Warning: Undefined variable $taxonomy in /www/wwwroot/gdlain.com/public_html/wp-content/mu-plugins/gdlain-breadcrumb-jsonld.php on line 31

Warning: Undefined variable $taxonomy in /www/wwwroot/gdlain.com/public_html/wp-content/mu-plugins/gdlain-breadcrumb-jsonld.php on line 32

Warning: Undefined variable $taxonomy in /www/wwwroot/gdlain.com/public_html/wp-content/mu-plugins/gdlain-breadcrumb-jsonld.php on line 31

Warning: Undefined variable $taxonomy in /www/wwwroot/gdlain.com/public_html/wp-content/mu-plugins/gdlain-breadcrumb-jsonld.php on line 32

Warning: Undefined variable $taxonomy in /www/wwwroot/gdlain.com/public_html/wp-content/mu-plugins/gdlain-breadcrumb-jsonld.php on line 31

Warning: Undefined variable $taxonomy in /www/wwwroot/gdlain.com/public_html/wp-content/mu-plugins/gdlain-breadcrumb-jsonld.php on line 32

Warning: Undefined variable $taxonomy in /www/wwwroot/gdlain.com/public_html/wp-content/mu-plugins/gdlain-breadcrumb-jsonld.php on line 31

Warning: Undefined variable $taxonomy in /www/wwwroot/gdlain.com/public_html/wp-content/mu-plugins/gdlain-breadcrumb-jsonld.php on line 32

Warning: Undefined variable $taxonomy in /www/wwwroot/gdlain.com/public_html/wp-content/mu-plugins/gdlain-breadcrumb-jsonld.php on line 31

Warning: Undefined variable $taxonomy in /www/wwwroot/gdlain.com/public_html/wp-content/mu-plugins/gdlain-breadcrumb-jsonld.php on line 32
KITOZER
KITOZER

370MHz ePDT Solar-Integrated Ad-Hoc Emergency Base Station

Table of Contents

Technical Design Solution

1. Cover / Document Information

– Document Title: 370MHz ePDT Solar-Integrated Ad-Hoc Emergency Base Station Technical Design Solution

– Project Scale: 120 base station systems

– Prepared by: Guangzhou Lain Intelligent System Development Co., Ltd.

– Brand: KITOZER (Pioneer)

– Date: August 2026

2. Table of Contents Structure

1. Company Introduction

2. Project Overview

3. User Requirement Analysis

4. Overall Design Description

5. System Quotation and Configuration List

6. Detailed Technical Parameters of Each System

7. Core Advantages of the Solution

8. Technical Q&A

9. Construction Schedule Plan

10. Construction Organization Plan

11. After-Sales Service System

12. Technical Training Plan

13. Typical Project Cases

14. SEO Optimization System and Contact Information

15. Technical Q&A Column Website Backend Configuration

3. Company Introduction

3.1 Enterprise Overview

Founded in 2002, Guangzhou Lain Intelligent System Development Co., Ltd. is a high-tech enterprise focusing on computer room infrastructure, intelligent cabinet R&D and industry communication solutions. With more than 20 years of industry experience, the company has built the KITOZER (Pioneer) core brand. Integrating R&D, production, sales, engineering implementation and full-lifecycle after-sales service, the company’s products and solutions cover data center construction, electromagnetic shielding protection, outdoor intelligent equipment protection, environmental and power monitoring, emergency communication systems and other fields, and can provide customized overall solutions for the personalized needs of customers in different industries.

The company has a modern production base and a professional technical R&D team, and has established a complete quality control system and flexible production capability. It has completed more than a thousand engineering projects of various types, serving customers in government, public security, energy, transportation, water conservancy, forestry, education, medical care and many other industries. With stable product quality, professional solution design capability and efficient after-sales service, the company has accumulated a good reputation in the industry and has been widely recognized by many domestic and foreign enterprises and users.

3.2 Core Business Areas

#### 3.2.1 Computer Room Engineering

Provides full-process construction services for IDC data center computer rooms, covering micro-module cold aisle solutions, integrated data cabinet deployment, shielded computer room construction, containerized computer room customization and other businesses, covering all-professional design and construction of electrical systems, HVAC systems, fire protection systems, security monitoring and generic cabling, and can customize computer room construction solutions of different grades according to customer needs.

