shielding Effectiveness of Electromagnetic Shielding Enclosures* and other national and industry standards. These products are widely applied in various classified office, scientific research experimentation, and industrial measurement and control scenarios.
This manual is the official installation, wiring, and commissioning guidance document for the full series of shielded desk products manufactured by Guangzhou Lain Intelligent System Development Co., Ltd. It systematically and comprehensively introduces the product’s technical principles, structural composition, installation process, wiring specifications, commissioning methods, maintenance, troubleshooting, and acceptance criteria throughout the entire lifecycle. It is designed to provide installers, operations and maintenance managers, and end users with standardized, normalized, and actionable operating guidance, ensuring compliant installation, standardized wiring, qualified commissioning, stable operation, and long-term maintenance of optimal shielding effectiveness and performance.
The content of this manual is compiled based on the current technical standards and production processes of Guangzhou Lain Intelligent System Development Co., Ltd. Should technical parameters or structural designs change due to product upgrades and iterations, the product technical documents shipped with the goods shall prevail. The company reserves the final right of interpretation and revision of this manual. Unauthorized copying, reproduction, or alteration of this manual is prohibited.
Chapter 1 Product Introduction
1.1 Product Definition
A shielded desk, also known as an electromagnetic shielding desk, confidential shielding desk, or computer shielding desk, is a dedicated security protection device that integrates an electromagnetic shielding structure, filtering interface system, ventilation and heat dissipation system, and office work surface into one unit. Its core function is to house classified electronic equipment such as computer hosts, monitors, encryption devices, and small switches within a fully enclosed metal shielding cavity, providing comprehensive attenuation of electromagnetic radiation generated by equipment operation to prevent sensitive information from being stolen externally through electromagnetic leakage. Simultaneously, it can resist electromagnetic interference from external strong electromagnetic fields, ensuring stable equipment operation and reducing the health impact of electromagnetic radiation on operators.
Compared with large-scale shielded rooms, shielded desks offer advantages such as flexible deployment, low cost, ease of use, and no need for large-scale site renovation. They can be deployed directly in ordinary office environments, achieving precise electromagnetic protection for single workstations and single devices. They are an important component of the terminal protection system for classified information systems and a key physical protection facility in graded protection, classified protection testing, and confidentiality qualification certification.
1.2 Industry Development Background
1.2.1 Electromagnetic Information Security Situation
In modern information security systems, software-layer security threats such as network attacks and data theft have received widespread attention, but the risk of physical-layer electromagnetic leakage has long been underestimated. As early as the 1960s, the U.S. military launched the TEMPEST special research program, confirming that electronic equipment generates electromagnetic radiation carrying original information during operation, which can be captured and information restored by professional equipment at distances of hundreds or even thousands of meters. With the development of electronic technology, the sensitivity of current eavesdropping equipment continues to improve, with receiving frequency bands covering the full range from 14KHz to 40GHz. Electromagnetic leakage from ordinary commercial computers, printers, classified terminals, and other equipment has become a major hidden danger to information security.
Since the 1990s, China has gradually established an electromagnetic leakage protection standard system, successively releasing BMB series confidentiality standards, GJB military standards, and GB/T national standards, clearly specifying requirements for electromagnetic protection of classified sites. With the implementation of laws and regulations such as the *Cybersecurity Law*, the *Data Security Law*, and the *Regulations on the Security Protection of Critical Information Infrastructure*, electromagnetic shielding protection has comprehensively expanded from military-classified fields to critical information infrastructure sectors including government affairs, finance, energy, and transportation, with market demand continuing to grow rapidly.
1.2.2 Evolution of Shielded Desk Technology
Shielded desk technology has undergone three generations of development:
- First-generation products (2000–2010): Simple metal cabinet bodies with only basic shielding functionality, single interface types, poor heat dissipation, and insufficient operational convenience. Shielding effectiveness generally ranged from 50–60dB, meeting only low-end protection requirements.
- Second-generation products (2010–2020): Integrated filtering interfaces, waveguide ventilation, conductive spring-seal technology, improving shielding effectiveness to 70–80dB. Functionality gradually improved, adapting to standard office equipment and becoming the mainstream configuration for classified units.
- Third-generation products (2020–present): Utilizing multi-layer composite shielding structures, modular design, intelligent temperature control, and fiber-optic transmission technologies, with shielding effectiveness reaching 80–100dB and above, balancing protection performance, user experience, and environmental adaptability, supporting customized modification, and developing toward intelligence, lightweight design, and integration.
The shielded desk products manufactured by Guangzhou Lain Intelligent System Development Co., Ltd. belong to the third generation of high-performance products, integrating multiple self-developed patented technologies and achieving industry-leading levels in shielding effectiveness, structural reliability, interface richness, heat dissipation capability, and ergonomics.
1.3 Product Design Philosophy
1.3.1 Safety-First Principle
All designs prioritize ensuring electromagnetic shielding performance as the core premise. Structural design, material selection, and interface configuration strictly follow national confidentiality standards to ensure stable and compliant shielding effectiveness. All conductive connection points adopt redundant design to prevent shielding performance degradation due to component aging or wear.
1.3.2 Practicality and Convenience Principle
On the basis of ensuring shielding performance, daily office operation requirements are fully considered, optimizing work surface layout, interface positions, and door opening methods to reduce operational complexity and achieve the design goal of “protection without impacting use.” The internal space adopts a modular layout, supporting flexible equipment installation and adjustment.
1.3.3 Durability and Reliability Principle
The main structure is formed by welding high-quality cold-rolled steel plates, with the surface subjected to multiple anti-corrosion treatments. Conductive sealing components are made of high-wear-resistant, anti-oxidation materials, ensuring a service life of no less than 10 years under normal use conditions with long-term stable shielding performance.
1.3.4 Standards Compliance Principle
The entire process of product design, production, and testing strictly follows BMB19-2006, GJB5792-2006, GB/T 12190-2021 and other standards. All factory-shipped products have undergone testing and certification by third-party authoritative organizations and possess complete compliance documentation, meeting various confidentiality assessment and qualification acceptance requirements.
1.4 Product Compliance Certification
The full series of shielded desk products from Guangzhou Lain Intelligent System Development Co., Ltd. has passed the following authoritative certifications:
- National Confidentiality Science and Technology Evaluation Center testing and certification: Complies with BMB19-2006 Class B standards, holds the *Product Testing Certificate for Classified Information Systems*, and is applicable to classified information systems.
- Military information security product certification: Complies with GJB5792-2006 Class B standards, certified by the PLA Information Security Testing and Evaluation Certification Center, and suitable for military-classified sites.
- ISO9001 Quality Management System certification: The entire production process complies with ISO9001:2015 quality management system requirements, ensuring stable and controllable product quality.
- ISO14001 Environmental Management System certification: The production process and product materials comply with environmental protection requirements with no release of hazardous substances.
- Electromagnetic compatibility testing certification: Passes the GB/T 17626 series electromagnetic compatibility immunity tests, demonstrating excellent resistance to external electromagnetic interference.
1.5 Product Model System
The shielded desk products of Guangzhou Lain Intelligent System Development Co., Ltd. cover multiple scenarios and specification requirements, forming a complete product matrix. The core model series are as follows:
1.5.1 LA-PZ Standard Series
Positioned for general classified office scenarios, providing standard protection for single-workstation classified computers with excellent cost-performance ratio. It is the mainstream choice for government agencies and public institutions.
- Representative models: LA-PZ1400, LA-PZ1600
- Core features: Standard dual-compartment structure, integrated basic filtering interfaces, meeting daily office requirements, shielding effectiveness ≥70dB.
1.5.2 LA-PG High-End Series
Positioned for high-level classified scenarios, adopting multi-layer composite shielding structures with higher shielding effectiveness and richer interface configurations, suitable for military, scientific research, and core confidential departments.
- Representative models: LA-PG1400, LA-PG1800
- Core features: Full-band high shielding effectiveness (≥85dB), fiber-optic interface configuration, intelligent temperature-controlled heat dissipation, and support for multi-device integration.
1.5.3 LA-PZ-S Dual-User Series
Positioned for dual-user collaborative office scenarios, with symmetrical dual-workstation design, sharing some common interfaces. Suitable for conference rooms and collaborative office areas.
- Representative model: LA-PZ-S2000
- Core features: Dual independent shielding compartments, simultaneous dual-user operation, spacious work surface, centralized cable management.
1.5.4 LA-PY Laboratory Series
Positioned for scientific research laboratories and electromagnetic compatibility testing scenarios, featuring larger internal space and customizable interfaces, compatible with various experimental equipment and test instruments.
- Representative models: LA-PY1200, LA-PY1500
- Core features: Large-volume shielding cavity, multiple types of test interfaces, adjustable equipment racks, meeting experimental customization requirements.
1.5.5 LA-PD Industrial Series
Positioned for industrial production and measurement and control scenarios, featuring dust-proof, moisture-proof, and vibration-resistant capabilities, compatible with industrial control computers and measurement and control terminal equipment.
- Representative models: LA-PD1200, LA-PD1600
- Core features: Reinforced structural design, industrial-grade filtering interfaces, wide-temperature operation capability, vibration and shock resistance.
This manual uses the market-mainstream LA-PZ1400 standard shielded desk as the core example for explanation. The installation, wiring, and commissioning methods for other models can be performed by referring to this manual; special differences shall be governed by the corresponding model’s product technical attachments.
Chapter 2 Product Composition
The shielded desk is a comprehensive piece of equipment integrating mechanical structure, electromagnetic shielding, electrical filtering, and ventilation and heat dissipation systems. As a whole, it can be divided into seven major parts: main structural system, electromagnetic shielding sealing system, interface filtering system, ventilation and heat dissipation system, electrical control system, internal load-bearing system, and auxiliary accessories. Each system works together to realize core functions including electromagnetic protection, equipment load-bearing, ventilation and heat dissipation, and signal transmission.
2.1 Main Structural System
The main structural system serves as the physical load-bearing foundation of the shielded desk and also the core shielding cavity for electromagnetic shielding. Its structural integrity, material conductivity, and weld sealing directly determine the product’s basic shielding performance.
2.1.1 Shielded Main Cabinet
The shielded main cabinet is a fully enclosed metal welded structure and the core shielding cavity for housing classified equipment.
- Material: 1.2–2.0mm high-quality cold-rolled steel plate (high-end models use galvanized steel plate or stainless steel plate), with uniform plate thickness, excellent electrical conductivity, and high mechanical strength.
- Process: CNC laser cutting, high-precision bending, and argon arc welding continuous welding processes are adopted. All welds are full-penetration welds, ground smooth after welding, ensuring no electromagnetic leakage gaps in the cavity.
- Structure: Typically divided into dual independent shielding compartments (left and right) or a single large-cavity structure. Compartments are completely isolated by metal partition plates to avoid mutual electromagnetic interference between internal devices. Reinforcing ribs are provided at the cabinet bottom to enhance overall load-bearing capacity, with a static load-bearing capacity of no less than 200kg.
- Surface treatment: The interior of the cabinet undergoes conductive passivation treatment to maintain good electrical conductivity. The exterior is subjected to phosphating and electrostatic powder coating, with a coating thickness of 60–80μm, providing anti-rust, wear-resistant, and aesthetically pleasing characteristics. Standard colors available include ivory white, dark gray, and black.
2.1.2 Work Surface
The work surface serves as the load-bearing surface for daily office operations while integrating display viewing and peripheral operation functions.
- Material: The surface substrate is made of high-density fireproof board or solid wood board, with a wear-resistant fireproof laminate on the surface and edge banding treatment for water resistance and wear resistance. A metal shielding layer is bonded beneath the surface, achieving electrical continuity with the main cabinet to prevent electromagnetic leakage through the work surface area.
- Shielded viewing window: An electromagnetic shielding glass viewing window is provided on the work surface corresponding to the monitor position. It uses embedded-mesh shielding glass with a high-density metal mesh embedded inside, electrically connected to the surrounding metal frame, achieving electromagnetic shielding while maintaining visibility. The shielding glass has a light transmittance of ≥30% and shielding effectiveness consistent with the main cabinet body.
- Operating openings: Some models are equipped with openable operating panels for keyboard and mouse operation, fitted with conductive sealing structures that achieve complete shielding when closed.
2.1.3 Shielded Door
The shielded door is the entrance and exit for equipment installation and maintenance, and its sealing performance is a critical factor affecting overall shielding effectiveness.
- Structure: Formed by bending steel plates of the same thickness as the cabinet body, with internal reinforcing ribs to prevent door deformation. Depending on the model, available in single-door, double-door, and flip-up door configurations.
- Hinges: Heavy-duty stainless steel conductive hinges, providing both door rotation function and electrical continuity between the door and cabinet. Hinges have high load-bearing capacity, supporting ≥10,000 open/close cycles without loosening or deformation.
- Locking mechanism: Equipped with multi-point locking handles that achieve synchronized multi-point pressing of the door through a linkage structure, ensuring uniform compression of the conductive gasket and consistent sealing pressure. High-end models are configured with combination locks or fingerprint locks, balancing physical security and electromagnetic security.
2.1.4 Support Leveling Feet / Casters
- Support structure: The cabinet bottom is equipped with four heavy-duty adjustable leveling feet with an adjustable height range of ±20mm for leveling the cabinet on uneven floors.
- Mobile casters: Some models offer optional swivel casters, two of which feature braking functions, facilitating equipment transportation and repositioning. After positioning, the leveling feet can be used to bear the load, preventing long-term stress damage to the casters.
2.2 Electromagnetic Shielding Sealing System
The core function of the electromagnetic shielding sealing system is to fill gaps at the cabinet–door interface, interface ports, ventilation openings, and other locations, achieving electrical continuity of the shielding cavity and blocking electromagnetic leakage through gaps.
2.2.1 Conductive Sealing Gaskets
Conductive sealing gaskets are installed around the door frame of the shielded door and are the core component for ensuring the shielding performance of the door gap.
- Material: Conductive rubber with a silicone rubber base filled with high-purity silver-copper alloy powder, or beryllium copper spring-type conductive spring fingers, offering excellent conductivity and elastic recovery capability.
- Performance: Volume resistivity ≤0.01Ω·cm, compression permanent set ≤10%, operating temperature range -40°C to 120°C, oxidation-resistant, wear-resistant, with a service life of ≥5 years under normal use.
- Installation: Fixed by slot-mounting or adhesive bonding, installed flat, with 45° bevel joint connections at intersections to ensure continuous conductivity without breakpoints.
2.2.2 Gap Conductive Treatment
All splicing welds, bend seams, mounting screw holes, and other locations on the cabinet body are treated with conductive sealing:
- Welded seams use continuous full-penetration welding, ground smooth after welding to ensure electrical continuity;
- Screw assembly locations use conductive washers to ensure electrical conductivity of screw connections;
- Overlap areas of movable components use conductive brush strips or elastic conductive strips to maintain dynamic conductive contact.
2.2.3 Cable Penetration Sealing Structure
All cable entry/exit points into and out of the shielding cavity are provided with dedicated sealing structures using conductive rubber sealing rings or metal cable glands. After cables are routed through, they are locked and sealed, both securing the cables and ensuring electromagnetic shielding continuity at the penetration point.
2.3 Interface Filtering System
The interface filtering system is the core component enabling internal and external signal and power connectivity of the shielded desk. Its function is to ensure normal electrical signal transmission while filtering high-frequency electromagnetic interference carried on cables, preventing electromagnetic signal coupling and leakage through cables. All cables entering and exiting the shielding cavity must be connected through corresponding filters—direct cable penetration without filtering is strictly prohibited.
2.3.1 Power Filters
Power filters provide clean power to internal equipment while blocking electromagnetic signal leakage through power lines.
- Specifications: Standard configuration is a single-phase AC power filter, rated voltage AC220V/50Hz, rated current selectable at 10A/16A, with insertion loss ≥60dB in the 14KHz–10GHz frequency band.
- Structure: Multi-stage LC filter circuit with full-band common-mode and differential-mode suppression, metal shielding enclosure, physical isolation between input and output terminals to prevent internal coupling.
- Installation: The filter housing is electrically connected to the shielding cabinet and installed in the dedicated mounting position at the rear of the cabinet. The input side connects to external mains power, and the output side connects to the internal PDU socket outlet.
2.3.2 Signal Filters
Signal filters are used for shielding and filtering of various data signal lines, available in multiple specifications according to interface type:
- USB filters: Support USB2.0/USB3.0 protocols with transmission rates compatible with 480Mbps/5Gbps. Built-in filter circuits ensure normal data transmission while suppressing high-frequency electromagnetic leakage. Interfaces are configured on both front and rear panels for convenient peripheral connection.
- Network filters: Support 100Mbps/Gigabit Ethernet transmission with built-in RJ45 isolation filter circuits, common-mode rejection ratio ≥40dB, compliant with IEEE802.3 standards. Some high-end models are equipped with fiber-optic interfaces, using optical transceivers for optical-electrical conversion, physically blocking electromagnetic coupling paths for superior shielding effectiveness.
- Video filters: Support VGA, HDMI, DP and other video interfaces, with built-in high-frequency filter circuits ensuring stable transmission of high-definition video signals and preventing video information leakage through cable radiation.
- Telephone filters: Compatible with RJ11 telephone interfaces, supporting analog telephone signal transmission and filtering high-frequency interference signals on the line.
- Serial port filters: Support RS232/RS485 and other industrial serial port signals, compatible with industrial measurement and control equipment connection requirements.
2.3.3 Interface Panels
All external interfaces are centrally arranged on dedicated interface panels at the rear or side of the cabinet body. The interface panels are electrically connected to the cabinet, and each interface filter housing is conductive with the panel, forming a complete shielding system. Interface panels have clear interface markings for easy wiring identification.
2.4 Ventilation and Heat Dissipation System
The shielding cavity is a fully enclosed structure, so heat generated by internal equipment operation cannot dissipate naturally. The ventilation and heat dissipation system is responsible for ensuring air circulation and temperature control within the cavity without compromising the cavity’s electromagnetic shielding performance.
2.4.1 Waveguide Ventilation Windows
Waveguide ventilation windows are the core components that achieve both ventilation and shielding, utilizing the cutoff waveguide principle to allow air passage while blocking electromagnetic wave transmission.
- Structure: Honeycomb waveguide structure composed of numerous hexagonal metal waveguide tubes. The waveguide cutoff frequency is far higher than the operating frequency band, ensuring electromagnetic signals cannot pass through.
- Material: Made of tin-plated steel plate or stainless steel plate with excellent surface conductivity, ventilation rate ≥60%, low wind resistance, and high ventilation efficiency.
- Configuration: Typically two sets of waveguide windows are provided for air intake and exhaust, located at the lower and upper portions of the cabinet respectively, forming a bottom-to-top heat dissipation air duct. Dust filter screens are installed on the outer side of the waveguide windows to prevent dust from entering the cavity.
2.4.2 Cooling Fans
Cooling fans provide the driving force for air circulation, accelerating the removal of internal heat.
- Specifications: Low-noise axial fans or centrifugal fans are used, with airflow configured according to cavity volume, typically 80–150CFM, noise ≤35dB, meeting office environment noise requirements.
- Control: Standard configuration includes manual switch control. High-end models are equipped with temperature sensors and intelligent temperature control modules that automatically adjust fan speed or on/off status based on cavity temperature, achieving energy savings and quiet operation.
- Installation: Fans are installed on the inner side of the exhaust waveguide windows. The fan housing is electrically connected to the cabinet, and fan power cables are filtered to avoid becoming an electromagnetic leakage path.
2.4.3 Internal Air Duct Design
Air-guiding structures are provided inside the cabinet to direct cool air to enter from the lower intake windows, flow through equipment heat-generating areas, and exhaust from the upper outlet windows, forming an orderly air duct and preventing localized heat accumulation. Internal equipment mounting racks are configured with ventilation gaps to ensure air circulation around equipment bottoms and sides.
2.5 Electrical Control System
The electrical control system is responsible for internal power distribution, status indication, and safety protection of the shielded desk.
2.5.1 Power Distribution Unit (PDU)
- Configuration: A standard rack-mount PDU is installed internally, equipped with 6–8 national standard 10A sockets, providing power interfaces for internal hosts, monitors, and other equipment.
- Protection: The PDU integrates overload protection and leakage protection functions, with rated current matched to the power filter. It automatically cuts power in the event of overload or leakage, protecting equipment and personnel safety.
- Installation: Fixed to the inner side wall of the cabinet with standardized wiring and clear labeling.
2.5.2 Control Panel
The control panel is generally located on the front or side of the cabinet for convenient daily operation by personnel:
- Main power switch: Controls overall unit power on/off with an indicator light showing power status.
- Fan control switch: Independently controls cooling fan start/stop; some models feature multi-speed adjustment.
- Status indicator lights: Include power indicator, operating indicator, and fault alarm light (high-end models are equipped with temperature and humidity alarms).
