Table of Contents
ToggleCables Run Vertically. Give Them a Home.
Patch cables run from the patch panel down to the switch. Without a vertical manager, they hang loose across the equipment. A cable management ring clips to the post and holds them in a neat bundle.
Installation Steps
- Install cage nuts on the post at the desired U positions (left or right side of the rack).
- Hold the cable management ring against the post.
- Insert M6 screws through the ring into the cage nuts.
- Tighten. The ring should be rigid, not floppy.
- Start routing cables: bundle them with velcro straps, clip into the ring.
Placement Tips
- One ring per U position on the cable side of the rack.
- Keep data cables separate from power cables (use a ring on the other post).
- Don’t overfill – leave room for growth.
KITOZER / Guangzhou Laian Intelligent System Development Co., Ltd. – cable management, rack accessories. Call +86 13922289957 (WeChat) or +86 18520668845. WhatsApp +86 19068534140. Web: www.gdlain.com | www.lain.com.cn. Address: Chaotian Park, Zhongrun Industrial Zone, Shilou, Panyu, Guangzhou, China.