#### 3.2.2 Intelligent Cabinet Products

Independently researches, develops and produces full-series cabinet products including indoor integrated cabinets, outdoor intelligent protection cabinets, electromagnetic shielding cabinets, shielded operation desks and dispatch control consoles, supporting non-standard size, function and structure customization, adapting to various indoor and outdoor complex application scenarios, providing reliable physical protection for equipment operation.

#### 3.2.3 Environmental and Power Monitoring

Provides intelligent monitoring solutions such as computer room environmental monitoring systems, UPS power monitoring systems, temperature and humidity intelligent control and security linkage systems, realizing unattended O&M and remote centralized management of infrastructure, improving O&M efficiency and reducing O&M costs.

#### 3.2.4 Emergency Communication Systems

For emergency management, forest fire prevention, mountain security, water conservancy inspection and other scenarios, researches and develops 370MHz ePDT digital trunking communication equipment, solar ad-hoc base stations, wireless relay transmission systems and other emergency communication products, providing full-chain services from solution design, product supply to construction commissioning and after-sales O&M, supporting communication guarantee in complex environments.

3.3 Core Enterprise Advantages

#### 3.3.1 Deep Industry Accumulation and Solution Capability

With more than 20 years of industry experience, the company has rich project implementation experience and technical heritage, deeply understands the scenario pain points and usage needs of customers in different industries, and can quickly output solutions that fit practical applications, ensuring the practicality, reliability and economy of projects.

#### 3.3.2 Original Factory Customized Production Capability

The company has its own production factory with flexible customized production capability, can carry out product customized development according to customer on-site environment and functional needs, and all from structural design, hardware configuration to function implementation can be adjusted as needed, highly matching project on-site working conditions. The company can provide three differentiated design solutions free of charge for customer selection reference, ensuring the optimal effect of the solution.

#### 3.3.3 Full-Process Quality Control System

The company has established a complete quality control system. From raw material procurement, production and processing to finished product delivery, there are strict standard comparisons and detailed process requirements. Third-party testing institutions are introduced to safeguard product quality, ensuring delivered products comply with national and industry standards while ensuring punctual and controllable delivery cycles.

#### 3.3.4 All-Weather Professional After-Sales Service

The company has established a 7×24-hour professional service system, providing multi-level services such as online technical consultation, remote fault troubleshooting and on-site door-to-door repair, with dedicated personnel following up on the full lifecycle of projects, responding quickly to customer difficult problems, continuously tracking after-sales quality and ensuring long-term stable system operation.

3.4 Enterprise Basic Information

– Enterprise name: Guangzhou Lain Intelligent System Development Co., Ltd.

– Brand: KITOZER Pioneer

– Founded: 2002

– Industry experience: 20+ years

– Service scope: full chain of solution design, product supply, engineering construction and O&M service

4. Project Background and Objectives

Guangzhou Lain 370MHz ePDT Solar-Integrated Ad-Hoc Emergency Base Station overall render

4.1 Project Background

With the continuous advancement of China’s emergency management system construction, emergency communication guarantee capability in mountainous and remote areas has become a core supporting link for public safety, disaster prevention and mitigation, and forest protection. Traditional communication base stations that rely on public network transmission and utility power supply are highly prone to problems such as optical cable interruption, utility power outage and base station downtime during natural disasters and emergencies, failing to meet the communication needs of emergency command, on-site dispatch and rescue coordination.

Mountain environments have complex terrain, weak public network coverage, difficult utility power laying and frequent thunderstorms, placing extremely high requirements on the independent survivability, environmental adaptability and network self-healing capability of emergency communication systems. To improve emergency communication coverage capability and extreme-scenario survivability in complex mountain environments, this project plans to deploy 120 sets of 370MHz ePDT solar-integrated ad-hoc emergency base stations. Relying on mature ePDT digital trunking technology and distributed Mesh ad-hoc networking technology, it builds a dual-layer communication guarantee system of “normally connected trunking dispatch + network-disconnected self-healing relay”, and adopts a full-solar independent power supply solution to completely get rid of utility power dependence, fully adapting to mountain application scenarios without utility power and with weak transmission links, providing stable and reliable wireless communication support for emergency command, daily patrol and disaster rescue.