2.5.3 Safety Protection Components
- Residual current circuit breaker (RCCB): Configured on the main input circuit, with leakage trip current of 30mA and trip time ≤0.1s, ensuring personal safety.
- Overcurrent fuses: Configured on the main circuit and each branch circuit, providing fuse protection during overcurrent conditions to prevent equipment burnout.
- Ground terminal: A dedicated grounding terminal is provided on the cabinet for connecting to the external grounding system, discharging static electricity and induced charges.
2.6 Internal Load-Bearing System
The internal load-bearing system is used to secure and support various electronic devices installed inside, achieving orderly equipment layout and stable installation.
2.6.1 Equipment Racks
- Host tray: Pull-out host trays made of cold-rolled steel plate with anti-slip surface treatment, load capacity ≥50kg. Trays are equipped with rails for pull-out and push-in operation, facilitating equipment installation and wiring.
- Equipment shelves: 1–2 adjustable shelves configured according to cavity height for placing printers, encryption machines, small switches, and other equipment. Shelf height can be adjusted based on equipment dimensions, and shelves feature ventilation holes that do not impede heat dissipation.
- Monitor bracket: An adjustable monitor bracket is configured inside the shielded viewing window, supporting monitors of different sizes with adjustable angle for optimal viewing perspective.
2.6.2 Cable Management Components
- Cable management racks: Cable management racks and cable tie holes are provided inside the cabinet for organizing and securing internal cables, maintaining neat wiring.
- Cable labels: Cable labels are shipped with the product for identifying the purpose of each cable and corresponding interface, facilitating later maintenance and troubleshooting.
2.7 Auxiliary Accessories
The shielded desk is shipped with a complete set of installation and usage accessories. See Chapter 3 Product List for the detailed list, which mainly includes: dedicated mounting screws, grounding cables, spare conductive gaskets, dust filter screens, power cables, data cables, installation tools, product certificate of conformity, and copies of test reports.
Chapter 3 Product List
Upon receiving the goods, please immediately conduct an unboxing verification against this product list, checking whether the product appearance is intact and all accessories are complete. If packaging damage, missing components, appearance deformation, or other issues are found, please immediately photograph and retain evidence and contact our after-sales service personnel. Do not sign for acceptance or install the equipment on your own.
3.1 Main Unit Component List
Taking the LA-PZ1400 standard shielded desk as an example, the main unit component list is shown in the table below:
| No. | Component Name | Specification/Model | Qty | Unit | Remarks |
|---|---|---|---|---|---|
| 1 | Shielded desk main body | LA-PZ1400 | 1 | Unit | Includes left and right dual shielding compartments, work surface, shielded doors |
| 2 | Shielded viewing window | 19-inch standard shielding glass | 1 | Piece | Pre-installed on work surface |
| 3 | Left shielded door | Matches main body | 1 | Leaf | With hinges and locking handle, conductive gasket pre-installed |
| 4 | Right shielded door | Matches main body | 1 | Leaf | With hinges and locking handle, conductive gasket pre-installed |
| 5 | Host pull-out tray | 500×400mm | 2 | Piece | 1 for each compartment, with rails |
| 6 | Equipment shelf | 600×300mm | 1 | Piece | Height adjustable |
| 7 | Monitor bracket | Universal for 17–24 inch | 1 | Set | Installed on inner side of viewing window |
| 8 | Heavy-duty leveling foot | M16×80mm | 4 | Piece | Bottom support, height adjustable |
3.2 Electrical and Filtering Component List
| No. | Component Name | Specification Parameters | Qty | Unit | Remarks |
|---|---|---|---|---|---|
| 1 | Power filter | AC220V 10A multi-stage filtering | 1 | Unit | Pre-installed at rear of cabinet |
| 2 | USB filter | USB2.0 2 front ports + 2 rear ports | 2 | Set | Pre-installed on interface panel |
| 3 | Network filter | Gigabit RJ45 single-channel | 1 | Piece | Pre-installed on interface panel |
| 4 | Telephone filter | RJ11 single-channel | 1 | Piece | Pre-installed on interface panel |
| 5 | Video filter | VGA single-channel | 1 | Piece | Pre-installed on interface panel |
| 6 | Internal PDU socket strip | 6-position national standard 10A with overload protection | 1 | Piece | Pre-installed on inner side of left compartment |
| 7 | Main power switch | Illuminated 16A | 1 | Piece | Pre-installed on front control panel |
| 8 | Fan control switch | SPDT | 1 | Piece | Pre-installed on front control panel |
| 9 | Residual current circuit breaker | C10 30mA | 1 | Piece | Pre-installed on power input circuit |
| 10 | Ground terminal block | 3-position copper | 1 | Piece | Pre-installed at cabinet bottom |
3.3 Heat Dissipation System Component List
| No. | Component Name | Specification Parameters | Qty | Unit | Remarks |
|---|---|---|---|---|---|
| 1 | Intake waveguide window | 200×300mm honeycomb type | 2 | Piece | Pre-installed on lower sides of cabinet |
| 2 | Exhaust waveguide window | 150×150mm honeycomb type | 2 | Piece | Pre-installed on upper sides of cabinet |
| 3 | Cooling axial fan | DC12V 0.15A 80CFM | 2 | Unit | Pre-installed on inner side of exhaust windows |
| 4 | Dust filter screen | Matches waveguide window dimensions | 4 | Piece | Installed on outer side of waveguide windows, replaceable |
| 5 | Temperature control module | -10~80°C adjustable | 1 | Set | High-end model configuration; standard models use manual control |
3.4 Sealing and Shielding Accessory List
| No. | Component Name | Specification Parameters | Qty | Unit | Remarks |
|---|---|---|---|---|---|
| 1 | Door conductive gasket | Silver-copper conductive rubber 10×5mm | 8 | Meter | Pre-installed on door frame, 1 meter spare shipped with goods |
| 2 | Conductive sealing strip | 6×3mm | 2 | Meter | Spare, for supplementary gap sealing |
| 3 | Conductive washer | M6 copper tin-plated | 20 | Piece | Spare installation accessory |
| 4 | Cable sealing gland | PG13.5 | 4 | Piece | Spare cable penetration seal |
3.5 Documentation and Tools Shipped with Goods
| No. | Name | Qty | Unit | Remarks |
|---|---|---|---|---|
| 1 | This installation and commissioning manual | 1 | Copy | Paper version |
| 2 | Product certificate of conformity | 1 | Sheet | Includes factory inspection records |
| 3 | Copy of product test report | 1 | Copy | Third-party shielding effectiveness test report |
| 4 | Product warranty card | 1 | Card | Effective after completion |
| 5 | Hex wrench set | 1 | Set | Dedicated installation and commissioning tool |
| 6 | Phillips/flathead screwdrivers | 1 each | Piece | Installation tools |
| 7 | Dedicated grounding cable | 16mm² 3m | 1 | Piece |
| 8 | Cable label stickers | 1 | Sheet | For cable identification |
| 9 | Equipment cable ties | 20 | Piece | Nylon cable ties 4×200mm |
3.6 Optional Accessory List (Requires Separate Order)
The following are optional upgrade accessories. Users may select according to actual requirements:
- Fiber-optic transmission kit: Includes a pair of optical transceivers and fiber-optic filter interface, enabling all-optical signal transmission for superior shielding effectiveness.
- HDMI/DP high-definition video filters: Compatible with high-definition display devices.
- Intelligent temperature and humidity monitoring system: Real-time monitoring of cavity temperature and humidity with audible and visual alarm upon threshold exceedance.
- Fingerprint/combination electronic lock: Enhances physical security level.
- Swivel casters: Facilitate equipment relocation.
- Spare conductive gasket set: Replacement spare parts for long-term use.
- Spare dust filter screen set: Consumables for periodic replacement.
- Dedicated shielding test instruments: Near-field probes, field strength meters, and other testing equipment.
3.7 Unboxing Acceptance Precautions
1. Use dedicated tools when unpacking to avoid scratches to the cabinet surface or damage to internal components from rough handling.
2. After unpacking, first inspect the overall appearance of the equipment, checking for impacts, deformation, paint peeling, corrosion, etc. Pay special attention to the shielded doors, viewing window, and interface panels.
3. Check components and accessories one by one against the above lists, verifying that models and quantities match the order.
4. Verify that the product certificate of conformity, test reports, and other documentation are complete, and confirm the product manufacturing date and warranty period.
5. After verifying accuracy, fill in the arrival acceptance form and retain relevant documentation. If any issues are found, contact the supplier immediately and retain unboxing photos and video evidence.
Chapter 4 Product Working Principle
The core function of the shielded desk is to achieve electromagnetic shielding. Its working principle is based on classical electromagnetic field theory and electromagnetic shielding technology, comprehensively utilizing three shielding mechanisms—reflection loss, absorption loss, and multiple-reflection loss—combined with filtering technology, grounding technology, and sealing technology to achieve full-band electromagnetic protection. This chapter starts from fundamental theory and provides a detailed explanation of the electromagnetic shielding principles of the shielded desk, the working principles of each subsystem, and factors affecting performance.
4.1 Basic Theory of Electromagnetic Shielding
4.1.1 Definition of Electromagnetic Shielding
Electromagnetic shielding refers to the technical measure of using a shield made of conductive or magnetically conductive materials to confine electromagnetic energy within a certain spatial range, suppressing electromagnetic energy radiation from the interior of the shield to the exterior (preventing leakage), while simultaneously blocking external electromagnetic energy from entering the shield interior (anti-interference).
Shielding Effectiveness (SE) is the core metric for measuring shielding performance, expressed in decibels (dB). It is defined as the logarithmic ratio of the field strength at the receiving point with and without the shield present, calculated as:
SE = 20lg(E₀/E₁) = 20lg(H₀/H₁)
Where E₀ and H₀ are the electric field strength and magnetic field strength without shielding, and E₁ and H₁ are the electric field strength and magnetic field strength with shielding.
The larger the shielding effectiveness value, the better the shielding effect. For example, 60dB shielding effectiveness means the field strength is attenuated to one-thousandth of its original value, while 80dB attenuates it to one ten-thousandth.
4.1.2 Three Shielding Loss Mechanisms
The total shielding effectiveness of an electromagnetic shield consists of three components: reflection loss, absorption loss, and multiple-reflection loss:
SE = R + A + B
Where:
- R (Reflection Loss): When an electromagnetic wave is incident on the shield surface, due to the impedance mismatch between air and the shielding material, a portion of the electromagnetic wave is reflected back to the original medium and cannot enter the shield interior. Reflection loss is related to the material’s electrical conductivity, magnetic permeability, and the electromagnetic wave frequency. The higher the conductivity, the greater the reflection loss. Reflection loss is smaller for low-frequency magnetic fields and larger for high-frequency electric fields.
- A (Absorption Loss): For electromagnetic waves that enter the shield interior, as they propagate through the material, induced eddy currents generate thermal losses, and electromagnetic energy is converted to heat and attenuated. Absorption loss is positively correlated with material thickness, electrical conductivity, magnetic permeability, and frequency. The thicker the material and the higher the frequency, the greater the absorption loss.
- B (Multiple-Reflection Loss): A correction term resulting from multiple reflections of electromagnetic waves between the two surfaces of the shield. When absorption loss A > 10dB, the multiple-reflection loss can be neglected. For thin shields or low-frequency scenarios, the effect of multiple-reflection loss must be considered.
4.1.3 Shielding Mechanisms in Different Frequency Bands
Electromagnetic waves can be classified into low-frequency magnetic fields, low-frequency electric fields, plane waves, and other types based on frequency. The dominant shielding mechanism differs across frequency bands:
- Low frequency band (14KHz–1MHz): Dominated by magnetic fields with low wave impedance and low reflection loss. Shielding primarily relies on the absorption loss of high-permeability materials, typically using ferromagnetic materials such as permalloy and silicon steel.
- Mid-high frequency band (1MHz–1GHz): Electric and magnetic field components coexist, with both reflection loss and absorption loss playing a role. Ordinary conductive metal materials (copper, steel, aluminum) can achieve good shielding.
- High frequency band (above 1GHz): Propagates in plane wave form with significant skin effect. Electromagnetic waves concentrate in a very thin layer on the material surface. Reflection loss dominates, with less demanding requirements on material thickness, but extreme sensitivity to gaps and apertures—any tiny gap can cause serious leakage.
The shielded desk is designed for the wide 14KHz–18GHz frequency band, adopting a steel plate main body combined with a multi-layer composite shielding structure, balancing low-frequency magnetic shielding and high-frequency electric shielding to achieve stable full-band shielding effectiveness.
4.2 Working Principle of the Shielding Cavity
The main cabinet of the shielded desk forms an approximately rectangular metal shielding cavity, which is the primary structure for achieving electromagnetic shielding. Its working principle is as follows:
4.2.1 Shielding Effect of a Continuous Metal Shell
A fully enclosed continuous metal shell is the foundation of shielding effectiveness. Cold-rolled steel plate possesses good electrical conductivity and a certain degree of magnetic permeability. When electromagnetic waves generated by internal equipment radiate onto the inner wall of the shell, most of the energy is reflected by the metal surface, the remaining portion enters the metal interior and is absorbed and attenuated, and an extremely small portion can penetrate the shell. Similarly, external electromagnetic waves find it difficult to penetrate the shell and enter the interior, thereby achieving bidirectional shielding.
For an ideal fully enclosed metal cavity with no apertures or gaps, shielding effectiveness can reach above 100dB. However, actual products inevitably require openings and gaps for doors, ventilation openings, cable interfaces, etc. These locations are the main channels for electromagnetic leakage and are the focus of shielding design.
4.2.2 Gap Leakage Suppression Principle
Gaps are the primary leakage source of the shielding cavity. The degree of electromagnetic wave leakage through a gap is related to the gap length, depth, and electromagnetic wavelength: when the gap length approaches or exceeds half the wavelength, it becomes a highly efficient radiating slot, and leakage increases dramatically; the greater the gap depth, the smaller the leakage.
The shielded desk suppresses gap leakage through the following techniques:
- Conductive gasket filling: Conductive rubber gaskets are filled into movable gaps such as door seams, replacing the air gap between the door and cabinet with conductive material, achieving electrical continuity and eliminating the gap. Conductive gaskets possess a certain elasticity, compensating for door manufacturing tolerances and deformation, ensuring good long-term contact.
- Increasing gap depth: The door frame adopts a stepped or labyrinth structure to increase the effective depth of the gap, enhancing the cutoff attenuation effect of the gap and reducing leakage.
- Reducing gap length: Multi-point locking structures are used to ensure uniform gasket compression, avoiding localized oversized gaps; welded seams use continuous full-penetration welding to eliminate long gaps.
- Improving contact conductivity: Contact surfaces undergo conductive treatment to remove insulating coatings, and conductive screws and conductive washers are used to improve electrical conductivity at overlapping joints and reduce contact resistance.
4.2.3 Aperture Leakage Suppression Principle
Ventilation openings, viewing windows, mounting holes, and other apertures are another type of major leakage source. The shielded desk adopts corresponding suppression solutions for different types of apertures:
- Ventilation openings: Honeycomb waveguide window structures are used to decompose a single large aperture into numerous small waveguide tubes. Each waveguide tube acts as a high-pass filter. When the electromagnetic wave frequency is far below the waveguide cutoff frequency, the electromagnetic wave attenuates rapidly within the waveguide and cannot pass through. The waveguide cutoff frequency is inversely proportional to the waveguide cross-sectional dimensions—the smaller the dimensions, the higher the cutoff frequency, and the better the shielding effect.
- Viewing apertures: Embedded-mesh shielding glass is used, with a high-density metal mesh embedded between two layers of glass. The metal mesh is electrically connected to the surrounding metal frame, forming a continuous shielding surface. The mesh grid size of the metal mesh is much smaller than the operating wavelength, producing strong reflection of electromagnetic waves while allowing visible light to pass through.
- Small mounting holes: Conductive screws are used for fastening, combined with conductive washers to ensure electrical continuity at hole locations. Cable penetrations are sealed using metal cable glands with conductive sealing rings to eliminate gap openings.
4.3 Working Principle of the Filtering System
Cavity shielding alone cannot completely solve the electromagnetic leakage problem, because power lines and signal lines entering and exiting the shield are themselves conduction paths for electromagnetic waves. Electromagnetic signals from internal equipment can couple onto cables, conducted through the cables outside the shield and radiated outward. External interference can also be conducted through cables into the interior. The function of the filtering system is to filter out high-frequency electromagnetic interference signals on cables while allowing useful low-frequency/baseband signals to pass through normally.
4.3.1 Working Principle of Power Filters
The power filter is a low-pass filter that allows 50Hz industrial-frequency power to pass through normally while significantly attenuating high-frequency electromagnetic interference signals above 14KHz.
- Circuit structure: Typically uses a multi-stage LC filter circuit containing common-mode inductors, differential-mode capacitors, common-mode capacitors, and other components. The common-mode inductor suppresses common-mode interference, capacitors filter differential-mode interference, and multi-stage cascading achieves wide-band high insertion loss.
- Shielding principle: The filter housing is a metal shielding enclosure that is electrically connected to the shielding cabinet during installation, enclosing the filter circuit within the shielding cavity to prevent radiation from the filter itself. Input lines and output lines are physically isolated to prevent input–output coupling bypass, ensuring filtering effectiveness.
- Grounding requirements: The filter housing must be reliably grounded to provide a discharge path for interference signals. Poor grounding will cause a significant degradation in filtering performance.
4.3.2 Working Principle of Signal Filters
Signal filters are designed according to the type of transmitted signal, suppressing out-of-band high-frequency interference while ensuring undistorted transmission of useful signals.
- Digital signal filters (USB, network, etc.): Use low-pass filter topology with a cutoff frequency slightly above the signal’s maximum frequency, allowing baseband digital signals to pass while attenuating high-frequency spurious radiation. Common-mode suppression circuits are also integrated to suppress common-mode electromagnetic interference on cables.
- Fiber-optic transmission solution: For high-level protection requirements, an optical-electrical conversion solution is adopted. Internal electrical signals are converted to optical signals by optical transceivers, transmitted out of the shielding cavity through fiber-optic cables, and converted back to electrical signals externally. Since fiber-optic cables are non-conductive, the electromagnetic coupling path is completely blocked, providing far superior shielding effectiveness compared to electrical signal filters. This is the preferred solution for high-security classification scenarios.
4.4 Grounding System Working Principles
Grounding is an integral part of the electromagnetic shielding system. Proper grounding is critical to ensuring shielding performance, equipment safety, and personnel safety.
4.4.1 Functions of Grounding
Static Discharge: Discharges static charges accumulated on the shielding enclosure surface to earth, preventing electrostatic discharge from interfering with internal equipment while ensuring operator safety.
Interference Discharge: Provides a low-impedance discharge path for interference signals filtered by the filter circuits, ensuring filtering effectiveness.
Shielding Effectiveness Enhancement: For electric field shielding, grounding significantly improves shielding performance; an ungrounded shield can instead become a radiating antenna, amplifying interference.
Safety Protection: In the event of equipment leakage, the grounding system conducts leakage current to earth, triggering the residual current protection device to operate, preventing electric shock accidents.
4.4.2 Shielding Desk Grounding Method
The shielding desk adopts a single-point grounding method. All grounding points on the cabinet are consolidated to a dedicated grounding terminal and then connected to the building grounding grid via a single grounding conductor. Single-point grounding avoids the formation of ground loops, preventing interference coupling into the system caused by ground loop currents.
The grounding conductor uses stranded copper-core insulated wire with a cross-sectional area of ≥16 mm², kept as short as possible to reduce grounding impedance.
Grounding resistance requirement: ≤1 Ω; for high-level protection scenarios: ≤0.5 Ω.
Grounding connection points use copper lug terminals, crimped securely, with anti-corrosion treatment to ensure long-term reliable contact.
4.5 Cooling System Working Principles
The cooling system discharges heat from inside the cavity without compromising shielding performance, ensuring stable equipment operation.
Air Circulation Principle: When the cooling fan operates, negative pressure is formed inside the cavity. External cool air enters the cavity through the lower air intake waveguide window, flows across equipment surfaces to absorb heat, and the heated air rises and is exhausted by the fan through the upper air outlet waveguide window, forming a complete air circulation path.
Waveguide Ventilation Principle: Air can freely pass through the honeycomb waveguide apertures, but electromagnetic waves cannot pass due to the cutoff effect, thereby achieving both ventilation and shielding. The ventilation rate and airflow resistance parameters of the waveguide window directly affect cooling efficiency. Our company’s products have undergone computational fluid dynamics (CFD) optimization, resulting in low airflow resistance and high cooling efficiency.
Temperature Control Principle: Smart temperature-control models feature built-in temperature sensors that collect real-time cavity temperature. When the temperature rises above the set upper limit, the fan activates; when it falls below the set lower limit, the fan stops, achieving energy savings and noise reduction while avoiding excessive temperature fluctuations.