4.2 Project Construction Objectives

With “high reliability, strong survivability, easy deployment and low O&M” as the core construction objectives, including:

– Full-area trunking coverage: build a 370MHz ePDT digital trunking communication network covering the target area, meeting the business needs of daily voice dispatch, short data transmission and command issuance, compatible with standard ePDT digital trunking terminals, realizing unified command and dispatch;

– Network-disconnected self-healing guarantee: the base station has dual-mode working capability; when the backhaul link to the core network is interrupted, it automatically switches to wireless ad-hoc relay mode without manual intervention, forming a centerless distributed communication network with surrounding base stations, ensuring uninterrupted terminal communication in the area;

– Off-grid independent power supply: adopt a full-solar independent power supply solution with large-capacity energy storage batteries, realizing long-term stable operation in scenarios without utility power, meeting the emergency endurance needs of continuous rainy days, and saving the high cost and construction difficulty of utility power laying;

– Mountain environment adaptation: all equipment is specially designed for complex mountain environments, with high protection level, wide temperature working range, strong lightning and wind resistance, corrosion and aging resistance, adapting to harsh working conditions such as high and low temperature, high humidity, frequent thunderstorms, strong wind and strong ultraviolet in mountain areas;

– Centralized remote O&M: build a unified remote O&M management platform, realizing centralized status monitoring, active fault alarm, remote parameter configuration and operation data statistics of 120 base stations, greatly reducing mountain O&M difficulty and cost.

4.3 Project Construction Scale

This project deploys a total of 120 sets of 370MHz ePDT solar-integrated ad-hoc emergency base stations. Each base station is an independent and complete operating unit, including digital trunking base station host, ad-hoc relay unit, RF antenna feeder system, solar power supply and energy storage system, pole tower installation structure, lightning protection grounding system, backhaul and O&M unit and other complete equipment. It can independently complete all functions such as trunking access, relay forwarding and power supply endurance. A single station failure does not affect the overall network operation.

5. User Requirement Analysis

5.1 Core Functional Requirements

#### 5.1.1 ePDT Digital Trunking Remote Station Function

The base station must support the standard ePDT digital trunking protocol, work in the 370MHz dedicated frequency band, and in normal networked state serve as a trunking remote station accessing the core network, providing services such as voice trunking, short data transmission and dispatch command issuance, supporting group call, individual call, full call, emergency call and other trunking call modes, meeting the business needs of daily command dispatch and emergency communication.

#### 5.1.2 Network-Disconnected Automatic Switching to Ad-Hoc Relay Function

The base station must have dual-mode seamless switching capability with a built-in link detection mechanism. When it detects in real time that the backhaul link to the trunking core network is interrupted, it automatically switches to wireless ad-hoc conventional relay mode without manual intervention. After switching, the base station and surrounding same-type base stations form a Mesh ad-hoc network through the 370MHz band, realizing multi-hop relay forwarding of voice and data, ensuring the continuity of terminal communication in the area. When the backhaul link recovers and stabilizes, the base station automatically switches back to trunking remote station mode, and the whole switching process is transparent to terminal users.

#### 5.1.3 Full-Solar Independent Power Supply and Energy Storage Function

The base station must adopt a solar photovoltaic power supply solution with lithium iron phosphate energy storage batteries, completely independent of utility power. A built-in intelligent MPPT charge/discharge management system maximizes photovoltaic energy utilization and battery safety management, ensuring 24-hour uninterrupted power supply of base station equipment. Considering the frequent rainy weather in mountain areas, sufficient capacity energy storage batteries must be equipped to meet the full-load operation needs of the base station for multiple consecutive days without sunlight.

#### 5.1.4 Remote Centralized O&M Management Function

It must support remote centralized monitoring of all base stations’ operating status, working mode, RF parameters, power supply status, battery level and alarm information, and actively report alarm information when faults occur. Remote parameter configuration, firmware upgrade and mode switching are supported, reducing the frequency and difficulty of mountain on-site O&M.