4.6 Key Factors Affecting Shielding Effectiveness
The actual shielding effectiveness of the shielding desk is affected by multiple factors. Understanding these factors helps ensure correct installation and use to maintain optimal shielding performance:
Material Factors: The electrical conductivity, magnetic permeability, and thickness of shielding materials directly affect baseline shielding effectiveness. The better the material’s electrical and magnetic conductivity, and the thicker the material, the higher the shielding effectiveness.
Seam Factors: Door sealing is the most critical influencing factor. Worn, aged, or contaminated conductive gaskets, door deformation, and insufficient locking pressure can all increase seam leakage and reduce shielding effectiveness.
Aperture Factors: Unauthorized drilling, damaged waveguide windows, and unsealed cable glands all create additional leakage apertures that reduce shielding effectiveness.
Cable Factors: Cables passing directly through without filters, poor filter grounding, and parallel routing of input/output cables can cause electromagnetic signals to bypass through the cables, severely affecting overall shielding effectiveness.
Grounding Factors: Poor grounding and excessive grounding resistance reduce electric field shielding effectiveness and weaken filtering performance.
Maintenance Factors: Prolonged lack of cleaning, oxidation of conductive contact surfaces, and aging or damage of components can cause gradual degradation of shielding performance.
Chapter 5 Product Technical Parameters
This chapter details the core technical parameters of the LA-PZ series shielding desks manufactured by Guangzhou Lain Intelligent System Development Co., Ltd., including shielding performance parameters, electrical parameters, mechanical structure parameters, environmental parameters, and material parameters. All parameters are measured under standard test conditions; slight deviations may occur in actual use due to environmental differences.
5.1 Shielding Performance Parameters
Shielding performance parameters are the core indicators of the shielding desk. All indicators are measured in accordance with the GB/T 12190-2021 standard test methods at third-party accredited laboratories.
5.1.1 Standard Type (LA-PZ Series) Shielding Effectiveness
| Frequency Range | Electric Field Shielding Effectiveness | Magnetic Field Shielding Effectiveness | Plane Wave Shielding Effectiveness | Standard Grade |
|---|---|---|---|---|
| 14 kHz ~ 100 kHz | ≥60 dB | ≥50 dB | ≥55 dB | BMB19-2006 Grade B |
| 100 kHz ~ 1 MHz | ≥70 dB | ≥60 dB | ≥65 dB | BMB19-2006 Grade B |
| 1 MHz ~ 1 GHz | ≥80 dB | ≥70 dB | ≥75 dB | BMB19-2006 Grade B |
| 1 GHz ~ 10 GHz | ≥75 dB | — | ≥75 dB | BMB19-2006 Grade B |
| 10 GHz ~ 18 GHz | ≥70 dB | — | ≥70 dB | BMB19-2006 Grade B |
5.1.2 High-End Type (LA-PG Series) Shielding Effectiveness
| Frequency Range | Electric Field Shielding Effectiveness | Magnetic Field Shielding Effectiveness | Plane Wave Shielding Effectiveness | Standard Grade |
|---|---|---|---|---|
| 14 kHz ~ 100 kHz | ≥70 dB | ≥60 dB | ≥65 dB | GJB5792-2006 Grade B |
| 100 kHz ~ 1 MHz | ≥80 dB | ≥70 dB | ≥75 dB | GJB5792-2006 Grade B |
| 1 MHz ~ 1 GHz | ≥90 dB | ≥80 dB | ≥85 dB | GJB5792-2006 Grade B |
| 1 GHz ~ 10 GHz | ≥85 dB | — | ≥85 dB | GJB5792-2006 Grade B |
| 10 GHz ~ 18 GHz | ≥80 dB | — | ≥80 dB | GJB5792-2006 Grade B |
5.1.3 Key Component Shielding Parameters
Shielding Glass: Light transmittance ≥30%, shielding effectiveness consistent with the main cabinet body, no significant leakage points.
Waveguide Ventilation Window: Cutoff frequency ≥30 GHz, shielding effectiveness ≥80 dB within the operating frequency band, ventilation rate ≥60%.
Power Filter: Insertion loss ≥60 dB from 14 kHz to 10 GHz, rated voltage AC 220 V, rated current 10 A/16 A.
Signal Filters: USB 2.0 insertion loss ≥40 dB, Gigabit Ethernet insertion loss ≥45 dB, VGA insertion loss ≥40 dB.
5.2 Electrical Parameters
| Parameter Category | Parameter Name | Standard Type Specification | High-End Type Specification | Remarks |
|---|---|---|---|---|
| Power Input | Rated Voltage | AC 220V ±10% | AC 220V ±10% | 50 Hz |
| Rated Power | 2000 W | 3000 W | Maximum load | |
| Standby Power Consumption | ≤5 W | ≤8 W | Fan stopped state | |
| Output Configuration | Internal Outlets | 6-position 10 A GB standard | 8-position 10 A GB standard | With overload protection |
| USB Ports | 2 front + 2 rear USB 2.0 | 2 front + 4 rear USB 3.0 | Filtered ports | |
| Network Ports | 1× Gigabit RJ45 | 2× Gigabit RJ45 + 1× fiber optic | Filtered ports | |
| Video Ports | 1× VGA | 1× VGA + 1× HDMI | Filtered ports | |
| Telephone Port | 1× RJ11 | 1× RJ11 | Filtered ports | |
| Fan Parameters | Number of Fans | 2 units | 4 units | Axial fans |
| Airflow per Fan | 80 CFM | 120 CFM | At rated speed | |
| Operating Noise | ≤35 dB | ≤38 dB | At 1 m distance | |
| Protection Parameters | Residual Current Protection | 30 mA, 0.1 s | 30 mA, 0.1 s | Leakage trip |
| Overload Protection | 10 A thermal trip | 16 A thermal trip | Overcurrent protection | |
| Insulation Resistance | ≥100 MΩ | ≥100 MΩ | Between power supply and housing | |
| Dielectric Strength | AC 1500 V, 1 min | AC 1500 V, 1 min | No breakdown or flashover |
5.3 Mechanical Structure Parameters
Using the mainstream model LA-PZ1400 as an example, the structural dimension parameters are as follows:
| Parameter Name | Parameter Value | Remarks |
|---|---|---|
| Overall Dimensions (W × D × H) | 1400 mm × 700 mm × 760 mm | Including work surface and leveling feet |
| Work Surface Height | 760 mm | Standard office height, adjustable ±20 mm |
| Left Shielding Compartment Internal Dimensions | 650 mm × 600 mm × 500 mm | W × D × H |
| Right Shielding Compartment Internal Dimensions | 650 mm × 600 mm × 500 mm | W × D × H |
| Shielding Observation Window Visible Area | 410 mm × 260 mm | Compatible with 19-inch monitors |
| Overall Net Weight | Approx. 180 kg | Standard configuration |
| Static Load Capacity | ≥200 kg | Uniform load on work surface |
| Internal Equipment Load Capacity | ≥80 kg/compartment | Total load of bracket + shelf |
| Door Opening Angle | ≥110° | Maximum opening angle |
| Leveling Foot Adjustment Range | ±20 mm | Height adjustment |
| Plate Thickness | Main body 1.5 mm, door panel 2.0 mm | Cold-rolled steel plate |
| Surface Coating Thickness | 60–80 μm | Electrostatic powder coating |
5.4 Environmental Adaptability Parameters
| Parameter Category | Parameter Name | Parameter Specification | Remarks |
|---|---|---|---|
| Operating Environment | Operating Temperature | 0°C ~ 45°C | Normal operating range for internal equipment |
| Storage Temperature | -20°C ~ 60°C | Equipment storage and transport temperature | |
| Relative Humidity | 30% ~ 80% | Non-condensing | |
| Atmospheric Pressure | 86 kPa ~ 106 kPa | Altitude ≤2000 m | |
| Environmental Tolerance | Vibration Resistance | 10–55 Hz, 0.15 mm double amplitude | Transport and industrial environments |
| Shock Resistance | 10 g, 11 ms, half-sine wave | Handling and drop tolerance | |
| Salt Spray Protection | 48 h without significant corrosion | Basic anti-corrosion; industrial type up to 96 h | |
| Dust Protection Rating | IP50 | Internal cavity dust protection |
5.5 Material and Process Parameters
5.5.1 Main Materials
Cabinet Plate: High-quality cold-rolled steel plate, grade SPCC, thickness 1.5–2.0 mm, conforming to GB/T 708 standard.
Conductive Gasket: Silver-copper filled silicone rubber, silver-copper content 70%, volume resistivity ≤0.01 Ω·cm, Shore hardness 60±5.
Shielding Glass: Double-layer tempered glass with embedded metal mesh, mesh material 304 stainless steel, 80 mesh count.
Waveguide Window: Tin-plated cold-rolled steel plate, honeycomb aperture 3.2 mm, wall thickness 0.2 mm, height 25 mm.
5.5.2 Surface Treatment Process
Pre-treatment: Alkaline wash → acid pickling → phosphating → passivation, to remove oil and rust, forming a phosphate film to enhance adhesion.
Exterior Surface: Epoxy electrostatic powder coating, uniform coating, adhesion ≥Grade 1, pencil hardness ≥2H, impact resistance ≥50 kg·cm.
Interior Surface: Conductive passivation treatment, maintaining natural metal color, contact resistance ≤10 mΩ.
Welding Process: Argon arc continuous welding, weld height ≥plate thickness, free from cold welds, missed welds, and porosity defects.
5.6 Reliability and Service Life Parameters
Mean Time Between Failures (MTBF): ≥50,000 hours.
Door Opening/Closing Service Life: ≥10,000 cycles, with no significant degradation in gasket performance.
Fan Service Life: ≥30,000 hours (at 25°C ambient temperature).
Overall Designed Service Life: ≥10 years (under normal use and regular maintenance conditions).
Warranty Period: 2-year free warranty for the complete unit, 3-year warranty for core components, and lifetime technical support and repair services.
Chapter 6 Product Functions and Features
The shielding desks manufactured by Guangzhou Lain Intelligent System Development Co., Ltd. integrate multiple practical functions on the basis of ensuring core electromagnetic shielding functionality, offering comprehensive advantages that fully meet the usage requirements of classified offices, scientific research experiments, and industrial measurement and control scenarios.
6.1 Core Functions
6.1.1 Prevention of Electromagnetic Information Leakage
This is the most core function of the shielding desk. Through a fully enclosed metal shielding cavity, high-performance conductive sealing structures, and filtered interface systems, it comprehensively blocks electromagnetic leakage emissions generated by internal classified computers, printers, encryption devices, and other electronic equipment, preventing sensitive information from being intercepted externally through electromagnetic radiation and ensuring classified information security.
- Full frequency band coverage from 14 kHz to 18 GHz, with effective suppression of typical leakage frequency bands including computer video radiation, host spurious radiation, and network signal radiation;
- Shielding effectiveness consistently meets standards, complying with national confidentiality standards and military standards, capable of passing various confidentiality assessments and security inspections;
- Physical layer protection, unaffected by software, viruses, or network attacks, with extremely high protection reliability, serving as an important physical barrier in the defense-in-depth information security system.
6.1.2 Resistance to External Electromagnetic Interference
The shielding desk also provides excellent resistance to external electromagnetic interference, effectively protecting internal precision electronic equipment from external strong electromagnetic fields and ensuring stable equipment operation.
- Suppresses electromagnetic interference from external equipment such as variable frequency drives, motors, high-voltage lines, and base stations, preventing internal equipment failures including crashes, restarts, data errors, and transmission packet loss;
- Immunity complies with the GB/T 17626 series standards: radiated immunity up to 10 V/m, conducted immunity up to 3 V, ESD immunity up to ±8 kV contact discharge;
- Suitable for industrial plants, laboratories, and data centers with complex electromagnetic environments, providing a clean electromagnetic environment for precision equipment.
6.1.3 Reduction of Electromagnetic Radiation Exposure
Electromagnetic radiation generated by operating electronic equipment, when acting on the human body over extended periods, may have potential health impacts. The shielding desk confines equipment radiation within the cavity, significantly reducing the electromagnetic radiation intensity at the operator’s position and protecting operator health.
- Electromagnetic radiation intensity at the operator position is far below the requirements of GB 8702-2014 “Electromagnetic Environment Control Limits”;
- Particularly suitable for classified personnel who work long hours at computers, reducing electromagnetic radiation exposure dose.
6.1.4 Equipment Support and Office Operations
The shielding desk provides complete office workstation functionality and can be used directly as a regular office desk:
- Spacious, flat work surface for files, books, office supplies, and other items;
- Clear shielded observation window with built-in monitor bracket for normal computer operation;
- Front-accessible USB ports for direct connection of keyboards, mice, USB drives, and other peripherals for convenient operation;
- Sufficient internal space to accommodate host computers, monitors, printers, encryption machines, and various other equipment for integrated operation.
6.2 Product Features
6.2.1 Excellent and Stable Shielding Performance
- Multi-layer composite shielding technology for full-band shielding effectiveness compliance, exceeding national standards by more than 10 dB in key frequency bands;
- Core sealing components use imported high-quality conductive materials with oxidation resistance and wear resistance, with slow shielding performance degradation over long-term use;
- Every unit undergoes shielding effectiveness sampling inspection before shipment to ensure performance compliance and reliable quality.
6.2.2 Robust, Durable, and Reliable Structure
- Main body uses high-quality thickened cold-rolled steel plate with integrated welded construction, high mechanical strength, and resistance to deformation;
- Heavy-duty hinges and multi-point locking mechanism provide smooth door operation, uniform sealing pressure, and no loosening over long-term use;
- Surface treated with multiple anti-corrosion processes, with wear-resistant and rust-proof coating suitable for various office environments, providing long service life.
6.2.3 Rich Interfaces and Strong Adaptability
- Standard configuration includes power, USB, network, telephone, and VGA interfaces, meeting connection requirements for the vast majority of office equipment;
- Supports customization of HDMI, DP, serial, fiber optic, and other interfaces to accommodate different equipment types;
- All interfaces undergo professional filtering treatment without compromising overall shielding performance; plug-and-play operation.
6.2.4 Efficient Cooling with Quiet Operation
- Optimized airflow channel design combined with high-volume, low-noise fans delivers excellent cooling performance, meeting the heat dissipation requirements of conventional computer equipment;
- Waveguide ventilation windows feature low airflow resistance and high ventilation efficiency, preventing heat accumulation inside the cavity;
- Fans feature silent design with low operating noise that does not disturb the office environment; smart temperature-control models automatically adjust based on temperature, further reducing noise and energy consumption.
6.2.5 Convenient and Efficient Installation and Use
- Shipped as a complete unit; simple wiring after positioning at the site is all that is required — no complex installation or construction needed;
- Modular internal structure for convenient equipment installation and wiring; pull-out brackets facilitate maintenance;
- Simple operation — only needs power on/off and fan switching for normal use, requiring no professional training.
6.2.6 Ergonomic Design for Superior User Experience
- Ergonomic work surface height and viewing angle reduce fatigue during extended operation;
- Light-touch door operation, smooth locking mechanism, well-designed interface layout, and convenient plug/unplug operation;
- Clean, elegant appearance with color schemes coordinated with standard office furniture, blending seamlessly into office environments.
6.2.7 Comprehensive Safety Protection
- Integrated residual current protection, overload protection, grounding protection, and multiple electrical safety protections to safeguard equipment and personnel;
- Reliable metal cabinet grounding prevents static accumulation and leakage risks;
- All electrical components pass safety certifications with compliant insulation performance and no electrical safety hazards.
6.2.8 Flexible Customization for Various Scenarios
- Supports multi-dimensional customization including dimensions, colors, interfaces, and internal structure to meet individual user requirements;
- Can integrate fingerprint locks, combination locks, temperature/humidity monitoring, alarm systems, and other expanded functions;
- Can be tailored for special scenario requirements, including industrial, explosion-proof, and outdoor-specific models.
6.3 Technical Advantages
6.3.1 Labyrinth Door Seam Sealing Technology
The door frame adopts a stepped labyrinth structure combined with dual conductive gaskets. Compared to traditional single flat seam structures, this effectively increases seam depth, significantly reduces electromagnetic leakage at the door seam, improves shielding effectiveness by 10–15 dB, and extends gasket service life.
6.3.2 Multi-Stage Integrated Filtering Technology
Filters adopt multi-stage LC filter circuits providing full-band common-mode and differential-mode suppression, with high insertion loss and excellent filtering performance. Filters feature integrated design with compact installation, physical isolation between input and output ends to prevent internal coupling, and stable filtering performance.
6.3.3 Optimized Airflow Channel Cooling Technology
Airflow channel structure and waveguide window layout are optimized through computational fluid dynamics simulation, creating orderly cooling airflow. Cooling efficiency is improved by 20%, and internal cavity temperature is reduced by 3–5°C under equivalent conditions, ensuring stable long-term equipment operation.
6.3.4 Modular Structural Design Technology
Internal brackets, shelves, and interface panels all adopt modular design for flexible configuration adjustment, convenient upgrades, and reduced maintenance costs. Users can add or remove interfaces and adjust internal space layout as needed.
Chapter 7 Product Application Scenarios
As terminal-level electromagnetic shielding protection equipment, the shielding desk, with its advantages of flexible deployment, precise protection, and convenient use, is widely applied in party and government agencies, military and defense research, financial and securities, energy and transportation, industrial manufacturing, scientific research and educational institutions, and many other fields. It is an ideal protection solution for classified information systems, precision measurement and control systems, and electromagnetic-sensitive equipment.
7.1 Party and Government Agencies and Classified Office Scenarios
7.1.1 Confidential and Secrecy Departments
Core classified sites such as confidential bureaus, secrecy offices, and classified printing rooms at all levels of party committees and governments handle large volumes of state secret information, where the electromagnetic leakage risk from computers, printers, and copiers is extremely high. The shielding desk provides precise protection for individual classified computers without requiring renovation of the entire office, offering low cost and rapid deployment. It complies with graded protection and confidentiality qualification review requirements and is the preferred terminal protection solution for grassroots classified units.
7.1.2 Government Affairs Internal Network
Terminal workstations on government affairs internal networks and classified information systems involve the processing and transmission of government data and sensitive documents. Deploying shielding desks in regular office areas quickly upgrades terminal electromagnetic protection levels, meeting the physical security requirements of Classified Protection Level 2.0 Level 3 and above, preventing government data leakage caused by electromagnetic emissions.
7.1.3 Discipline Inspection and Political-Legal Departments
Discipline inspection commissions, political-legal committees, courts, procuratorates, and other political-legal departments handle case information, investigation materials, and other sensitive data with high information security requirements. The shielding desk provides physical-level protection for case-handling computers, preventing case information from leaking through electromagnetic pathways and ensuring case work confidentiality.
7.2 Military and National Defense Research Scenarios
7.2.1 Military Research Institutes
Design and development workstations and data processing terminals in military research institutions involve core secrets including weapon systems and national defense technology, requiring extremely high electromagnetic protection levels. High-end type shielding desks comply with GJB military standards with shielding effectiveness reaching 85 dB or above, meeting Class II and above military confidentiality requirements and providing reliable electromagnetic protection for research terminals.
7.2.2 Military Command and Operations Rooms
Command terminals and data processing equipment in military command centers and operations duty rooms must simultaneously resist external electromagnetic interference and prevent internal information leakage. The shielding desk provides resistance to strong electromagnetic pulse interference, ensuring stable equipment operation in complex electromagnetic environments while preventing electromagnetic leakage of command information.
7.2.3 Military Laboratories and Test Workstations
Military electronic equipment testing, electromagnetic compatibility experiments, and similar scenarios require a clean electromagnetic environment to prevent external interference from affecting test accuracy while preventing test signal leakage. The shielding desk provides localized high-level shielding test environments, partially replacing the functions of large shielding rooms and reducing laboratory construction costs.
7.3 Financial and Commercial Confidentiality Scenarios
7.3.1 Bank Core Data Processing
Bank data center terminals, credit card centers, and risk control departments handle large volumes of customer information, transaction data, and financial secrets. Information leakage would cause significant economic losses and reputational damage. The shielding desk protects core operation terminals, preventing transaction data and customer privacy from being intercepted through electromagnetic radiation, meeting financial industry information security regulatory requirements.
7.3.2 Securities and Trading Institutions
Trading terminals and market analysis terminals at stock exchanges, fund companies, and investment institutions require extremely high data real-time performance and confidentiality. The shielding desk both prevents leakage of commercial secrets such as trading strategies and position data and resists external electromagnetic interference, ensuring stable trading system operation and preventing trading failures caused by interference.
7.3.3 Corporate Core R&D Departments
For high-tech enterprises, design institutes, and intellectual property departments, core R&D data, design drawings, and trade secrets are core corporate assets. The shielding desk protects R&D design workstations, preventing technical patents and design proposals from being obtained by competitors through electromagnetic eavesdropping, protecting corporate intellectual property and commercial secrets.