5.2 Performance Indicator Requirements

– Working frequency band: 370MHz±5MHz, conforming to digital trunking frequency band planning requirements;

– Transmit power: 25-40W adjustable in trunking mode; relay forwarding power ≥20W in ad-hoc relay mode;

– Receive sensitivity: digital service receive sensitivity ≤-122dBm, ensuring communication quality in weak signal environments;

– Relay performance: ad-hoc single-hop forwarding delay ≤50ms, supporting at least 8-hop multi-hop relay;

– Endurance capability: at full charge, the base station can work continuously at full load for ≥48 hours; unlimited endurance under normal light conditions;

– Switching delay: automatic switching time between trunking mode and ad-hoc mode ≤3 seconds;

– Reliability indicator: system mean time between failures (MTBF) ≥100000 hours.

5.3 Environmental Adaptation Requirements

– Outdoor protection: all outdoor electronic equipment protection level not lower than IP65, exposed parts such as antennas not lower than IP67, with waterproof, dustproof and UV-aging resistance;

– Wide temperature operation: equipment working temperature range covers -40°C ~ +65°C, storage temperature range covers -45°C ~ +85°C, adapting to winter low temperature and summer high temperature environments in mountain areas;

– Wind resistance: structural parts such as antennas, poles and photovoltaic brackets must meet the wind resistance strength requirements of typhoons above grade 12;

– Lightning protection: aiming at the frequent thunderstorm climate in mountain areas, build a three-level lightning protection system of RF, power and structure, with grounding resistance meeting the safety requirements of mountain geological conditions;

– Corrosion resistance: all metal structural parts adopt hot-dip galvanized anti-corrosion treatment or 304 stainless steel material, adapting to the high-humidity, foggy and easily corrosive mountain environment.

5.4 Construction and O&M Requirements

– The base station adopts modular design with lightweight component splitting, convenient for mountain transport and rapid installation, reducing on-site construction difficulty;

– The system has complete self-diagnosis and self-alarm capability, convenient for O&M personnel to quickly locate faults;

– A reasonable proportion of spare parts and professional O&M tools are provided to guarantee rapid fault repair and daily maintenance.

6. Design Principles and Applicable Standards

6.1 Design Principles

#### 6.1.1 Reliability First Principle

The core value of an emergency communication system is reflected in its usability in extreme scenarios. This solution takes reliability as the primary design principle, carrying out redundant reinforcement from multiple dimensions such as equipment selection, architecture design, power supply guarantee, protection design and lightning protection design, ensuring the system operates stably in harsh environments and emergencies, and never disconnects at critical moments.

#### 6.1.2 Combination of Advancement and Practicality

Mature and advanced ePDT digital trunking technology and Mesh ad-hoc networking technology are adopted, ensuring the technical lifecycle and functional scalability of the system. At the same time, fully combining the actual use scenarios of mountain emergency communication, over-design and functional redundancy are avoided, ensuring the solution is implementable, easy to use and easy to maintain, achieving the optimal balance of performance and cost.

#### 6.1.3 Independent Survivability Design

Each base station is an independent and complete operating unit, with autonomous operation capability in power supply, transmission and function, not relying on central nodes and external infrastructure. A single station failure does not affect the overall network operation, and relay communication services can still be independently provided in network-disconnected and power-outage scenarios, realizing a truly distributed high-reliability network.

#### 6.1.4 Scalability and Compatibility

The system supports station quantity expansion, single-station carrier expansion and terminal capacity expansion, is compatible with standard ePDT digital trunking terminals and ad-hoc terminals, can seamlessly connect with the user’s existing trunking system, and fully protects the user’s early investment.

#### 6.1.5 Economy and Efficiency Principle

On the premise of meeting performance and reliability requirements, optimize system configuration and reduce construction cost. Through the solar power supply solution, the high cost of utility power laying is saved; through remote O&M, long-term manual O&M costs are reduced; through high-reliability design, fault repair costs are reduced, achieving high cost-effectiveness throughout the lifecycle.

6.2 Design Basis and Standards

This solution strictly follows relevant national and industry standards and specifications for design, mainly including:

– Code for Engineering Design of Digital Trunking Communication Systems

– Technical Specification for Public Security Digital Trunking (ePDT) System

– Code for Engineering Design of Mobile Communication Repeater Stations

– Technical Requirements and Test Methods for Wireless Mesh Ad-Hoc Network Systems

– GB 50797-2012 Code for Design of Photovoltaic Power Stations

– GB 50689-2011 Code for Engineering Design of Lightning Protection and Grounding for Communication Bureau Stations

– YD/T 1537-2021 Technical Requirements and Test Methods for Outdoor Communication Cabinets

– GB/T 9410-2008 General Technical Specification for Mobile Communication Antennas

– GB 50017-2017 Standard for Design of Steel Structures

– GB 50057-2010 Code for Design Protection of Structures Against Lightning

– Emergency Communication Guarantee System Construction Guide

7. System Architecture and Working Principle

7.1 Overall System Architecture

Each 370MHz ePDT solar-integrated ad-hoc emergency base station is composed of nine subsystems that work together to realize complete base station functions:

1. ePDT digital trunking base station core system: the core processing unit of the base station, realizing ePDT digital trunking protocol processing, channel coding/decoding, signaling exchange and service scheduling;

2. Wireless ad-hoc relay system: realizing Mesh ad-hoc protocol processing, dynamic route calculation and signal relay forwarding, responsible for distributed communication guarantee after network disconnection;

3. RF antenna feeder system: responsible for transmission and reception of wireless signals, including omnidirectional antenna, low-loss feeder, RF connectors, feeder lightning arresters and other components;

4. Solar independent power supply system: the energy source of the base station, including monocrystalline silicon photovoltaic modules, MPPT solar controller, lithium iron phosphate energy storage battery pack, DC distribution unit, etc.;

5. Pole tower and installation protection structure: carries all outdoor equipment and provides physical protection, including quick-install guyed poles, base station equipment protection boxes, battery insulation protection boxes, installation clamps, etc.;

6. Lightning protection grounding system: guarantees equipment and personnel safety, including air-termination lightning rods, vertical grounding electrodes, horizontal grounding flat steel, grounding down conductors, equipotential terminals, etc.;

7. Backhaul transmission system: realizes the connection between base station and core network, using industrial-grade wireless backhaul modules supporting public network data backhaul;

8. Remote O&M management system: realizes centralized monitoring and management of base stations, including site-end O&M units and backend management platform;

9. Engineering auxiliary materials system: including installation fixing, waterproof sealing, cable binding, label management and other construction supporting materials.

7.2 Working Modes and Switching Mechanism

#### 7.2.1 Normal Networking: Trunking Remote Station Mode

When the backhaul link is normal, the base station works in ePDT digital trunking remote station mode and accesses the trunking core network through the backhaul link. After terminals access the base station, full-network trunking dispatch services can be realized, including cross-base-station group call, individual call, full call, emergency call, short data transmission, location reporting, etc., and the base station accepts unified management and dispatch of the core network.

In this mode, the ad-hoc unit is in standby monitoring state, detecting the connectivity and quality of the backhaul link in real time, ready to switch working modes at any time.

#### 7.2.2 Network-Disconnected Emergency: Ad-Hoc Relay Mode

When the base station detects backhaul link interruption and loss of connection with the core network, the mode switching control unit automatically triggers mode switching, and the base station enters wireless ad-hoc conventional relay mode within 3 seconds.

In this mode, the base station and surrounding same-type base stations form a centerless Mesh ad-hoc network through the 370MHz band. Terminals accessing any base station can communicate with other terminals in the network through multi-hop relay, ensuring uninterrupted communication for on-site emergency command and coordination. The ad-hoc network supports dynamic route calculation; when a base station fails or is blocked, traffic automatically switches to other optimal paths without affecting overall network connectivity.

#### 7.2.3 Automatic Recovery and Manual Switching

When the backhaul link recovers and operates stably, the base station automatically detects the link status, confirms it is correct, and automatically switches back to trunking remote station mode, restoring full-network trunking services. The whole switching process requires no manual intervention and is transparent to terminal users.

At the same time, the system supports manual forced switching mode. O&M personnel can force switching of working modes through local operation or remote commands, convenient for O&M debugging and command needs in special emergency scenarios.