7.4 Industrial and Measurement/Control Scenarios
7.4.1 Industrial Control Terminals
Industrial PCs and PLC control terminals in factory automation production lines and smart manufacturing workshops operate in complex electromagnetic environments where variable frequency drives, motors, and welding equipment generate strong electromagnetic interference that can easily cause industrial control equipment crashes, data errors, and control failures. The shielding desk effectively isolates external interference, ensuring stable industrial control system operation and improving production continuity.
7.4.2 Precision Measurement and Inspection
In metrology, precision instrument testing, and semiconductor inspection scenarios, test instruments are highly sensitive to electromagnetic interference, where even minor interference affects measurement accuracy. The shielding desk provides a low electromagnetic noise working environment for precision instruments, improving measurement result accuracy and repeatability.
7.4.3 Power and Energy Measurement/Control
Measurement and control terminals and relay protection equipment at substations, power plants, and oil/gas fields operate in strong electromagnetic environments susceptible to electromagnetic interference from high-voltage and high-current equipment. Industrial-type shielding desks feature wide temperature range, dust resistance, and vibration resistance, adapting to harsh industrial field environments and ensuring reliable operation of power measurement and control equipment.
7.5 Medical, Scientific Research, and Educational Scenarios
7.5.1 Precision Medical Equipment
Around hospital MRI rooms, ECG monitoring rooms, and clinical laboratory equipment, electromagnetic interference can affect the accuracy of medical equipment detection and even cause misdiagnosis. The shielding desk is used to house medical data processing terminals, isolating electromagnetic interference and ensuring stable medical equipment operation.
7.5.2 University and Research Laboratories
Electronic information laboratories, physics laboratories, and classified research rooms in universities handle sensitive research data, and experimental equipment is susceptible to interference. The shielding desk can be used for experimental equipment protection and data processing, meeting the electromagnetic environment requirements of scientific research experiments and improving experimental data reliability.
7.5.3 Examination and Marking Centers
Marking and question-setting centers for the national college entrance examination, civil service examinations, and professional qualification examinations handle highly confidential examination content and candidate data. The shielding desk prevents electromagnetic information leakage during question-setting and marking processes, ensuring examination fairness and information security.
7.6 Other Special Scenarios
7.6.1 Data Center Operations Workstations
Operations terminals and commissioning workstations in data center equipment rooms operate in strong electromagnetic environments with dense equipment and severe electromagnetic interference. The shielding desk ensures stable operations terminal operation while preventing leakage of sensitive data during operations and maintenance activities.
7.6.2 Broadcasting and Studio Applications
Broadcasting and television station broadcasting equipment and editing terminals require high audio signal quality, where electromagnetic interference produces noise and distortion. The shielding desk isolates external electromagnetic interference, improving audio and video signal quality.
7.6.3 Emergency Command and Mobile Office Applications
Emergency command vehicles and mobile classified office scenarios have limited space and cannot accommodate large shielding rooms. The shielding desk can be rapidly deployed to form temporary classified office workstations, meeting information security protection requirements in emergency situations.
Chapter 8 Product Installation
The installation quality of the shielding desk directly affects its shielding performance, operational safety, and service life, and must be strictly executed in accordance with the standard procedures in this chapter. Installation work should be performed by professionals with electrical installation qualifications and electromagnetic shielding equipment installation experience. Before installation, carefully read this manual to understand the product structure and installation requirements, and prepare the corresponding tools and materials.
8.1 Pre-Installation Preparation
8.1.1 Installation Site Survey and Requirements
Prior to installation, the installation site must be surveyed to confirm compliance with the following requirements:
Floor Requirements: The floor must be flat and solid with a levelness error of ≤3 mm/m, capable of supporting the equipment weight (approximately 200 kg + internal equipment weight). The floor should be a hard surface such as concrete, tile, or anti-static flooring, avoiding soft or uneven floors. For raised anti-static floors, verify that the floor load-bearing capacity is adequate, and install load-supporting brackets under the equipment if necessary.
Space Requirements: Sufficient operating space must be reserved around the equipment installation position: ≥800 mm clearance in front for full door opening and equipment installation; ≥500 mm clearance at the rear for wiring and maintenance; ≥200 mm clearance on both sides for ventilation and cooling. There must be no obstruction above the equipment, with ≥300 mm clearance to the ceiling.
Environmental Requirements: The installation location must be at least 2 meters away from strong electromagnetic interference sources (such as high-power transformers, variable frequency drives, motors, and high-frequency equipment); away from water sources, heat sources, and flammable/explosive materials; ambient temperature and humidity must comply with the product operating environment requirements; avoid direct sunlight and rain exposure.
Power Requirements: A stable AC 220V/50Hz mains power supply must be available near the installation location, with power capacity meeting the total power requirements of the equipment, reliable power grounding, and standard grounding terminals.
Grounding Requirements: The site must have a qualified grounding system with grounding resistance ≤1 Ω, with grounding terminals positioned for convenient connection of the equipment grounding conductor. If the site has no dedicated grounding system, a separate grounding electrode must be constructed in advance.
8.1.2 Tool and Material Preparation
Prepare the following tools and materials before installation:
Installation Tools: Hex key set, Phillips/flat-head screwdrivers, adjustable wrench, pliers, wire strippers, crimping tools, spirit level, tape measure, marking pen, rubber mallet, and power drill (if floor fixing is required).
Testing Tools: Multimeter, megohmmeter, ground resistance tester, and feeler gauge (for seal adjustment).
Auxiliary Materials: Grounding cable (if shipped length is insufficient), copper lug terminals, insulating tape, cable ties, conductive paste, anti-rust paint, and expansion bolts (if floor fixing is required).
Protective Equipment: Work gloves, safety shoes, and anti-static wrist straps to ensure installer safety and equipment ESD protection.
8.1.3 Delivery Verification and Unpacking
After the equipment arrives at the site, perform unpacking verification against the product list in Chapter 3, checking the equipment appearance, accessory quantities, and documentation to confirm no damage or missing items.
Check the equipment for any impact damage, deformation, or paint chipping sustained during transport, with particular attention to key components including the shielding door, observation window, interface panels, and conductive gaskets.
After verification, move the equipment to a position near the installation location in preparation for positioning and installation. Protect the equipment during handling, avoiding collisions and excessive tilt angles.
8.2 Equipment Handling and Positioning
8.2.1 Handling Precautions
The shielding desk is heavy (approximately 180 kg for standard type). Handling must be performed by at least 4 adult personnel working together, or using handling equipment such as forklifts or hand trucks. Single-person handling is strictly prohibited.
Lifting points should be at the cabinet bottom reinforcement ribs or side frame. It is strictly prohibited to lift by the door handles, observation window, interface panels, or other weak points to prevent component deformation or damage.
Keep the cabinet upright during handling with a tilt angle not exceeding 15°. It is strictly prohibited to invert or lay the cabinet on its side to avoid displacement of internal components and deformation of conductive gaskets.
When going up/down steps or crossing thresholds, move slowly and steadily to avoid severe vibration and impacts that could cause cabinet deformation or weld cracking.
8.2.2 Positioning and Leveling Adjustment
Slowly move the equipment to the predetermined installation position, initially aligning orientation so the front faces the operating direction and the rear is near the power supply and grounding terminals.
Adjust the height of the four leveling feet, place the spirit level at the center of the work surface, measure levelness in both the front-to-rear and left-to-right directions, and make fine adjustments by rotating the leveling feet until the work surface is completely level with a levelness error of ≤2 mm/m.
After adjustment, ensure that all four leveling feet bear load evenly, the cabinet is stable without wobble, and the door opens and closes smoothly without binding. If the equipment is configured with casters, lock the caster brakes after positioning and extend the leveling feet to bear the load, preventing long-term caster damage from load.
If the equipment requires permanent fixing, secure it to the floor using expansion bolts through the bottom mounting holes. After fixing, recheck cabinet levelness to avoid cabinet deformation caused by the fixing process.
8.3 Grounding System Installation
Grounding system installation is a critical step for ensuring shielding performance and electrical safety and must be strictly executed per specifications. The equipment must not be energized if grounding is non-compliant.
8.3.1 Grounding Terminal Identification
The dedicated grounding terminal of the shielding desk is located at the rear of the cabinet bottom, comprising a copper M8 bolt terminal marked with the “grounding” label. All metal components of the cabinet are electrically connected through the structure; only the grounding conductor needs to be connected to this terminal.
8.3.2 Grounding Conductor Fabrication and Connection
Grounding Conductor Material: Use yellow/green dual-color stranded copper-core insulated wire with a cross-sectional area of ≥16 mm²; 25 mm² is recommended for high-level protection scenarios. Wire length is determined by the distance from the equipment to the grounding terminal, kept as short as possible to reduce grounding impedance.
Terminal Crimping: Strip approximately 10 mm of insulation from both ends of the grounding conductor, insert into copper lug terminals (cable lugs), and crimp firmly with a crimping tool to ensure secure contact. After crimping, tinning treatment may be applied to further reduce contact resistance.
Connection Procedure:
- Connect one end to the shielding desk grounding terminal, install spring washer and flat washer, and tighten with the nut to ensure close contact.
- Connect the other end to the building grounding grid or the grounding busbar of the dedicated grounding electrode, securing with bolts to ensure good conductivity.
Connection Requirements:
- The grounding conductor must be continuous and complete with no splices or break points in the middle;
- The grounding conductor should be routed separately and must not be bundled together with power or signal cables;
- Keep the grounding conductor away from high-voltage power lines to avoid induced interference;
- The grounding conductor path should be as short and straight as possible, minimizing bends to reduce high-frequency grounding impedance.
8.3.3 Grounding Resistance Testing
After grounding connections are complete, use a ground resistance tester to measure the grounding resistance between the equipment housing and earth.
Testing methods follow the ground resistance tester operating procedures, using the three-point or four-point method to ensure test accuracy.
Acceptance Standard: Grounding resistance ≤1 Ω; for high-level protection scenarios, ≤0.5 Ω. If grounding resistance does not meet the standard, check for loose or oxidized connection points, or rectify the grounding system until compliant.
8.4 Internal Equipment Installation
After the shielding desk is positioned and grounded, installation and securing of internal equipment can proceed. Internal equipment includes computer host units, monitors, printers, encryption machines, etc., which must be reasonably arranged and installed per specifications.
8.4.1 Equipment Layout Principles
Separation of High and Low Power: High-power equipment and low-power equipment should be placed separately as much as possible, with power cables and signal cables routed separately to reduce mutual interference.
Cooling Priority: High-heat-generating equipment (such as host power supplies and servers) should be placed near the air intake side with exhaust vents facing the air outlet direction to ensure smooth cooling airflow.
Operational Convenience: Frequently used equipment should be placed near the door and pull-out brackets for easy operation and maintenance; equipment that is rarely moved can be placed deeper inside or on shelves.
Weight Distribution: Equipment weight should be evenly distributed to avoid excessive localized loading that could deform brackets.
8.4.2 Monitor Installation
Open the shielding door, locate the monitor bracket on the inside of the observation window, loosen the bracket fixing screws, and adjust the bracket width and height according to the monitor dimensions.
Secure the monitor to the bracket and tighten the fixing screws to ensure the monitor is stable and does not wobble.
Adjust the monitor angle so the screen faces the center of the observation window with no obstruction and optimal viewing angle from the outside.
Connect the monitor power cable and signal cable, performing preliminary cable organization with appropriate length allowance to avoid strain.
8.4.3 Host Equipment Installation
Pull out the host unit pull-out bracket and place the computer host unit in the center of the bracket, adjusting position to center it.
Secure the host unit using the bracket’s retaining clips or cable ties to prevent equipment sliding or displacement.
Slowly push the bracket back into the compartment, confirming no binding and that cables are not pinched or strained.
For multi-level equipment, install on shelves sequentially. Shelf heights can be adjusted according to equipment dimensions to ensure stable placement.
8.4.4 Other Equipment Installation
Place printers, encryption machines, small switches, and other equipment on corresponding shelves or brackets and secure them properly.
Reserve sufficient cooling clearance when positioning equipment, maintaining ≥20 mm ventilation gaps between equipment units and between equipment and compartment walls.
After all equipment is installed, perform preliminary internal cable organization, securing cables to cable management racks with cable ties, keeping routing neat and avoiding cable blockage of ventilation openings.
8.5 Accessory Installation
8.5.1 Dust Filter Screen Installation
If the dust filter screens on the outside of the waveguide ventilation windows were not factory-installed, follow these steps:
- Locate the filter screen slots or retaining clips around the waveguide window perimeter.
- Align the dust filter screen with the waveguide window and insert it smoothly into the slots or fasten the clips.
- Check that the filter screen is installed flat, without wrinkles or gaps, fully covering the waveguide window ventilation area.
- Reverse the procedure for periodic filter replacement.
8.5.2 Label and Identification Sticker Application
Apply the supplied interface identification labels next to the corresponding external interfaces, clearly indicating interface type and purpose for convenient later wiring and maintenance.
Apply cable labels to both ends of each cable, indicating the equipment and interface to which the cable corresponds, facilitating fault diagnosis.
Apply warning labels in conspicuous positions on the equipment, such as “Only energize after shielding door is closed” and “Unauthorized drilling strictly prohibited.”
8.5.3 Optional Accessory Installation
If optional accessories such as casters, electronic locks, or temperature control modules were purchased, install and commission them according to the corresponding accessory installation instructions, ensuring secure installation and proper functionality.
8.6 Post-Installation Preliminary Inspection
After installation is complete, perform the following preliminary inspections to confirm installation quality:
Structural Inspection: Cabinet is stable without wobble, levelness meets standards; door opens and closes smoothly, locking mechanism operates normally, door seam is uniform when closed.
Grounding Inspection: Grounding connections are secure, grounding resistance tests pass.
Internal Inspection: Equipment is securely installed, cables are preliminarily organized, no loose or pinched cables, ventilation openings are unobstructed.
Appearance Inspection: Equipment appearance is free of damage, coating is intact, all accessories are present.
Safety Inspection: No exposed live parts; installation tools and debris have been removed from the shielding cavity.
After the preliminary inspection passes, wiring operations can proceed to the next stage.
Chapter 9 Product Wiring
Wiring of the shielding desk is a critical step for ensuring normal equipment operation and shielding performance. Non-compliant wiring can not only prevent the equipment from functioning properly but can also cause electromagnetic leakage, electrical short circuits, and other safety hazards. All wiring work must be performed with power disconnected, by certified electricians or professional technical personnel, strictly complying with electrical safety regulations.
9.1 Basic Wiring Principles
9.1.1 Safety First Principle
De-energized Operation: The external main power supply must be disconnected before wiring, and work may only proceed after confirming zero voltage. Wiring while energized is strictly prohibited.
ESD Protection: Wear anti-static wrist straps to discharge body static before contacting internal precision equipment and interfaces, preventing static damage to equipment.
Insulation Protection: All exposed conductors must receive insulation treatment. Wiring terminals must not be exposed to prevent short circuits and electric shock.
Standardized Operation: Use qualified tools and operate in accordance with electrical wiring codes. Sloppy workmanship, loose connections, and fake connections are strictly prohibited.
9.1.2 Shielding Compliance Principle
All Cables Must Pass Through Filters: Any power or signal cable entering or exiting the shielding cavity must pass through the corresponding filter interface. Direct drilling through the cabinet for cable routing and bypassing filters are strictly prohibited.
Input/Output Separation: Filter input and output wires must be routed separately with a spacing of ≥300 mm. Parallel bundling and cross-winding are strictly prohibited to prevent signal coupling bypass that would reduce filtering effectiveness.
Shield Layer Grounding: The shield layer of shielded cables should be grounded at one end only, with the grounding end connected to the shielding cabinet side to avoid ground loop formation.
Aperture Sealing: Cable gland fittings at cable entry points must be tightened to ensure sealing performance and prevent aperture leakage.
9.1.3 Workmanship Standard Principle
Secure Connections: All wiring terminals must be securely crimped or plugged with no looseness or false connections, and contact resistance must meet requirements.
Neat Routing: Cables should be routed straight and orderly, with high and low power separated, bundling per specifications, and clear labeling.
Length Allowance: Reserve appropriate cable length allowance at both ends to facilitate equipment movement and maintenance, avoiding strain from pulling.
Clear Labeling: Labels should be applied to both ends of all cables indicating purpose and routing to facilitate later operations and maintenance.
Chapter 9 Wiring (continued)
9.2 Power Circuit Wiring
9.2.1 External Power Input Wiring
Power confirmation: Confirm that the external mains supply is AC220V/50Hz, voltage fluctuation is within the allowable range, and the power supply ground is reliable.
Connection method: The power input interface of the shielding desk is located at the rear of the cabinet, available in two forms: a standard three-prong power socket or a wiring terminal block.
If socket type: Insert one end of the supplied power cord into the equipment power input socket, and the other end into the external mains socket, ensuring a firm, fully seated connection.
If terminal block type: Open the terminal protective cover, connect the external power cord’s live wire (L), neutral wire (N), and ground wire (PE) to the corresponding terminals respectively, tighten the fixing screws, pull-test to confirm no loosening, then close the protective cover.
Wiring requirements:
- Live wire, neutral wire, and ground wire must correspond correctly; reversing connections is strictly prohibited;
- The power cord cross-sectional area shall be selected based on total power, ≥ 2.5mm² copper core wire;
- An independent air circuit breaker is recommended for the power input circuit to facilitate maintenance and power-off protection.
9.2.2 Internal Power Wiring
- Confirm that the internal PDU sockets are correctly connected to the power filter output end (factory-connected; no modification is needed unless special circumstances exist).
- Insert the power cords of internal equipment into the PDU sockets in sequence, paying attention to load balancing to avoid single-circuit overload.
- Neatly bundle and organize equipment power cords along the cable management brackets on the cabinet side walls, keeping them away from signal cables and avoiding crossover.
- Check that all power plugs are firmly inserted, without looseness or poor contact, and that cables show no signs of crushing or damage.
9.2.3 Fan Power Wiring
- The cooling fan power supply is factory-wired to the internal control circuit; no modification is needed under normal use.
- If fan inspection or replacement is required, connect according to the wiring labels, paying attention to fan polarity to avoid reverse rotation.
- For temperature-controlled models, connect the temperature sensor wiring to the temperature control module according to the labels. Position the sensor probe near heat-generating equipment in the center of the chamber to accurately reflect internal temperature.
9.3 Signal Circuit Wiring
Signal cables are of various types and must be connected according to interface types to ensure normal signal transmission without compromising shielding performance.
9.3.1 USB Interface Wiring
- Internal connection: Use a USB data cable to connect one end to the computer host’s USB port and the other end to the USB filter internal port on the inner side of the shielding chamber, ensuring a firm, fully seated connection. Multiple USB devices can be connected based on equipment quantity, such as keyboards, mice, dongles, USB flash drives, etc.
- External connection: External USB devices (such as external keyboards, mice, mobile hard drives, etc.) can be used by inserting their USB plugs into the corresponding USB filter external ports on the outside of the cabinet.
Precautions:
- USB 3.0 devices must be connected to USB 3.0 filter ports, otherwise transmission speed will be affected;
- Avoid USB port overload; it is recommended that high-power external devices use an external power supply;
- Front ports are for common peripherals; rear ports are for permanently connected devices.
9.3.2 Network Interface Wiring
- Internal connection: Use a network cable to connect one end to the computer host’s network card port and the other end to the network filter internal port on the inner side of the shielding chamber. Confirm a secure connection when you hear a click.
- External connection: Connect the external LAN cable to the network filter external port on the outside of the cabinet to access the internal network.
Fiber optic interface wiring (high-end models):
- Internal: Connect the equipment network cable to the optical transceiver’s network port inside the chamber; connect the optical transceiver power supply to the internal PDU;
- External: Connect the external fiber optic cable to the fiber optic waveguide port, then connect to the external optical transceiver for optical-electrical conversion and transmission;
- Note: The fiber optic cable bending radius must be ≥ 30mm to avoid fiber breakage.
Precautions:
- Use Category 5e or Category 6 shielded network cables to improve anti-interference capability;
- Keep network cable lengths moderate to avoid signal attenuation from excessive length;
- Ensure proper crimping of RJ45 connectors, correct wire sequence, and good contact.
9.3.3 Video Interface Wiring
- Internal connection: Use a VGA/HDMI video cable to connect one end to the computer host’s video output port and the other end to the video filter internal port inside the chamber, tightening the fixing screws.
- External connection: If an external display device is required, connect one end of the external video cable to the external monitor and the other end to the video filter external port on the outside of the cabinet.
Precautions:
- Video cables must have shielding to avoid video signal interference;
- Tighten and secure connections to prevent loose contact causing screen flickering;
- Avoid running video cables parallel to power cables to reduce interference.
9.3.4 Telephone Interface Wiring
- Internal connection: Connect one end of the telephone line to the telephone or fax machine inside the chamber, and the other end to the telephone filter internal port.
- External connection: Connect the external carrier telephone line to the telephone filter external port.
Precautions:
- Avoid routing telephone lines along the same path as strong-current lines;
- Note telephone line polarity; some devices will not function properly if polarity is reversed.
9.3.5 Other Signal Interface Wiring
For serial ports, audio, dedicated control signal, and other interfaces, connect internal and external ends correspondingly according to the labels, following the general principles of “filtered connection, separation of strong and weak currents, and clear labeling.” For specially customized interfaces, connect according to the wiring diagrams provided by the manufacturer.
9.4 Internal Wiring Standards
Internal wiring quality directly affects equipment heat dissipation, electromagnetic interference, and subsequent maintenance, and must strictly comply with the following standards:
- Separation of strong and weak currents: Power cables and signal cables shall be routed on separate sides with a spacing of ≥ 200mm. When crossing is unavoidable, use 90° perpendicular crossing to reduce electromagnetic coupling.
- Straight and neat routing: Cables shall be routed along cable management brackets and corners, level and vertical, avoiding random pulling and tangled mess.
- Binding and fixation standards:
- Use nylon cable ties for binding, with one binding point every 300–500mm;
- Apply moderate binding force; cables shall not be loose or deformed; trim tie tails flush to avoid sharp edges;
- Different types of cables shall be bound separately, not mixed together.
- Cable labeling: Each cable shall have labels at both ends indicating the cable name, routing direction, and connected equipment. Labels shall be clearly printed and firmly affixed.
- Avoidance principle: Cables shall avoid heat-generating components, moving parts, and sharp edges to prevent high-temperature aging and abrasion damage.
- Reserve slack: Reserve 100–200mm of slack at equipment ends for easy drawer pull-out and maintenance. The slack portion shall be coiled neatly and secured with cable ties.
9.5 Post-Wiring Inspection
After all wiring is completed, perform inspections according to the following steps. Only proceed with power-on commissioning after confirming the wiring is correct:
- Continuity check: Use the continuity mode of a multimeter to test the conduction of each circuit, confirming no open circuits or poor contacts.
- Insulation check: Use a megger to test the insulation resistance between power lines and the cabinet body. Pass criterion: ≥ 100MΩ. Confirm no short-circuit or leakage hazards.
- Correspondence check: Verify against the wiring diagram and labels that internal and external ports correspond one-to-one, with no misconnections or crossovers.
- Secure connection check: Check each terminal and plug one by one, confirming firm connections without looseness.
- Shielding compliance check: Confirm that all cables are connected through filters, with no direct through-hole wiring; filter input and output lines are separated; cable pass-through holes are properly sealed.
- Safety check: No exposed live parts, neat wiring without clutter, tools and debris cleaned up, and the shielding door closes normally.
Only after all inspections pass may the equipment proceed to the power-on commissioning stage.
Chapter 10 Product Commissioning
After the shielding desk installation and wiring are completed, system commissioning is required to verify that all equipment functions are normal, shielding performance meets standards, and operating status is stable. Commissioning shall be carried out in an orderly manner: first no-load then loaded, first partial then overall, with step-by-step verification to ensure safety.
10.1 Pre-Commissioning Preparation
10.1.1 Commissioning Tools and Instruments
Prepare the following tools and instruments:
- Multimeter, megger, clamp ammeter;
- Ground resistance tester;
- Thermometer, sound level meter;
- Near-field electromagnetic probe, spectrum analyzer (for shielding effectiveness testing);
- Laptop computer, network cables, and other test equipment;
- Notebook and pen for recording commissioning data.
10.1.2 Safety Confirmation
- Re-confirm that all wiring is correct, without short circuits or reversed connections.
- Confirm that there are no leftover tools, screws, cable ends, or other debris inside the shielding chamber to prevent short circuits or equipment damage after power-on.
- Confirm that the shielding door can close and lock properly, and that the conductive gasket has no foreign objects or damage.
- Confirm that the grounding system is reliably connected and ground resistance meets requirements.
- Commissioning personnel shall wear insulated gloves and take proper electrical safety precautions.
10.2 Static Tests Before Power-On
10.2.1 Insulation Resistance Test
- Turn off the main power switch of the equipment and unplug the external power plug.
- Use a 500V megger to measure the insulation resistance between the live/neutral wires of the power input and the cabinet enclosure.
- Pass criterion: Insulation resistance ≥ 100MΩ. If insulation resistance is too low, investigate whether the wiring is damaged, damp, or contacting the enclosure, then retest after resolving the issue.
10.2.2 Ground Continuity Test
- Use the low-resistance range of a multimeter to measure the resistance between various parts of the cabinet (such as tabletop metal parts, door body, interface panels, shielding glass frames) and the ground terminal.
- Pass criterion: Resistance between each part and the ground terminal ≤ 0.1Ω, indicating good conductive continuity of the cabinet.
- If resistance at a certain part is too high, check for insulating coatings at connection points, loose screws, contact oxidation, and similar issues, then retest after treatment.
10.2.3 Door Seal Inspection
- Close the shielding door, lock the handle, and use a 0.1mm feeler gauge to insert along the entire door seam perimeter.
- Pass criterion: The feeler gauge cannot be inserted, or insertion depth ≤ 5mm, indicating good gasket compression and uniform gaps.
- If local gaps are excessive, adjust the hinge position or locking mechanism pressure until the seal is uniform.
- Visually inspect the conductive gasket’s contact with the door frame for gaps, breaks, or foreign objects.
10.3 No-Load Power-On Commissioning
No-load commissioning means testing the basic electrical functions of the shielding desk without turning on internal equipment, only connecting the shielding desk’s own power supply.
10.3.1 Power-On Test
- Turn off all internal equipment power switches, the shielding desk main power switch, and the fan switch.
- Insert the external power plug and close the external power supply switch.
- Press the shielding desk main power switch and observe whether the power indicator lights up, and whether there are any abnormal conditions such as strange noises, odors, or smoke.
- If any abnormality occurs, immediately cut off power, investigate the cause, and only re-energize after the fault is eliminated.
10.3.2 Fan Function Commissioning
- Press the fan control switch and observe whether the fan starts and runs, listening for smooth operation without abnormal noise or rattling.
- Feel the airflow at the air outlet window to confirm correct fan rotation direction and normal airflow output.
- Test the fan switch control function, verifying normal start/stop operation.
- For intelligent temperature-controlled models: set the temperature threshold, use a heat gun to simulate temperature rise, and verify that the fan automatically starts when the temperature reaches the upper limit and automatically stops when the temperature drops. The temperature control function should operate normally, and the threshold should be accurate.
10.3.3 No-Load Voltage and Current Test
- Use a multimeter to measure the output voltage at the power filter output end, confirming that the voltage is stable within the AC220V ± 10% range.
- Use a clamp ammeter to measure the total input current. Under no-load conditions, the current should be very small (only standby and fan current), with no abnormal excessive values.
- Test the residual current device (RCD) function: press the test button, and the RCD should trip immediately, cutting off power, indicating normal leakage protection function. Reset after testing.
10.3.4 Interface Continuity Test
- Use a multimeter to test the continuity of each signal interface, confirming normal pathways without open or short circuits.
- Test USB ports by inserting a USB flash drive to confirm proper recognition; test network ports by connecting a network cable to test equipment to confirm normal link status.
10.4 Loaded Functional Commissioning
After no-load commissioning is normal, turn on internal equipment for loaded commissioning to verify overall system operation.
10.4.1 Equipment Startup Test
- Turn on the power for internal computers, monitors, and other equipment in sequence, observing whether the equipment starts normally without abnormalities.
- Test peripheral functions: keyboard and mouse operation normal, display picture clear, network connection normal, data transmission stable.
- Run continuously for 30 minutes, observing equipment operating status for abnormal phenomena such as crashes, restarts, screen flickering, or network disconnections.
10.4.2 Heat Dissipation Performance Test
- After 30 minutes of full-load operation, use a thermometer to measure temperatures at different positions inside the chamber: air inlet temperature, air outlet temperature, equipment surface temperature, and average chamber temperature.
- Calculate the temperature difference to evaluate heat dissipation effectiveness. Under normal conditions: temperature difference between outlet and inlet ≤ 10°C, maximum chamber temperature ≤ 40°C (at an ambient temperature of 25°C).
- If temperatures are too high, check whether the airflow path is blocked, the fan is faulty, or equipment load is excessive, and make targeted adjustments.
10.4.3 Signal Transmission Test
- Network test: Use a network tester to measure network transmission rate and packet loss rate. Gigabit networks should achieve the rated speed with a packet loss rate of 0, confirming that filter ports do not affect network performance.
- Video test: Play high-definition video and observe whether the picture is clear, without flickering or streak interference, confirming good video filtering effectiveness.
- USB test: Perform file read/write tests to confirm normal USB transfer rates without interruptions or errors.
- Anti-interference test: Turn on interference sources such as a hair dryer or mobile phone near the equipment and observe whether internal equipment operates stably, confirming effective anti-interference functionality.
10.4.4 Noise Test
- Use a sound level meter to measure equipment operating noise at a distance of 1 meter from the front of the equipment, confirming ≤ 35dB, meeting office environment noise requirements. If noise is excessive, check for loose fan mounting or resonance and apply vibration damping treatment.
10.5 Shielding Effectiveness Commissioning and Verification
Shielding effectiveness is the core performance indicator of the shielding desk. During commissioning, it is necessary to verify whether shielding performance meets standards. A simple near-field test method can be used; precise testing must be carried out by a third-party professional institution.
10.5.1 Simple Near-Field Test Method
Test preparation: Spectrum analyzer with near-field probe, or a dedicated electromagnetic radiation tester; place a normally operating computer inside as a radiation source.
Test steps:
1. First, with the shielding door open, measure the radiation field strength at a distance of 30cm from the cabinet and record the baseline value;
2. Close and lock the shielding door, measure the field strength at the same position again, and record the value after shielding;
3. Calculate the difference between the two values to obtain the simple shielding effectiveness value;
4. Focus on testing easily leak-prone areas such as door seams, observation windows, interface panels, and ventilation windows, comparing field strength at different positions.
Result determination: Overall shielding effectiveness should reach the product’s stated specification, with no obvious abnormal leak points at critical areas. If there is severe leakage at a certain location, investigate and resolve the cause.
10.5.2 Common Leak Point Investigation and Treatment
Door seam leakage:
- Cause: Conductive gasket dirty or worn, door body deformation, insufficient locking pressure;
- Treatment: Clean the contact surfaces of the gasket and door frame, adjust locking mechanism pressure, and replace the gasket if severely worn.
Observation window leakage:
- Cause: Poor contact between the shielding glass wire mesh and frame, damage to the conductive layer at the glass edge;
- Treatment: Re-compress the contact edge, repair the conductive layer, and replace the shielding glass if necessary.
Interface area leakage:
- Cause: Poor grounding of the filter housing, ungrounded cable shielding layer, loose interface connections;
- Treatment: Tighten filter mounting screws, ensure good grounding, and correctly connect cable shielding layers.
Ventilation window leakage:
- Cause: Poor contact between the waveguide window and cabinet, deformed or blocked waveguide openings;
- Treatment: Reinforce waveguide window installation, ensure conductive continuity, and repair deformed waveguides.
Hole leakage:
- Cause: Unsealed extra openings, unsealed cable pass-through holes;
- Treatment: Block excess holes with metal blanking plates, tighten cable glands to ensure sealing.
10.5.3 Third-Party Authoritative Testing
If the project requires formal acceptance or confidentiality evaluation, a third-party authoritative institution such as the National Secret-Related Equipment Testing Center may be commissioned to conduct professional shielding effectiveness testing in accordance with the GB/T 12190-2021 standard and issue a formal test report. Our company can assist in contacting testing institutions and cooperate in completing the testing work.
10.6 Overall System Integration Testing
After all individual commissioning items are completed, proceed with overall continuous operation integration testing:
- All equipment shall operate continuously at full load for 24 hours, simulating real usage scenarios.
- Record chamber temperature, voltage/current, and equipment operating status data every 2 hours.
- After 24 hours, if the equipment has no faults, no abnormal alarms, temperature remains stable within normal range, and all functions operate normally, commissioning is deemed qualified.
- If abnormalities occur during operation, stop the equipment, investigate and resolve, then restart integration testing until continuous stable operation is achieved.
10.7 Commissioning Wrap-Up
- Compile commissioning records and fill in the commissioning report, documenting all test data and results.
- Clean up commissioning tools and on-site debris, keeping the equipment and site tidy.
- Provide simple operation training to operators, explaining daily usage methods and precautions.
- After confirming commissioning qualifies, proceed to the acceptance stage.
Chapter 11 Product Precautions
To ensure the shielding performance, operational safety, and service life of the shielding desk, operators and managers must strictly comply with all precautions listed in this chapter. Non-compliant operations may result in reduced shielding performance, equipment damage, or even safety accidents.
11.1 Usage Safety Precautions
11.1.1 Electrical Safety
- It is strictly prohibited to open the shielding door to perform internal wiring or maintenance while powered. The main power must be disconnected, the power plug removed, and power-off confirmed before any operation.
- It is strictly prohibited to operate power switches or plug/unplug power cords with wet hands to prevent electric shock.
- Equipment power must be reliably grounded. Operating without proper grounding is strictly prohibited. Periodically check that the grounding connection is secure.
- Overload use is strictly prohibited. The total internal load shall not exceed the product’s rated power to prevent fire caused by overload.
- If power lines show damage, aging, or exposed conductors, power off and replace them immediately. Operation with faulty lines is strictly prohibited.
- If abnormal conditions such as smoke, strange noises, or odors occur, immediately power off the equipment and investigate the fault. Forced power-on is prohibited.
- Equipment cleaning must be done with power off. Direct rinsing with water is strictly prohibited. A dry cloth or a small amount of neutral cleaner may be used for wiping.
11.1.2 Mechanical Safety
- Open and close the shielding door gently. Forceful impacts or violent pushing/pulling are strictly prohibited to prevent door deformation and gasket damage.
- Standing or stepping on the tabletop is strictly prohibited. Placing overweight items is strictly prohibited to prevent tabletop deformation and structural damage.
- Pulling, hitting, or impacting the observation window is strictly prohibited to prevent shielding glass breakage and personal injury.
- Equipment must be powered off before moving. Cables should be organized, and multiple personnel should coordinate for stable handling to avoid tipping.
- It is strictly prohibited to insert fingers or objects into ventilation windows, gaps, or other openings to prevent pinching or fan blade entanglement.
- Children and unauthorized personnel are prohibited from operating the equipment to prevent safety accidents.
11.2 Shielding Performance Protection Precautions
11.2.1 Structural Shielding Protection
- It is strictly prohibited to arbitrarily drill, punch, or weld on the shielding cabinet. Any action that compromises the integrity of the shielding chamber will cause severe electromagnetic leakage and render the shielding performance ineffective. If opening/modification is truly necessary, contact the manufacturer, and have professional personnel handle it using a shielded sealing solution.
- It is strictly prohibited to damage the shielding door conductive gasket. Avoid scratching, squeezing, or pressing the gasket with sharp objects; periodically clean the gasket surface to maintain conductive performance.
- After closing the shielding door, it must be locked into place to ensure uniform compression of the conductive gasket. Operating with the door ajar is strictly prohibited.
- Striking or impacting the cabinet is strictly prohibited to prevent deformation causing seam leakage.
- Do not attach non-conductive stickers or films to the shielding glass surface. Scratching with sharp objects is prohibited to prevent damage to the shielding wire mesh layer.
11.2.2 Interface and Cable Standards
- All cables entering and exiting the shielding chamber must be routed through dedicated filter interfaces. Direct through-hole wiring and bypassing filters are strictly prohibited.
- Unauthorized modification or disassembly of filters is strictly prohibited. If a filter is damaged, contact the manufacturer to replace it with the identical model.
- Filter input and output lines must be routed separately. Parallel routing and intertwining are strictly prohibited to avoid coupling bypass and reduced filtering effectiveness.
- Unused idle ports should be covered with dust caps to keep ports clean and prevent dust and foreign objects from entering.
- When plugging/unplugging connectors, align and insert properly. Violent insertion/removal is strictly prohibited to prevent bent or damaged pins.
- Cable pass-through hole sealing glands must be tightened. Idle pass-through holes must be capped with metal plugs and must not be left open.
11.2.3 Ventilation and Heat Dissipation Protection
- Blocking the waveguide ventilation windows is strictly prohibited. Sufficient ventilation space must be reserved around the equipment, and no items shall be stacked within 30cm of ventilation openings.
- Do not disassemble or cover the dust filter. Clean and replace the filter periodically to prevent dust blockage from affecting heat dissipation.
- Internal equipment placement shall not block ventilation openings. Sufficient heat dissipation clearance must be reserved to avoid localized heat buildup.
- Covering the equipment with cloth, paper, or other flammable materials is strictly prohibited to prevent fire hazards and heat dissipation issues.
- Repair or replace the cooling fan promptly when it malfunctions. Prolonged equipment use with a faulty fan is prohibited to avoid internal overheating and equipment damage.
11.3 Daily Usage Precautions
- Equipment power-on sequence: First turn on the main power, then the fan, and finally the internal equipment. The power-off sequence is reversed: first turn off internal equipment, then the fan, and finally the main power.
- When the equipment is not used for an extended period, turn off the main power and unplug the power cord to save energy and ensure safety.
- Keep the equipment usage environment clean and dry. Avoid using the equipment in humid, dusty, or corrosive gas environments to prevent component corrosion and reduced conductivity.
- Avoid placing water cups or liquids on the tabletop to prevent liquid spills from entering the equipment and causing short circuits or corrosion.
- Periodically check equipment operating status and address abnormalities promptly. Minor faults left unaddressed can lead to major problems.
- It is strictly prohibited to store flammable, explosive, or corrosive items inside the equipment. No debris shall be stacked inside.
11.4 Transportation and Storage Precautions
- Equipment must be transported using its original packaging with adequate cushioning protection, avoiding severe vibration, impact, and rain exposure.
- Keep the equipment upright during transport with a tilt angle not exceeding 15°. Inverting or laying it on its side is strictly prohibited.
- For long-term storage, the equipment shall be placed in a dry, well-ventilated warehouse free of corrosive gases, at a temperature of −20°C to 60°C, humidity ≤ 80%, with no condensation.
- Before storage, clean the equipment surface, cover with a dust cover, and periodically energize to remove moisture and prevent internal dampness and corrosion.
- Conduct periodic inspections during storage; treat any moisture or corrosion promptly.
11.5 Repair and Renovation Precautions
- When equipment malfunctions, contact the manufacturer’s after-sales service first and have professional personnel perform repairs. Unauthorized disassembly and repair by non-professionals is strictly prohibited, especially for shielding structures and filter components.
- When replacing parts, original manufacturer parts of identical specifications must be used, especially core shielding components such as conductive gaskets and filters. Use of inferior substitutes is strictly prohibited to avoid affecting shielding performance.
- Renovation, upgrades, and interface additions must be completed by the manufacturer or authorized service providers to ensure shielding performance is not compromised.
- After repairs, shielding effectiveness must be re-tested to confirm performance meets standards before the equipment is returned to service.
- Unauthorized disassembly and repair during the warranty period will void the warranty.
Chapter 12 Product Maintenance and Service
Scientific and standardized maintenance and service are key to maintaining stable shielding desk performance and extending service life. Establishing a comprehensive routine maintenance system with periodic inspection, cleaning, adjustment, and replacement of wear parts can effectively reduce the failure rate, ensure long-term stable operation, and maintain shielding performance without degradation.
12.1 Maintenance System
Maintenance of the shielding desk is organized into a four-level system: daily inspection, monthly maintenance, quarterly maintenance, and annual maintenance. The maintenance content and cycles for each level are as follows:
| Maintenance Level | Cycle | Personnel | Core Content |
|---|---|---|---|
| Daily Inspection | Daily | User | Appearance check, status check, simple cleaning |
| Monthly Maintenance | Monthly | Operations personnel | Cleaning and dust removal, connection tightening, functional checks |
| Quarterly Maintenance | Quarterly | Operations personnel | Deep cleaning, performance checks, wear part inspection |
| Annual Maintenance | Yearly | Manufacturer/Professionals | Comprehensive testing, shielding effectiveness test, wear part replacement, deep maintenance |
12.2 Daily Inspection (Daily)
Equipment users perform simple inspections before power-on and after power-off each day, including:
- Appearance check: Check the equipment exterior for dents, paint peeling, or deformation; check the shielding door and observation window for damage.
- Status check: Check whether the power indicator and fan operation are normal, and whether there are any abnormal noises or odors.
- Cleaning and dust removal: Wipe dust from the tabletop and cabinet surfaces with a dry cloth to maintain cleanliness.
- Surrounding area check: Check whether ventilation openings are blocked and whether there are debris or liquid hazards in the surrounding area.
- Record and report: Record and report any abnormalities to operations personnel promptly.