8. Detailed Technical Design

8.1 ePDT Digital Trunking Base Station Core System Design

The base station host is the core of the whole system, integrating the main control processing board, digital channel machine and DC power module in a compact IP65 die-cast aluminum alloy housing:

– Trunking remote station function: when the backhaul link is normal, the host accesses the core network through the industrial-grade wireless backhaul module as an ePDT trunking remote station, providing group call, individual call, full call, emergency call, short data and location reporting services;

– Dual-mode design: the host embeds the ad-hoc baseband processing unit and RF front-end module; when the backhaul link is interrupted, the mode switching control unit automatically switches to ad-hoc relay mode within 3 seconds, forming a Mesh network with surrounding base stations;

– TDMA dual-slot: each carrier supports 2 concurrent voice services plus short data services, meeting the dispatch needs of an emergency communication group;

– Security: supports AES128-bit air interface encryption and terminal authentication, preventing illegal terminal access and eavesdropping.

8.2 Wireless Ad-Hoc Relay System Design

– The ad-hoc baseband processing unit adopts DSP+FPGA architecture, runs a private centerless Mesh ad-hoc protocol, and supports AODV dynamic routing with automatic route discovery and maintenance;

– Supports ≥8-hop multi-hop relay with single-hop delay ≤50ms, and a single network supports ≥64 nodes;

– The RF front-end module works in the 370MHz band shared with the trunking system, with 20W relay forwarding power and ≤-120dBm receive sensitivity;

– When a node fails or is blocked, traffic automatically switches to the optimal path, ensuring no single point of failure;

– The mode switching control unit uses dual mechanisms of periodic heartbeat detection (100ms period) and traffic detection; three consecutive detection failures trigger switching, avoiding false switching; supports local button and remote command manual switching.

8.3 RF Antenna Feeder System Design

– 370MHz omnidirectional fiberglass antenna: 8dBi gain, vertical polarization, 360° omnidirectional horizontal coverage, 18° vertical beam width, VSWR ≤1.5, max power 200W, IP67, wind resistance above grade 12;

– Low-loss feeder: 1/2-inch ultra-flexible RF coaxial cable, 50Ω, silver-plated copper-clad steel inner conductor, double-layer shielding with shielding effectiveness ≥90dB, loss ≤6dB/100m @370MHz;

– Feeder surge arrester: DC-1000MHz, 50Ω, insertion loss ≤0.2dB, nominal discharge current 10kA (8/20μs), max 20kA, response ≤1ns, IP67;

– N-type waterproof RF connectors: 50Ω, contact resistance inner ≤1mΩ / outer ≤0.5mΩ, withstand 1500V AC, VSWR ≤1.15, ≥500 insertions, IP67 after connection;

– Antenna fixing clamps: for φ30-80mm poles, 304 stainless steel.

8.4 Solar Independent Power Supply System Design

– Monocrystalline silicon photovoltaic modules: 550W peak power, conversion efficiency ≥23%, N-type monocrystalline cells, 144 cells (12×12), 3.2mm high-transmittance tempered glass, 6063-T5 anodized aluminum frame, IP68 junction box with bypass diodes, mechanical load 5400Pa front / 2400Pa back, hail-resistant; 2 modules per station with total power 1100W;

– MPPT solar controller: DC48V auto-identification, 30A rated charging current, PV input 12-96V, max 1500W PV input, MPPT tracking efficiency ≥99%, conversion efficiency ≥97.5%, four-stage charging (trickle, constant current, constant voltage, float), compatible with lithium iron phosphate and lead-acid batteries, RS485 communication;

– Lithium iron phosphate energy storage battery pack: 48V 200Ah, 9.6kWh rated energy, 16-series 4-parallel LFP cells, cycle life ≥6000 times (0.5C, 80% remaining capacity), built-in intelligent BMS with active balancing (≥50mA), low-temperature heating (auto-start below -5°C), overcharge/over-discharge/overcurrent/short-circuit/overtemperature/low-temperature protection, RS485 reporting voltage/current/temperature/SOC/SOH, IP65;

– DC distribution unit: DC48V, 63A, 1 PV input + 1 battery input, 4 load outputs with independent protection, DC air switch + DC fuse double protection, insulation voltage 2000V AC;

– PV dedicated DC cable: PV1-F 4mm², UV-resistant, flame-retardant, low-temperature resistant; power connection cable: RVV 2×6mm² copper flame-retardant outdoor weather-resistant type; DC power lightning arrester: DC48V, 20kA throughput, response ≤25ns.