12.3 Monthly Maintenance (Monthly)
Performed once per month by the unit’s operations personnel, as follows:
12.3.1 Cleaning and Dust Removal
- With power off, use a clean soft cloth to wipe dust from both internal and external cabinet surfaces and remove stains.
- Clean dust from the dust filter. Compressed air may be blown from the inside out, or the filter may be rinsed with clean water and air-dried before reinstallation.
- Clean dust from internal equipment surfaces, organize internal cables, and maintain neatness.
- Clean the conductive gasket surface: Use an alcohol-moistened lint-free cloth to gently wipe the contact surfaces of the gasket and door frame, removing dust and oil, and allow to dry before closing the door. Note: Use alcohol sparingly to avoid seepage into internal components and damage.
12.3.2 Tightening Inspection
- Check the screws on door hinges and locking mechanisms; tighten any that are loose, ensuring smooth door operation and secure locking.
- Check whether the ground terminal connection is secure, without oxidation or looseness; retighten once.
- Check all interface plugs and power plugs to ensure firm connections without looseness.
- Check whether internal equipment is securely mounted and whether bracket and shelf screws are loose.
12.3.3 Functional Checks
- Test the main power switch and fan switch for normal operation; verify indicator lights display correctly.
- Test the residual current device function by pressing the test button to confirm normal tripping.
- Spot-check interface functions; verify USB, network, video, and other interfaces work normally.
- Listen to fan operating sounds to check for abnormal noise or rattling.
12.4 Quarterly Maintenance (Quarterly)
Deep maintenance is performed once per quarter, adding the following items to the monthly maintenance scope:
12.4.1 Deep Cleaning
- Open the shielding door and thoroughly clean all corners of the chamber interior, removing accumulated dust and debris.
- Clean the waveguide ventilation windows, blowing dust out of honeycomb openings with compressed air to maintain smooth airflow.
- Clean dust from fan blades and housings to prevent dust accumulation from affecting airflow and dynamic balance.
- Clean dust from connector socket interiors. An alcohol-dampened cotton swab may be used for gentle wiping, then allow to dry before use.
12.4.2 Performance Checks
- Ground resistance test: Use a ground resistance tester to measure ground resistance, confirming ≤ 1Ω. If not compliant, investigate and rectify.
- Insulation resistance test: Measure insulation resistance between power and enclosure, confirming ≥ 100MΩ.
- Temperature test: After 1 hour of full-load operation, measure the chamber temperature to evaluate whether heat dissipation performance is normal.
- Door seal inspection: Use a feeler gauge to check door gap sealing; inspect the conductive gasket for wear, deformation, cracking, and confirm good elasticity.
- Cable inspection: Check all cables for damage, aging, or crushing; verify binding is secure and labels are clear.
12.4.3 Lubrication and Protection
- Apply a small amount of lubricating grease to door hinges and lock mechanism moving parts to ensure smooth operation and reduce wear. Note: Lubricant must not contaminate the conductive gasket.
- For lightly corroded exposed metal areas, remove rust and apply anti-rust oil or conductive grease to prevent corrosion from spreading.
- Inspect the surface coating; touch up small areas of paint peeling with matching color paint to prevent rust from spreading.
12.5 Annual Maintenance (Yearly)
Annual maintenance is recommended to be performed by the manufacturer’s after-sales professionals for comprehensive deep maintenance. Core content includes:
12.5.1 Comprehensive Performance Testing
- Conduct comprehensive performance testing of the equipment according to factory inspection standards, including electrical performance, mechanical performance, and heat dissipation performance.
- Perform shielding effectiveness testing to evaluate the current shielding performance status and confirm compliance; if shielding effectiveness has declined, identify and repair leak points.
- Test filter performance to verify insertion loss; replace severely aged filters.
- Test fan speed, airflow, and noise to evaluate fan condition; perform maintenance or replacement if performance has declined.
12.5.2 Wear Part Replacement
Replace wear parts that have reached service life based on inspection results:
- Conductive gasket: Replace every 3–5 years under normal use; replace earlier if severely worn or shielding effectiveness has declined.
- Dust filter: Replace annually; shorten the replacement cycle in heavily polluted environments.
- Cooling fan: Service life is approximately 3–5 years; replace when noise increases or airflow decreases.
- Switches and indicator lights: Replace promptly if damaged or malfunctioning.
- Other wear parts: Locks, hinge accessories, sealing parts, etc., replace according to wear condition.
12.5.3 Deep Maintenance
- Retighten all electrical connection points and apply conductive grease to reduce contact resistance.
- Clean all conductive mating surfaces of the cabinet to improve conductive continuity.
- Organize internal wiring, replace aged or damaged cables, and optimize wiring layout.
- Perform comprehensive lubrication and adjustment of mechanical moving parts to restore optimal condition.
- Clean dust from the interior of power filters and interface modules to ensure stable performance.
12.5.4 Maintenance Report
After annual maintenance is completed, issue a formal equipment maintenance report recording test data, replaced components, performance status, existing issues, and improvement recommendations. Establish an equipment maintenance file to provide a basis for subsequent operations and maintenance.
12.6 Repair Management Standards
12.6.1 Fault Reporting Procedure
1. When an equipment fault occurs, the user shall immediately stop the equipment, record the fault symptoms, and report to the operations/maintenance department.
2. Operations personnel conduct a preliminary investigation; simple faults are handled on-site; for complex faults, contact the manufacturer’s after-sales service with a detailed description of the fault symptoms, equipment model, and usage environment.
3. Manufacturer technical personnel provide remote guidance for troubleshooting; if the issue cannot be resolved remotely, arrange for on-site repair.
4. After repair is completed, verify equipment function and shielding performance, confirm normal operation, then return the equipment to service and complete the repair record.
12.6.2 Repair Safety Standards
- Power must be disconnected before repair work, and a “Maintenance in Progress – Do Not Close” warning sign shall be displayed to ensure repair safety.
- Repair personnel shall wear anti-static wrist straps to prevent static damage to electronic components.
- Disassembled parts shall be placed in order and labeled to avoid incorrect reassembly.
- After repairs involving shielding structures, shielding effectiveness must be tested and confirmed to meet standards before the equipment is returned to service.
- Replacement parts must be original manufacturer genuine parts. Use of inferior substitutes is strictly prohibited.
12.6.3 Common Repair Operation Standards
Conductive gasket replacement:
- Remove the old gasket and clean residual adhesive and dust from the slot;
- Cut the new gasket to accurate dimensions, with 45° mitered joints at connection points, close-fitting with no gaps;
- Secure firmly by adhesive or clip mounting, smooth and wrinkle-free;
- After replacement, test door gap sealing and shielding effectiveness.
Fan replacement:
- After power-off, remove the old fan and disconnect the power connector;
- Connect the new fan with correct wiring, noting polarity, and ensure the airflow direction is correct;
- Secure firmly with proper vibration damping to avoid operational resonance.
Filter replacement:
- After power-off, remove the old filter wiring and mark the connections;
- Ensure the new filter housing is reliably connected to the cabinet, providing conductive grounding;
- Connect input and output lines correspondingly, route them separately, and avoid crossover;
- After replacement, test interface function and shielding performance.
12.7 Long-Term Idle Maintenance
When the equipment is expected to be idle for more than 1 month, perform idle maintenance according to the following requirements:
- Clean the equipment inside and out, removing dust and stains. Place desiccant inside the chamber to prevent moisture.
- Turn off the main power, unplug the power cord, and organize and secure cables.
- Close and lock the shielding door, and cover with a dust cover to prevent dust entry.
- Energize the equipment once per month for 30 minutes of operation to eliminate moisture and prevent internal component corrosion.
- Before re-commissioning, conduct a comprehensive inspection and cleaning, and test all functions to confirm normal operation before use.
Chapter 13 Common Product Problems and Solutions
During long-term use of the shielding desk, various faults may occur due to improper operation, component aging, or environmental factors. This chapter summarizes the most common fault phenomena, causes, and corresponding troubleshooting methods to help operations personnel quickly locate and resolve faults. For complex faults or issues that cannot be resolved independently, please contact the manufacturer’s technical support promptly.
13.1 Electrical Faults
13.1.1 Unit Completely Dead – No Power, Indicator Not Lit
Possible causes:
- External mains power outage or no power at the socket;
- Loose power plug or poor contact;
- Main power switch damaged;
- Residual current device (RCD) tripped;
- Power input fuse blown;
- Power filter damaged;
- Open circuit in internal wiring.
Troubleshooting methods:
1. Check external power: use a multimeter to measure the mains socket voltage, confirming whether AC220V is present; if no power, investigate the upstream power supply;
2. Re-plug the power cord to ensure a firm connection; check for power cord damage;
3. Check whether the RCD has tripped; if tripped, press the reset button; if it trips repeatedly, investigate the leakage fault;
4. Check the power input circuit fuse; replace with the same specification if blown; if it blows repeatedly, investigate the short-circuit fault;
5. Open the equipment rear cover and measure the input and output voltage of the main power switch; replace if the switch is damaged;
6. Measure the power filter input and output voltage; if input is normal but there is no output, the filter is damaged – contact the manufacturer for replacement;
7. Trace the internal wiring section by section, find the break point, reconnect and properly insulate.
13.1.2 Fan Not Running
Possible causes:
- Fan switch not turned on or damaged;
- Fan power wiring loose or disconnected;
- Fan motor burnt out;
- Fan bearing seized;
- Temperature control module fault (temperature-controlled models).
Troubleshooting methods:
1. Confirm the fan switch is in the ON position; replace the switch if damaged;
2. Open the chamber, check the fan wiring for looseness, reconnect and tighten;
3. Use a multimeter to measure the fan supply voltage; if voltage is normal, the fan is faulty – replace with a fan of the same specification;
4. Manually rotate the fan blades; if stuck, the bearing lacks lubrication or is damaged – clean and lubricate or replace the fan;
5. For temperature-controlled models, first check whether the temperature setting is too high; short-circuit the temperature control terminals to test whether the fan runs; replace the temperature control module if faulty.
13.1.3 Internal Socket Has No Power
Possible causes:
- Main power not turned on;
- PDU switch not on or damaged;
- PDU overload protection tripped;
- PDU wiring loose;
- Power filter output fault.
Troubleshooting methods:
1. Confirm the main power switch is on and the power indicator is lit;
2. Check whether the PDU’s own switch is on and whether the overload protection has tripped; reset and retest;
3. Measure the PDU input voltage; if there is input but no output, the PDU is faulty – replace the PDU;
4. Check whether the PDU wiring terminals are loose; retighten;
5. Measure the power filter output voltage; if there is no output, investigate the filter fault.
13.1.4 Residual Current Device Tripping Frequently
Possible causes:
- Internal equipment leakage;
- Damaged or damp wiring insulation causing leakage;
- Filter internal leakage;
- RCD itself faulty.
Troubleshooting methods:
1. Unplug all internal equipment plugs and test with the breaker closed; if it does not trip, plug in equipment one by one to identify the leaking device and repair it;
2. If it still trips with all equipment unplugged, trace the internal wiring for damage, moisture, or enclosure contact, and address the insulation issue;
3. Disconnect the filter output end and test whether the input end trips; if it still trips, the RCD is faulty – replace it; if it does not trip, the filter is leaking – replace the filter.
13.2 Shielding Performance Faults
13.2.1 Reduced Shielding Effectiveness – Test Failure
Possible causes:
- Shielding door conductive gasket worn, dirty, or aged;
- Door deformation, insufficient locking pressure, poor door seam sealing;
- Additional openings in the cabinet, weld seam cracks;
- Cables passing directly through without filters;
- Filter aging or poor grounding;
- Waveguide window damaged or poor contact;
- Shielding glass wire mesh contact issue;
- Grounding system fault, excessive ground resistance.
Troubleshooting methods:
1. Check door sealing:
- Clean the contact surfaces of the conductive gasket and door frame, removing dust and oil;
- Check gasket wear condition; replace if severely worn;
- Adjust door hinges and locking mechanisms to ensure tight closure with uniform pressure.
2. Check cabinet integrity:
- Visually inspect the cabinet for unauthorized openings or weld cracks; seal any holes found by welding metal plates with conductive sealing;
- Check that all cable pass-throughs use filters or sealed glands; immediately rectify any direct through-hole wiring.
3. Check filters:
- Tighten filter mounting screws to ensure good contact between the housing and cabinet;
- Check filter grounding reliability and correct wiring;
- Replace aged or failed filters with identical models.
4. Check waveguide windows and observation windows:
- Check waveguide window mounting screws and tighten to ensure conductive continuity;
- Check conductive contact around the shielding glass and re-compress as needed.
5. Check grounding system:
- Test ground resistance; if excessive, trace the grounding wiring and rectify the ground electrode.
13.2.2 Significant Electromagnetic Leakage at Door Seam
Possible causes:
- Conductive gasket partially missing or broken;
- Door deformation causing excessive local gaps;
- Paint or oxidation layer on the door frame contact surface causing poor conductivity;
- Loose locking mechanism with insufficient pressure;
- Foreign objects trapped in the door seam.
Troubleshooting methods:
1. Check the door seam for foreign objects and clean them out;
2. Check whether the conductive gasket is intact; replace or install if broken or missing;
3. Use fine sandpaper to sand the door frame contact surface, removing oxidation layers and insulating coatings, and apply a small amount of conductive grease;
4. Adjust the locking mechanism linkage to increase locking pressure, ensuring uniform gasket compression;
5. For slight door deformation, adjust the hinges for correction; for severe deformation, return the equipment to the factory for repair.
13.2.3 Signal Leakage at Interfaces
Possible causes:
- Poor filter housing grounding;
- Ungrounded cable shielding layers;
- Loose interface connections or poor contact;
- Filter damaged and filtering ineffective;
- Unsealed gaps around the interface.
Troubleshooting methods:
1. Tighten the filter mounting screws to ensure close contact between the housing and cabinet for good conductivity;
2. Ground the shielding layer of shielded cables at one end to the cabinet body; ensure proper grounding treatment;
3. Firmly insert interface plugs and tighten fixing screws to ensure good contact;
4. Replace faulty filters with original manufacturer products of identical specifications;
5. Fill gaps around the interface panel with conductive sealing compound to ensure conductive continuity.
13.3 Heat Dissipation and Temperature Faults
13.3.1 Internal Temperature Too High – Equipment Overheating
Possible causes:
- Cooling fan not turned on or faulty;
- Dust filter blocked, poor ventilation;
- Waveguide ventilation window clogged with dust;
- Excessive internal equipment, excessive load;
- Equipment placement blocking ventilation openings, obstructed airflow path;
- Ambient temperature too high;
- Fan reversed, insufficient airflow.
Troubleshooting methods:
1. Turn on the fan switch; examine and replace the fan if faulty;
2. Remove and clean the dust filter; replace if severely clogged;
3. Blow out the waveguide window with compressed air, cleaning honeycomb opening dust;
4. Reduce internal equipment or upgrade to a higher-airflow heat dissipation system;
5. Adjust internal equipment placement to avoid blocking ventilation openings, reserve heat dissipation clearance, and straighten the airflow path;
6. Improve ambient ventilation and reduce ambient temperature; install air conditioning if necessary;
7. Adjust the fan wiring phase sequence to correct the rotation direction and ensure correct airflow direction.
13.3.2 Fan Operating Noise Excessive
Possible causes:
- Loose fan mounting screws causing resonance;
- Fan bearing worn or lacking lubrication;
- Dust on fan blades causing dynamic imbalance;
- Fan contacting surrounding cables or components;
- Unstable cabinet installation causing overall vibration.
Troubleshooting methods:
1. Tighten the fan mounting screws and add vibration-damping pads to reduce resonance;
2. Add lubricating oil to fan bearings; replace the fan if severely worn;
3. Clean dust from fan blades to restore dynamic balance;
4. Organize surrounding cables and components to avoid contact and friction with the fan;
5. Adjust the equipment leveling feet to ensure the cabinet is level and stable without wobbling.
13.4 Structural and Mechanical Faults
13.4.1 Shielding Door Sticking or Not Opening/Closing Smoothly
Possible causes:
- Hinge screws loose or misaligned;
- Hinges lack lubrication or are worn;
- Door body deformed or sagging;
- Lock mechanism sticking;
- Excessive gasket friction.
Troubleshooting methods:
1. Adjust the hinge screws and correct the door position to ensure uniform gaps;
2. Apply lubricating grease to hinge shafts to reduce friction;
3. Minor sagging can be corrected by hinge adjustment; for severe deformation, return the equipment to the factory for correction;
4. Clean the lock linkage and latch points, and apply a small amount of lubricating oil;
5. Clean the gasket surface, remove impurities, and avoid dry friction.
13.4.2 Door Lock Malfunction – Cannot Lock or Open
Possible causes:
- Lock cylinder damaged or sticking;
- Linkage mechanism disengaged;
- Handle broken;
- Door misaligned so latches do not align.
Troubleshooting methods:
1. For a sticking lock cylinder, inject graphite pencil lead powder for lubrication; replace the lock cylinder if damaged;
2. Open the door body to inspect the internal linkage mechanism; reinstall and secure if disengaged;
3. Replace a broken handle with an identical model;
4. Adjust the door hinges and correct the position so the latches align accurately.
13.4.3 Drawer Slide Rack Sticking When Pulling/Pushing
Possible causes:
- Slide rails deformed or containing foreign objects;
- Slide rollers damaged or lacking lubrication;
- Rack tilted or overloaded;
- Cables pulling and blocking.
Troubleshooting methods:
1. Clean dust and debris from the slide rails and correct any deformed rails;
2. Add lubricating oil to rollers; replace if damaged;
3. Adjust the rack level, reduce weight, and avoid overloading;
4. Organize cables behind the rack, leaving sufficient length to avoid pulling.
13.5 Interface and Signal Faults
13.5.1 USB Interface Cannot Recognize Device
Possible Causes:
- USB device malfunction;
- Poor interface contact, oxidized pins;
- Damaged USB filter;
- Loose internal wiring;
- Device driver issues.
Troubleshooting and Solutions:
- Replace the USB device for testing to confirm whether the device itself is faulty;
- Clean the interface pins with anhydrous alcohol; replace the interface if oxidation is severe;
- Connect directly to the internal host USB port for testing; if normal, the filter is damaged and should be replaced;
- Check internal USB wiring; re-seat any loose connections;
- Update device drivers and confirm system settings are normal.
13.5.2 Network Connection Failure, Packet Loss
Possible Causes:
- Faulty network cable, loose RJ45 connector;
- Poor contact at the network interface;
- Damaged network filter;
- Faulty NIC (Network Interface Card) on internal device;
- External network failure.
Troubleshooting and Solutions:
- Replace the network cable for testing; re-crimp the RJ45 connector;
- Clean the network interface and ensure it is fully seated;
- Connect directly to the internal NIC for testing; if normal, the filter is damaged and should be replaced;
- Check the status of the internal device’s NIC; update drivers or replace the NIC;
- Troubleshoot the external network and switches to confirm the external network is normal.
13.5.3 Display Image Streaks and Interference
Possible Causes:
- Poor contact of the video cable;
- Video cable running parallel to power cables, causing interference;
- Faulty video filter;
- Monitor malfunction;
- Host graphics card issues.
Troubleshooting and Solutions:
- Re-plug the video cable and tighten the retaining screws;
- Adjust cable routing; separate video cables from power cables with a spacing of ≥30 cm;
- Connect directly to the host for testing; if normal, the filter is damaged and should be replaced;
- Replace the monitor for testing to rule out monitor failure;
- Check the host graphics card; update drivers or have the card repaired.
13.6 Other Common Issues
13.6.1 Static Electricity on Device Surface
Possible Causes:
- Poor grounding, static charge cannot be dissipated;
- Dry environment, static charge accumulation.
Troubleshooting and Solutions:
- Check the grounding connection and test the grounding resistance to ensure reliable grounding;
- Increase environmental humidity to reduce static generation.
13.6.2 Fogging and Condensation on Shielded Glass
Possible Causes:
- Excessive environmental humidity, large temperature fluctuations;
- Sealant cracking, allowing moisture to enter the interlayer.
Troubleshooting and Solutions:
- Reduce environmental humidity; enable air conditioning dehumidification; fog will naturally dissipate once temperature stabilizes;
- Re-apply sealant where cracking is found; replace the shielded glass if damage is severe.
13.6.3 Surface Corrosion of the Cabinet Body
Possible Causes:
- Humid environment, presence of corrosive gases;
- Damaged surface coating not treated in a timely manner.
Troubleshooting and Solutions:
- Improve the operating environment; ensure proper ventilation and dehumidification; avoid corrosive gases;
- Sand and derust the corroded area; apply anti-rust primer and topcoat to prevent corrosion from spreading.
This chapter summarizes the most frequently asked questions from users regarding product selection, installation, operation, maintenance, and compliance in a Q&A format, enabling users to quickly acquire relevant knowledge. For any other questions, please contact our technical support hotline.
14.1 Basic Product Selection
Q1: What is the difference between a shielded desk and a shielded cabinet, and how should I choose?
A: Both products share the same core principle as electromagnetic shielding equipment. The main differences lie in form factor and application scenarios:
- The shielded desk features a desk-type structure with a workable tabletop, integrated observation window, suitable for single-terminal operation, flexible deployment, no dedicated server room required, ideal for classified workstations in office areas;
- The shielded cabinet features a vertical rack structure with large capacity, suitable for housing multiple servers and network devices, ideal for server room environments.
In short, choose a shielded desk for single-computer terminal operation, and a shielded cabinet for centralized storage of multiple devices.
Q2: What is the difference between Class B and Class A shielding effectiveness, and which grade is needed for general scenarios?
A: According to the BMB19-2006 standard, shielding effectiveness is classified into two grades, A and B. Grade A offers higher shielding effectiveness with stricter requirements:
- Class B: 1MHz–1GHz frequency band ≥60dB, suitable for secret and confidential classified information systems; meets the requirements of the vast majority of government and enterprise classified scenarios;
- Class A: 1MHz–1GHz frequency band ≥80dB, suitable for top-secret and higher-level classified scenarios, with higher shielding performance requirements and higher cost.
For routine office classified scenarios, Class B is sufficient. For high-level military and top-secret scenarios, Class A is required.
Q3: Can a printer be placed on the shielded desk? Can dimensions be customized?
A: Yes, small printers and multifunction devices can be accommodated. The standard model’s internal space can house conventional desktop printers. If the device is larger or has special requirements, we support full-size customization. Internal cavity size, tabletop dimensions, height, and other parameters can be adjusted according to the user’s equipment dimensions while ensuring shielding performance remains compliant.
Q4: Can an ordinary computer be used inside? Is operation troublesome?
A: Ordinary desktop computers and laptops can be used inside. Operations are performed by viewing the screen through the shielded observation window and connecting keyboard and mouse through the front USB interface, which is basically the same as operating a normal computer. The only difference is that the equipment is enclosed in a sealed cavity, requiring an initial adaptation period; once familiar, normal office efficiency is not affected.
14.2 Installation and Construction
Q5: Does shielded desk installation require professionals? Can I install it myself?
A: Standard shielded desks are shipped as a complete unit. On arrival, only power and network connections are required for operation. The structural installation is simple, and ordinary operations and maintenance personnel can complete it following the manual. However, grounding system and shielding effectiveness commissioning should be performed by professionals to ensure shielding performance meets requirements. For custom modifications and complex wiring, installation by the manufacturer or authorized service providers is recommended.
Q6: Are there special requirements for the installation site? Can it be used in an ordinary office?
A: Ordinary offices are completely suitable. Only the following conditions need to be met: level floor with adequate load-bearing capacity, reliable mains power, a qualified grounding terminal, and reserved operating space around the unit. No room renovation is required — install and use immediately.
Q7: How is grounding done? What if there is no grounding grid?
A: The equipment must be reliably grounded with grounding resistance ≤1Ω. If the building already has an integrated grounding grid, connect directly to the grounding terminal. If no dedicated grounding is available, an independent grounding electrode must be fabricated — typically three 2.5-meter galvanized angle steels driven into the ground, connected with flat steel and led out. The grounding resistance must meet requirements before use. Grounding installation should be performed by a qualified electrician.
Q8: Can the unit be moved? Can it be relocated when changing offices?
A: Yes, it can be moved. The equipment has adjustable feet at the base, and some models come with casters, making short-distance movement convenient. For long-distance relocation, protective measures should be taken to avoid impact and deformation. After relocation, re-level the unit, test grounding and shielding effectiveness, and resume use once compliant.
14.3 Operation and Usage
Q9: Must the shielded door be completely closed during use? Can it be left slightly open?
A: It must be completely closed and locked. Shielding performance relies on the integrity of the shielding cavity. Even a small gap causes severe electromagnetic leakage, significantly reducing shielding effectiveness and rendering the protection ineffective. Therefore, the door must always be closed and locked during operation. Operating with the door open is strictly prohibited.
Q10: Can holes be drilled in the shielded desk to mount items or add locks?
A: Drilling, welding, or any action that compromises the shielding cavity is strictly prohibited, as it will cause electromagnetic leakage and seriously degrade shielding performance. If accessories are truly needed, contact the manufacturer to evaluate the solution, use methods that do not compromise the shielding structure, or have the manufacturer customize it before shipment.
Q11: Can USB flash drives and portable hard drives be directly plugged into the front USB ports? Will there be data leakage?
A: Yes, they can be used normally. The front USB interfaces are processed through dedicated filters and will not cause electromagnetic leakage. USB flash drives, portable hard drives, keyboards, mice, and other USB devices can be connected normally without compromising information security.
Q12: Can a mobile phone be placed inside for charging?
A: Placing a mobile phone inside the shielding cavity is not recommended. On one hand, phone signals will be shielded, making calls impossible; on the other hand, if the cavity has minor shielding imperfections, the phone signal may become a leakage source. Mobile phones should be kept outside the shielded enclosure or stored in a dedicated phone shielding cabinet.
14.4 Maintenance and Care
Q13: How often should conductive gaskets be replaced? What happens if they are not replaced?
A: Under normal office conditions, conductive gaskets have a service life of approximately 3–5 years. The actual replacement cycle depends on usage frequency and environment; frequent door opening/closing and dusty or humid environments will shorten service life. Once gaskets are worn or aged, door seam sealing degrades, shielding effectiveness decreases, and protection may fail to meet requirements. Regular inspection is therefore necessary, with timely replacement when performance declines.
Q14: How often should the dust filter screen be cleaned, and how?
A: Clean once per month in ordinary office environments, and once every two weeks in dusty environments. Cleaning method: remove the filter screen, blow dust from the inside out using compressed air, or rinse with clean water, air-dry in a shaded area, then reinstall. Do not expose to direct sunlight. Replace the filter screen if damaged or clogged beyond cleaning.
Q15: Should the power be disconnected during long periods of non-use? Any precautions?
A: For periods of non-use exceeding 3 days, disconnecting power is recommended for both energy savings and safety. For shutdown exceeding 1 month, clean the unit, close the door, and protect against dust and moisture. Power on for half an hour each month to expel moisture. Before resuming use, inspect and clean the unit, and verify functionality before operation.
Q16: What should be used for routine cleaning? Can alcohol be used?
A: Use a clean damp cloth for the exterior surface; neutral cleaning agents can be used for stubborn stains. Conductive gaskets and conductive contact surfaces can be wiped with anhydrous alcohol to remove oil and dust, but use it sparingly and allow to dry completely before closing the door and powering on. Using strong corrosive solvents such as gasoline or thinner is strictly prohibited, as they can damage the coating and gaskets.
14.5 Compliance and Certification
Q17: Does the product have confidentiality qualifications? Can it pass confidentiality inspections?
A: Our shielded desk products have passed testing by the National Confidentiality Science and Technology Testing Center, comply with the BMB19-2006 standard, and hold Classified Information System Product Testing Certificates. They can pass confidentiality inspections and graded protection evaluations, making them compliant electromagnetic protection products.
Q18: What is the warranty period? How is after-sales service provided?
A: The complete unit carries a free 2-year warranty. Core components (filters, fans, structural parts) carry a 3-year warranty. Lifetime technical support and repair services are provided. Within the warranty period, non-artificial damage is repaired and parts replaced free of charge; after the warranty period, only cost is charged. Service networks are established in multiple regions nationwide, providing 7×24 technical support with a fault response time within 24 hours.
Q19: Does shielding effectiveness need to be tested annually?
A: Standard confidentiality management requires periodic testing. Annual shielding effectiveness testing is generally recommended to ensure sustained performance compliance. We can provide on-site testing services or assist in coordinating testing by third-party authoritative institutions.
Q20: Can you issue special VAT invoices? Are test reports available?
A: We are a general taxpayer and can issue special VAT invoices. Product certificates of conformity and copies of third-party test reports are provided with each shipment. Original documents can be provided separately upon request.
Product acceptance is a critical step in the delivery of shielded desk projects. Through a standardized acceptance process, product quality, installation quality, and performance indicators are comprehensively verified to ensure the product complies with contract requirements and relevant standards, protecting user interests. The acceptance process is divided into four stages: factory acceptance, arrival acceptance, installation and commissioning acceptance, and final acceptance. Each stage must be executed strictly in accordance with standards, with corresponding acceptance documents signed.
15.1 Acceptance Basis and Standards
Acceptance work strictly follows the following basis and standards:
- Purchase contracts, technical agreements, design drawings, and other documents;
- BMB19-2006 *Technical Requirements and Test Methods for Electromagnetic Leakage Emission Shielding Cabinets*;
- GJB5792-2006 *General Specification for Military Electromagnetic Shielding Cabinets*;
- GB/T 12190-2021 *Measurement Methods for Shielding Effectiveness of Electromagnetic Shielding Enclosures*;
- GB 50462-2008 *Code for Construction and Acceptance of Electronic Information System Room Engineering*;
- Product factory inspection standards and requirements stated in this manual.
15.2 Factory Acceptance Test (FAT)
Factory acceptance is conducted at the manufacturer’s facility after production is completed and before shipment. User representatives or entrusted third parties may attend on-site acceptance, or the manufacturer may issue a factory inspection report for remote confirmation by the user.
15.2.1 Factory Acceptance Content
Appearance and Structure Acceptance:
- Inspect product appearance: coating should be smooth and even, with no obvious scratches, paint loss, rust, or deformation;
- Inspect structural dimensions: length, width, height, and internal dimensions should comply with contract requirements;
- Inspect door operation: smooth opening/closing, flexible and reliable locking mechanism, even door seams;
- Inspect weld quality: smooth welds, no cold welding, missed welds, or porosity.
Configuration and Accessories Acceptance:
- Verify against the contract configuration list: number of interfaces, types, internal racks, shelves, and other configurations should be complete;
- Verify accompanying accessories and documentation are complete, with correct model and specifications.
Electrical Function Acceptance:
- Power on to test power switching, fan operation, indicator lights, and other functions;
- Test interface continuity and leakage protection function;
- Test insulation resistance, grounding continuity, and other electrical safety indicators.
Shielding Effectiveness Sampling Test:
- Conduct sampling tests of shielding effectiveness using standard methods to confirm rated indicators are achieved;
- Issue factory shielding effectiveness test records.
Qualification Document Acceptance:
- Verify product certificates of conformity, test reports, certification certificates, and other qualification documents are complete and valid.
15.2.2 Factory Acceptance Process
1. The manufacturer notifies the user of the acceptance time 3 days in advance and prepares the products and relevant documentation;
2. Upon arrival of acceptance personnel, the manufacturer introduces the product status and the acceptance plan;
3. Inspect and test item by item according to the acceptance content, completing acceptance records;
4. If qualified, both parties sign the factory acceptance certificate;
5. If issues are found, the manufacturer rectifies within a specified period, followed by re-inspection until qualified.
After acceptance is qualified, the product is packaged and shipped.
15.3 Arrival Acceptance
Arrival acceptance is conducted after the equipment arrives at the user’s site, primarily verifying whether the product was damaged during transport and whether accessories are complete.
15.3.1 Arrival Acceptance Content
- Packaging inspection: Check whether the outer packaging is intact, with no damage, water immersion, or impact marks; confirm transport protection status.
- Appearance inspection: After unboxing, inspect the overall appearance for transport damage such as impacts, deformation, paint loss, or scratches.
- Quantity inventory: Verify equipment, accessories, and documentation against the product list and contract; verify model and specifications.
- Documentation verification: Inspect certificates of conformity, test reports, manuals, warranty cards, and other documentation for completeness.
15.3.2 Arrival Acceptance Process
1. Upon equipment arrival, user and supplier representatives open the box together;
2. Inspect and inventory item by item, completing the arrival acceptance form;
3. If no discrepancies, both parties sign for confirmation;
4. If transport damage, missing parts, or other issues are found, take photos as evidence on site, contact the supplier for resolution, and defer signing.
15.4 Installation and Commissioning Acceptance
After equipment installation and commissioning is completed, installation and commissioning acceptance is conducted to verify installation quality and equipment functionality.
15.4.1 Installation Quality Acceptance
Positioning and Placement Acceptance:
- Equipment position complies with design requirements, placed stably and level;
- Adjustable feet bear load evenly; cabinet body shows no wobble;
- Reserved surrounding space meets operational and maintenance requirements.
Grounding System Acceptance:
- Grounding wire specification complies with requirements, connections are firm, workmanship is standardized;
- Grounding resistance tested at ≤1Ω, test data recorded;
- Grounding path is reasonable, no unauthorized series connections.
Cable Routing Acceptance:
- Power and signal cables separated, wiring neat, bundling standardized;
- Cable labels clear, both ends correspond accurately;
- All cables routed through filters, no direct pass-through holes;
- Filter input and output cables separated, no parallel crossing.
Safety Protection Acceptance:
- No exposed live parts, insulation protection in place;
- Leakage protection and overload protection function properly;
- Warning labels complete and prominently positioned.
15.4.2 Functional Performance Acceptance
Electrical Function Acceptance:
- Main power and fan switch controls operate normally, indicator lights display correctly;
- Internal socket power supply normal, stable voltage;
- Leakage protection and overload protection operate correctly.
Interface Function Acceptance:
- USB, network, video, telephone, and other interfaces function normally with stable data transmission;
- No disconnection, packet loss, or interference.
Thermal Performance Acceptance:
- Equipment runs at full load for 1 hour; internal temperature remains within normal range;
- Fans operate smoothly, proper airflow, noise within limits.
Mechanical Performance Acceptance:
- Door opens/closes smoothly, locks reliably, even sealing;
- Racks and shelves slide smoothly and are securely fixed;
- No abnormal noise, binding, or looseness.
15.4.3 Installation and Commissioning Acceptance Process
1. After installation and commissioning, the supplier submits an acceptance application and commissioning records;
2. The user organizes acceptance personnel to inspect and test item by item;
3. Complete the installation and commissioning acceptance form, recording all test data;
4. If qualified, sign the acceptance document;
5. For unqualified items, issue a rectification notice and re-inspect after rectification within the specified period.
15.5 Final Acceptance (Performance Acceptance)
Final acceptance is the final step in project delivery. The core verification is whether shielding effectiveness indicators meet requirements. It is typically conducted after a trial operation period and may be performed by a third-party authoritative testing institution.
15.5.1 Trial Operation Period
After passing installation and commissioning acceptance, a 1–3 month trial operation period begins:
- Equipment is put into normal use, with operating status and fault conditions recorded;
- No major faults during trial operation, stable performance, no shielding effectiveness anomalies;
- Upon completion of the trial operation, submit the trial operation report and apply for final acceptance.
15.5.2 Shielding Effectiveness Testing
Shielding effectiveness testing is the core content of final acceptance, conducted in accordance with GB/T 12190-2021:
- Test method: Transmit-receive method. A transmitting antenna is placed outside the shielded enclosure and a receiving antenna inside. Field strength attenuation values at different frequency bands are measured, and shielding effectiveness is calculated.
- Test frequency range: Covers the full 14KHz–18GHz frequency band, with typical frequency points selected for testing.
- Test points: Select typical positions including the front, side, rear of the cabinet, door seams, observation window, and ventilation openings for comprehensive shielding performance evaluation.
- Qualification criteria: Shielding effectiveness at all test points meeting contractual and standard requirements constitutes a pass.
- Testing institution: May be performed by national confidentiality testing institutions such as the National Confidentiality Science and Technology Testing Center with national confidentiality testing qualifications. All test instruments pass national metrological verification. The testing process strictly follows GB/T 12190-2021 and BMB series standard specifications. The issued test reports have legal force and can serve as formal compliance basis for confidentiality qualification certification, graded protection evaluation, and cybersecurity classified protection evaluation. For general projects without mandatory third-party testing requirements, our technical personnel may conduct on-site self-testing using professional-grade field strength testing equipment and issue a manufacturer-level shielding effectiveness self-test report. Grassroots units may also have operations personnel perform performance verification using the simplified test methods in Chapter 10 of this manual to preliminarily verify equipment protection status.
15.5.2.1 Pre-Test Preparation
Before formal shielding effectiveness testing, preparation in three areas — environment, equipment, and personnel — must be completed to eliminate interference factors and ensure test data is accurate, reproducible, and traceable.
Equipment Under Test Preparation:
- Clean all debris, tools, and excess cables from inside the shielding cavity to ensure no abnormal metal conductors that could interfere with electromagnetic field distribution;
- Check the shielding door is closed and locked, ensuring the conductive gasket is in tight contact with the door frame, with no foreign objects caught or localized warping;
- Check all external interfaces: unused ports should be capped with original factory metal sealing plugs; in-use interfaces should be fully seated; cables should be organized and secured with no looseness or detachment;
- Check waveguide ventilation windows and shielded observation windows for damage or deformation; confirm secure mounting and good conductive contact;
- Confirm the grounding system is reliably connected and grounding resistance meets requirements; grounding status must remain unchanged during testing.
Test Environment Preparation:
- Select an open indoor space for testing; no large metal objects, strong electromagnetic radiation equipment, or high-voltage cables within 3 meters to avoid environmental reflection and interference affecting the test baseline;
- Environmental temperature controlled at 10℃–35℃, relative humidity 30%–70%, atmospheric pressure 86kPa–106kPa, meeting test instrument operating requirements;
- Turn off unrelated electronic equipment on site during testing to reduce background electromagnetic noise; background noise should be at least 20dB below the measured signal;
- Level floor with a stable instrument platform; no obvious vibration, dust, or corrosive gases.
Test Instrument Preparation:
- Configure a complete test system: signal generator, RF power amplifier, full-band transmitting antenna array, near-field probe, spectrum analyzer, field strength meter, fiber optic transmission link, etc.;
- All test instruments must be within the validity period of metrological verification, accuracy class meeting standard requirements; perform system calibration and zero-point calibration before testing;
- Pre-test environmental background noise and free-space baseline to confirm the test system operates normally with no instrument faults.
Personnel Organization Preparation:
- Form a test team, defining the responsibilities of the test leader, operator, and recorder; familiarize the team with the test plan and operating procedures;
- Arrange equipment operators to assist with testing — responsible for opening/closing the shielding door, adjusting internal antenna positions, coordinating test point transitions — and follow the test personnel’s direction.
15.5.2.2 Standard Test Method and Operating Procedure
According to GB/T 12190-2021, shielding effectiveness testing uses the transmit-receive method, divided into two phases: free-space baseline testing and shielded enclosure attenuation testing. The specific operating procedure is as follows:
Phase 1: Free-Space Baseline Testing
- In the same spatial environment as the equipment under test, place the transmitting and receiving antennas facing each other at standard test distance, maintaining consistent antenna height and polarization direction;
- The signal generator outputs a continuous wave signal at the set frequency point, amplified by the power amplifier and delivered to the transmitting antenna, forming a stable radiation field;
- The receiving antenna captures the spatial field strength signal, transmitted to the spectrum analyzer for reading and recording the field strength amplitude, denoted as baseline field strength E₀ (electric field) or H₀ (magnetic field);
- Complete baseline testing for all test frequency points in sequence. Read values 3 times consecutively at each frequency point, take the average as the final baseline data, and record for archiving.
Phase 2: Shielded Enclosure Loading Test
- Place the receiving antenna at the geometric center of the shielding desk cavity, maintaining antenna polarization direction consistent with the transmitting antenna. The antenna cable exits the cavity through a dedicated filter interface, connected to external test instruments;
- Close and lock the shielding door, confirming complete enclosure of the cavity. Place the transmitting antenna outside the cabinet at the corresponding test point, 30cm from the cabinet surface, with the antenna center aligned to the test area;
- The signal generator outputs a signal at the same power and frequency point as the baseline test. The transmitting antenna radiates electromagnetic waves toward the shielded enclosure. The receiving antenna captures the residual field strength inside the cavity, recorded as shielded field strength E₁ (electric field) or H₁ (magnetic field);
- Calculate shielding effectiveness at that frequency point and location: Electric field shielding effectiveness SE_E = 20lg (E₀/E₁), magnetic field shielding effectiveness SE_H = 20lg (H₀/H₁), in dB.
Test Point Traversal Testing
- Sequentially move the transmitting antenna to complete full-frequency testing at all test points. Standard test points include: 5 planar points — front center, rear center, left side center, right side center, top center — plus 4 weak points — around the door seam, shielded observation window center, intake/exhaust ventilation openings, and interface panel — totaling 9 typical test areas;
- For larger cabinets, additional test points may be added to ensure comprehensive coverage of all potential leakage areas.
Data Verification and Anomaly Retesting
- Record data synchronously during testing. If abnormal value fluctuations are found, immediately investigate interference factors and repeat the test 3 times to confirm results;
- After all tests are completed, randomly select 20% of test points for repeat verification. A repeat test deviation of ≤2dB constitutes a valid test. If deviation is excessive, recalibrate instruments and perform a comprehensive retest.
15.5.2.3 Test Frequency Point Selection and Grade Determination Standards
Based on the application scenario and protection grade requirements of the shielding desk, test frequency points cover the full 14kHz–18GHz frequency band, with typical frequency points selected at logarithmic intervals. Determination standards for different protection grades are as follows:
| Frequency Band | Standard Test Frequency Points | Class B Qualification Standard | Class A Qualification Standard |
|---|---|---|---|
| Low-frequency magnetic field band | 14kHz, 100kHz, 1MHz | Magnetic field shielding effectiveness ≥50dB | Magnetic field shielding effectiveness ≥60dB |
| Medium frequency band | 10MHz, 100MHz, 500MHz | Plane wave shielding effectiveness ≥70dB | Plane wave shielding effectiveness ≥85dB |
| High frequency band | 1GHz, 3GHz, 10GHz, 18GHz | Plane wave shielding effectiveness ≥70dB | Plane wave shielding effectiveness ≥80dB |
For customized special frequency band protection requirements, corresponding frequency points may be added per contract agreement, such as 433MHz commonly used in industrial applications, 2.4GHz/5.8GHz for civilian wireless, and satellite communication bands, ensuring shielding effectiveness meets requirements in the target frequency bands.
15.5.2.4 Final Qualification Determination Rules
Shielding effectiveness testing qualification requires ALL of the following conditions to be met simultaneously. Failure of any single item constitutes a shielding performance failure:
- Shielding effectiveness values at all test frequency points are not lower than the corresponding protection grade standard requirements, with no frequency point exceeding limits;
- The difference in shielding effectiveness between weak points (door seam, observation window, interfaces, etc.) and the main cabinet body is ≤10dB, with no obvious concentrated leakage points;
- Repeat test data deviation from initial test data is ≤3dB, performance is stable with no major fluctuations;
- No visible structural damage, seam leakage, unauthorized openings, or other obvious defects.
If only individual frequency points show shielding effectiveness slightly below standard (difference ≤3dB), and no clear leakage path exists, one on-site rectification is permitted. After optimization through cleaning conductive gaskets, adjusting door locking force, tightening filter mounting screws, or other measures, a retest may be conducted. If the retest passes, the equipment may be judged as qualified.
15.5.3 Graded Handling Process for Unqualified Acceptance Items
When unqualified items are found during acceptance, they must be handled through the closed-loop process of “Problem Recording — Graded Classification — Rectification Planning — Re-inspection Confirmation — Dispute Arbitration” to fully protect user legal rights.
Grading and Classification of Unqualified Items
Based on the impact of unqualified items on product function, safety, and performance, they are classified into two grades:
- General unqualified items: Minor appearance coating scratches, missing non-core accessories, functional anomalies on individual non-classified interfaces, slightly low shielding effectiveness at individual frequency points/locations, installation workmanship defects, etc. These do not affect core shielding performance or primary usage functions and can be repaired through simple on-site rectification;
- Severe unqualified items: Structural deformation or cracking of the main body, weld separation, overall shielding effectiveness substantially below standard (difference >10dB), electrical system safety hazards (leakage/short circuit), failure of core functions rendering the unit unusable, misconfigured or missing key accessories, etc. These directly affect the equipment’s protection capability and operational safety and cannot be repaired through simple on-site rectification.
Rectification Plan Development and Confirmation
The acceptance team issues a written unqualified item notice specifying the problem description, judgment basis, rectification requirements, and deadline. The supplier must submit a detailed rectification plan within 3 working days of receiving the notice, including rectification measures, technical methods, responsible personnel, completion schedule, and acceptance criteria. Rectification starts after user approval. The rectification period for general unqualified items shall not exceed 7 working days; for severe unqualified items, no more than 15 working days.
On-Site Rectification and Process Supervision
The supplier arranges certified technical personnel to perform on-site rectification, replacing defective components, repairing structural defects, commissioning performance parameters, and optimizing installation workmanship. The rectification process is subject to user supervision throughout. Any modifications to the shielding cavity structure must include proper conductive sealing treatment; leaving leakage hazards is strictly prohibited. After rectification, the supplier conducts self-inspection first, then submits a re-inspection application upon passing.
Re-inspection and Final Determination
Upon receiving the re-inspection application, the user organizes the original acceptance team for re-inspection, focusing on comprehensive re-testing of the original unqualified items. If all re-inspection items pass, acceptance is formally determined as passed. If re-inspection still fails, the user has the right to choose return, exchange, discounted settlement, or other remedies. Economic losses caused by product quality issues may be pursued against the supplier for breach of contract per the purchase contract terms.
Dispute Arbitration Mechanism
If both parties have disputes over acceptance results that cannot be resolved through negotiation, a national-level third-party authoritative testing institution mutually recognized by both parties may be jointly commissioned for arbitration testing. The arbitration test result is the final determination. Testing costs are borne by the responsible party; if both parties share responsibility, costs are allocated proportionally.
15.5.4 Final Acceptance Conclusion Signing and Delivery
After all acceptance items are qualified and all rectification items have passed re-inspection, a final acceptance review meeting is held to formally complete project delivery.
- The acceptance team compiles all acceptance documentation and issues the *Final Acceptance Report for Shielded Desk Project*, detailing the project overview, acceptance process, test results of all indicators, issues found and rectification status, and the final acceptance conclusion;
- Project leaders and acceptance representatives of both parties sign the acceptance report and affix official seals. The report is made in duplicate, with each party retaining one copy, serving as the legal basis for project completion, payment settlement, and warranty commencement;
- On the date of final acceptance, the equipment is formally transferred to user management and operation. The warranty period commences from the date of final acceptance qualification.
15.6 Acceptance Delivery Technical Documentation List
Upon completion of final acceptance, the supplier must deliver complete paper and electronic technical documentation to the user, establishing a full life-cycle equipment archive. The delivery documentation list is as follows:
| No. | Document Name | Quantity | Medium | Description |
|---|---|---|---|---|
| 1 | Shielded Desk Installation, Wiring, and Commissioning Manual | 2 sets | Paper + Electronic | Contains all technical parameters, operating specifications, and maintenance methods |
| 2 | Product Certificate of Conformity | 1 copy | Paper | Stamped with manufacturer quality inspection seal |
| 3 | Factory Inspection Original Records | 1 copy | Paper | Contains full-item factory performance test data |
| 4 | Third-Party Shielding Effectiveness Test Report | 1 copy | Paper | Issued by authoritative institution, bearing CMA/CAL qualification stamps |
| 5 | Copy of Classified Information System Product Testing Certificate | 1 copy | Paper | Stamped with manufacturer official seal, consistent with original |
| 6 | Installation and Commissioning Process Records | 1 copy | Paper | Contains grounding test, insulation test, and commissioning data |
| 7 | Equipment Trial Operation Record Form | 1 copy | Paper | Operating status, fault records, and resolution during trial operation |
| 8 | Final Acceptance Report | 2 copies | Paper | Formal document signed and sealed by both parties |
| 9 | Product Warranty Card | 1 copy | Paper | Specifies warranty period, service scope, and repair request methods |
| 10 | Electrical Schematic Diagrams and Wiring Diagram Book | 1 set | Paper + Electronic | Contains power circuit, signal circuit, and control circuit schematics |
| 11 | Spare Parts and Consumables List | 1 copy | Paper | Contains model, specification, replacement cycle, and procurement method |
| 12 | Operation and Maintenance Training Courseware | 1 set | Electronic | For daily operator training and assessment |
| 13 | Special Tools and Accessories | 1 set | Physical | Installation and commissioning wrenches, spare seals, etc. |
All paper documentation is uniformly bound into volumes. Electronic documentation is recorded on dedicated optical discs or delivered via encrypted USB drives. Documentation content is authentic and traceable, with accurate and error-free data.
15.7 Post-Acceptance Training and Management Transfer
The acceptance and delivery phase simultaneously completes operational training and management authority transfer, ensuring users have independent operation and maintenance management capabilities.
15.7.1 On-Site Operational Training
Differentiated training is provided for operators and maintenance personnel respectively, with training duration no less than 2 class hours. Training content includes:
- Basic operation level: Equipment power on/off procedures, daily operating standards, proper shielded door usage, precautions for plugging/unplugging peripheral interfaces, daily inspection key points;
- Operation and maintenance management level: Monthly/quarterly maintenance procedures, consumable replacement methods, common fault troubleshooting, grounding resistance testing, simplified shielding performance testing, and safety management requirements.
Following training, on-site practical assessments are conducted to ensure trainees can independently complete daily operations and basic maintenance tasks.
15.7.2 Equipment Management Authority Transfer
After training, formal equipment management authority transfer procedures are completed:
- Hand over equipment keys, electronic lock passwords, special tools, and spare accessories;
- Define the equipment management responsible person and daily usage standards;
- Sign the equipment transfer confirmation form, completing asset registration and management authority handover.
15.8 Periodic Re-inspection and Long-Term Compliance Management
Shielding performance of shielding desks will naturally degrade with component aging and wear. To ensure continuous compliance with confidentiality management requirements throughout the life cycle, a long-term compliance management mechanism must be established.
- Annual performance re-inspection system: A comprehensive shielding effectiveness test and equipment condition assessment is recommended every 12 months, with an annual test report issued and filed in the unit’s confidentiality work archive. For top-secret and higher-level classified scenarios, re-inspection every 6 months is recommended.
- Special re-inspection trigger conditions: After equipment relocation, structural repair, replacement of core shielding components, or impact/collision, shielding effectiveness testing must be repeated; equipment may only be returned to classified use after passing acceptance.
- Performance degradation early warning mechanism: When re-inspection finds shielding effectiveness decreased by more than 10dB compared to factory values, maintenance and rectification should be promptly initiated, including replacing conductive gaskets and repairing leakage points to prevent continued degradation leading to protection failure.
- Operation and maintenance archive management: Establish a full life-cycle operation and maintenance archive, completely recording every maintenance, repair, test, and fault handling event, achieving traceable and controllable equipment status.
16.1 Service Principles and Commitments
Guangdong Lain Intelligent System Development Co., Ltd. consistently upholds the service principles of “Quality First, Customer Foremost, Rapid Response, Lifetime Service,” with the core objective of ensuring stable equipment operation and information security compliance. We have established a service system covering pre-sales, sales, and after-sales processes, and solemnly commit to all users:
- All factory-shipped products comply with relevant national standards and contract agreements, with qualified quality and reliable performance;
- Strict warranty terms are fulfilled: within the warranty period, non-artificial product faults are repaired free of charge with free parts replacement;
- A 7×24 technical support response mechanism is established, accepting user consultations and fault reports around the clock;
- Lifetime technical support and repair services are provided; after the warranty period, only cost is charged with no service barriers;
- Regular user follow-up visits are conducted to proactively understand equipment operating status and provide preventive maintenance recommendations.
16.2 Warranty Service Details
16.2.1 Warranty Period
- Complete unit free warranty: 2 years, commencing from the date of final acceptance qualification;
- Core shielding components (shielding cavity, conductive gaskets, power filters, signal filters) free warranty: 3 years;
- Consumable parts (dust filter screens, fans, locks, switch indicator lights) free warranty: 1 year;
- Customized accessories and upgrade functions warranty period is per contract terms.
16.2.2 Warranty Scope
Within the warranty period, faults and performance degradation caused by product design, material, or manufacturing process defects under normal installation, normal use, and normal maintenance conditions are within the free warranty scope, including:
- Structural quality issues such as main body weld separation, deformation, or large-area coating peeling;
- Component quality issues such as performance degradation or functional failure of power filters and signal filters;
- Electrical component failures of fans, switches, indicator lights, etc., not caused by artificial damage;
- Shielding effectiveness non-compliance caused by excessive wear or performance degradation of conductive gaskets under normal use;
- Functional failure of factory-configured interfaces, racks, and other accessories not caused by artificial damage.
16.2.3 Exclusions from Warranty
The following circumstances are not within the free warranty scope. Paid repair services may be provided:
- Damage caused by failure to install, use, or maintain per the manual;
- Damage and performance degradation caused by unauthorized disassembly, modification, drilling, welding, or other artificial alterations;
- Damage caused by accidental impact, drops, flooding, fire, lightning, or other external forces and natural disasters;
- Faults and performance degradation caused by use of non-genuine accessories or consumables;
- Normal wear and periodic replacement of consumable parts;
- Faults and damage caused by third-party installation or repair.
16.3 After-Sales Response Mechanism
A graded after-sales service system is established, matching response resources and handling timelines to the impact and urgency of the fault:
Grade 1 Fault (Emergency Fault): Complete equipment failure, severe degradation of shielding effectiveness, or electrical safety hazards, rendering classified work impossible.
- Response timeline: 7×24 reception; telephone response within 30 minutes of receiving the report; emergency handling plan issued within 2 hours; technical personnel on site within 4 hours in the Pearl River Delta region, 24 hours within Guangdong Province, 48 hours outside the province;
- Handling priority: Highest priority, optimal resources allocated, problem resolution prioritized, with backup equipment provided when necessary to ensure business continuity.
Grade 2 Fault (General Fault): Partial functional failure or localized performance degradation, without affecting core shielding functions and basic use.
- Response timeline: Telephone response within 2 hours during working hours; solution provided within 4 hours; on-site service within 48 hours within the province, 72 hours outside the province.
Grade 3 Consultation (Technical Consultation): Non-fault issues such as operation consultation, maintenance consultation, and product selection consultation.
- Response timeline: Immediate response during working hours; reply within 24 hours outside working hours.
16.4 Repair Service Standards
All on-site repair services strictly follow standardized service procedures to ensure repair quality and user experience:
- Repair personnel work with proper certification, wear work badges, dress appropriately, and comply with user unit management regulations;
- Before repair, thoroughly diagnose the fault and inform the user of the fault cause, repair plan, and cost details (for out-of-warranty work); repair only proceeds after user consent;
- Repair operations are performed to standard, with proper on-site protection to avoid soiling or damaging the user’s premises and equipment;
- Replacement parts prioritize genuine original parts to ensure performance after repair; replaced old parts are handled by the user or returned for unified recycling;
- After repair, full functional testing and shielding performance verification are performed; after confirming the fault is resolved and equipment operates normally, the user is asked to sign to confirm the repair result;
- Replacement parts carry a 3-month extended warranty; recurring faults of the same type at the repaired location are repaired free of charge.
16.5 Value-Added Services
In addition to basic warranty and repair services, multiple value-added services are offered to meet diverse user operation and maintenance needs:
- Annual maintenance service: Annual maintenance packages including regular on-site maintenance, shielding effectiveness testing, consumable replacement, and emergency repair — a fully managed service that ensures year-round stable and compliant equipment operation without requiring dedicated operations personnel;
- Upgrade and retrofit service: Interface upgrades, performance upgrades, and function upgrades, such as adding fiber optic interfaces, upgrading to higher shielding effectiveness grades, and installing smart temperature control and monitoring systems, extending equipment service life and adapting to new business requirements;
- Testing and certification service: Assistance in coordinating with third-party authoritative testing institutions for shielding effectiveness testing, confidentiality qualification certification, and classified protection evaluation, with technical support and on-site coordination;
- Custom development service: Customized shielding equipment design and production for special user scenarios, adapting to special dimensions, special interfaces, and special environments;
- Technical training service: On-site thematic training and centralized technical training to enhance user operations team capabilities, covering electromagnetic shielding theory, equipment maintenance, fault troubleshooting, and confidentiality management.
16.6 Service Supervision and Complaint Handling
A comprehensive service quality supervision system is established to ensure service quality:
- After each service completion, user satisfaction follow-up calls are conducted to collect user opinions and suggestions, continuously optimizing service processes;
- A service complaint hotline is established to accept complaints regarding service quality and attitude. Complaints receive a response within 24 hours, with problem verification and rectification feedback completed within 3 working days;
- All service processes are recorded and archived, establishing a service quality traceability mechanism for continuous service improvement.
Contact Information
Manufacturer: Guangdong Lain Intelligent System Development Co., Ltd.
Service Hotline: +86 13538869979 (WhatsApp available)
Technical Support: +86 13538869979
Address: Zhongrun Industrial Park, No. 5 Huashan Road, Shilou Town, Panyu District, Guangzhou
Official Website: gdlain.com
SEO Optimization Keywords and Tag System
I. Search Keyword Classification System
1. Core Primary Keywords
Shielded desk, electromagnetic shielded desk, confidential shielding desk, computer shielding desk, classified shielding workstation
2. High-Conversion Long-Tail Keywords
Shielded desk manufacturer, electromagnetic shielded desk price, confidential shielding desk cost per unit, computer shielding desk installation and commissioning, classified shielded desk acceptance standards, Class B shielding desk manufacturer, military shielded desk customization, office shielded desk specifications, single-station electromagnetic shielding desk, shielded desk installation and wiring manual
3. Industry Traffic Keywords
Electromagnetic shielding equipment, classified terminal protection equipment, TEMPEST protection equipment, confidential room shielding equipment, electromagnetic leakage protection equipment, server room shielding equipment, government confidentiality shielding equipment, military electromagnetic shielding equipment, physical isolation protection equipment, electromagnetic shielding workstation
4. Brand-Specific Keywords
KITOZER shielded desk, Guangdong Lain shielding desk, Lain smart shielding equipment, LA-PZ shielded desk, LA-PG high-end shielding desk, Lain confidential shielding equipment, Guangzhou shielded desk manufacturer, Panyu shielding equipment manufacturer
5. Dropdown/Related Search Keywords
Shielded desk principle, shielded desk shielding effectiveness standard, shielded desk installation and wiring, shielded desk daily maintenance, difference between shielded desk and shielded cabinet, does shielded desk require grounding, which shielded desk brand is best, can shielded desk pass confidentiality inspection, shielded desk service life, shielded desk common fault handling
II. SEO Optimization Tag System
1. Page Core Optimization Tags
- Page positioning: Shielded desk product technical manual and installation/commissioning guide, targeting operations personnel, procurement personnel, and confidentiality management personnel in classified units, providing professional technical reference and product selection basis
- Core theme: Complete shielded desk installation, wiring, and commissioning guide, covering product parameters, principles, installation, wiring, commissioning, maintenance, fault troubleshooting, and acceptance across the full life cycle
2. Title Tag
Shielded Desk_Electromagnetic Shielded Desk Installation and Commissioning Manual_Guangdong Lain Intelligent System Development Co., Ltd.
3. Meta Keywords
Shielded desk, electromagnetic shielded desk, confidential shielding desk, computer shielding desk, shielded desk installation, shielded desk wiring, shielded desk commissioning, shielded desk manufacturer, Guangdong Lain shielding equipment, classified shielding workstation
4. Meta Description
Guangdong Lain Intelligent System Development Co., Ltd. — professional shielded desk manufacturer. Complete shielded desk installation and commissioning manual covering product introduction, technical parameters, working principles, installation procedures, wiring specifications, commissioning methods, maintenance, fault troubleshooting, and acceptance standards. Class B/Class A shielding effectiveness compliant, suitable for government, military, financial, and other classified scenarios.
5. H1 Tag
Shielded Desk Installation, Wiring, and Commissioning Manual
6. H2 Tags
Product Introduction, Product Composition, Product List, Product Working Principles, Product Technical Parameters, Product Functions and Features, Product Application Scenarios, Product Installation, Product Wiring, Product Commissioning, Product Precautions, Product Repair and Maintenance, Product Common Problems and Solutions, Product QA/FAQ, Product Acceptance, After-Sales Service and Technical Support
III. Internal Link Optimization Anchor Text System
1. Core Anchor Text (Natural Placement)
Shielded desk, electromagnetic shielded desk, confidentiality shielding equipment, shielding effectiveness testing, electromagnetic leakage protection
2. Long-Tail Anchor Text (Natural Placement)
Shielded desk installation methods, shielded desk wiring specifications, shielded desk commissioning procedures, shielded desk maintenance, shielded desk common faults, shielded desk acceptance standards
3. Related Anchor Text (Natural Placement)
Shielded cabinet, shielding server room, electromagnetic shielded enclosure, confidential room construction, TEMPEST protection, classified information system graded protection
Copyright Notice
The copyright of this document (*Shielded Desk Installation, Wiring, and Commissioning Manual*) belongs to Guangdong Lain Intelligent System Development Co., Ltd. and is protected by national copyright laws and regulations.
No unit or individual may copy, republish, adapt, excerpt, disseminate, or commercially use any part of this document in any form without written authorization from our company, including but not limited to text reproduction, image citation, content decomposition and republication, and uploading to third-party platforms.
Authorized reproduction or citation of this document’s content must indicate the source as “Source: Guangdong Lain Intelligent System Development Co., Ltd.” and must not distort, tamper with, or abridge the content, nor use it for commercial profit purposes.
Our company reserves the final right of interpretation and revision of this document. Content changes resulting from product technology upgrades or standard updates will be updated periodically without separate notice.
Our company will pursue legal liability for any copyright infringement in accordance with the law to protect our legitimate rights and interests.