8.5 Pole Tower and Installation Protection Structure Design

– Mountain quick-install guyed pole: total height 6m, 3-section assembled structure (2m per section), φ114mm×3.5mm hot-dip galvanized seamless steel pipe, Q235B, 3 sets of galvanized steel wire rope guys (8mm diameter) at 120° uniform distribution with turnbuckles and tensioners, wind resistance grade 12 typhoon, total load-bearing ≥150kg (antenna + equipment box + PV modules), bottom flange fixing + guy reinforcement, single pole weight about 65kg;

– Base station equipment protection box: 600×500×300mm, 1.5mm cold-rolled steel, outdoor powder coating, IP65, three-point anti-theft lock with waterproof cover, side ventilation grilles with dust screens, internal mounting rails ×2, grounding copper bar ×1, cable holes ×4, for φ80-120mm poles;

– Battery insulation protection box: 800×600×500mm, outer 1.5mm cold-rolled steel + inner galvanized plate, 50mm polyurethane foam insulation layer (thermal conductivity ≤0.024W/(m·K)), IP65, optional PTC low-temperature heating with temperature-controlled auto start/stop, internal battery fixing bracket, grounding terminal and waterproof cable holes, internal temperature ≥0°C in low-temperature environments;

– Pole mounting clamps: galvanized steel, for φ80-120mm poles; guy anchor kits: hot-dip galvanized anchors 1.2m with steel wire ropes and tensioners.

8.6 Lightning Protection Grounding System Design

A three-level lightning protection system of RF, power and structure is built:

– Air-termination lightning rod: total height 1.5m, pure copper tip tin-plated, hot-dip galvanized round steel rod φ16mm, flange base 4-hole fixing, protection angle ≤45°, throughput ≥100kA, double-layer anti-corrosion of hot-dip galvanizing + copper plating;

– Vertical grounding electrodes: Q235B hot-dip galvanized angle steel 50×50×5mm, length 2.5m, pointed end, welded connection with anti-corrosion treatment at welds, single electrode grounding resistance ≤30Ω, 4 electrodes combined ≤10Ω, service life ≥30 years;

– Horizontal grounding flat steel: Q235B hot-dip galvanized flat steel 40×4mm, lap welding with lap length ≥2× flat steel width, ring layout connecting vertical electrodes, buried depth ≥0.8m;

– Grounding down conductors: BV-16mm² stranded copper insulated wire; equipotential grounding terminals: copper, adapting multiple cable specifications;

– The antenna-side feeder arrester protects against induced lightning along the RF line; the equipment-side DC power arrester protects against induced lightning along the power line; all equipment housings and metal structures are reliably grounded, forming a complete lightning protection system.

8.7 Backhaul and O&M Supporting Design

– Industrial-grade wireless backhaul module: 5G/4G full-network compatible, downward compatible with 3G/2G, downlink ≥100Mbps / uplink ≥50Mbps, RJ45 Ethernet port + RS232 serial port, SMA antenna interfaces ×2, DC12V, ≤10W, IP65, auto-reconnect on disconnection, watchdog, VPN support;

– Remote O&M management unit: collects base station working status, transmit power, receive level, working mode, supply voltage, battery level and temperature data; alarm functions include fault, offline, low battery, overtemperature and abnormal VSWR alarms; communicates via 4G/5G wireless with MQTT protocol support; supports remote power modification, mode switching and firmware upgrade; local storage ≥30 days of operation data; DC12V, ≤5W, -40°C ~ +85°C.

9. Recommended Configuration and Preliminary Budget

9.1 Single-Station Configuration and 120-Station Summary

This list is compiled according to the standard single-station configuration, with the total quantity calculated for 120 base stations, adapted to mountain emergency communication scenarios.

I. ePDT Digital Trunking Base Station Core System

No. Equipment Specification Unit Per station Total (120) Remarks
1 370MHz ePDT digital trunking remote base station host Conforms to ePDT standard, single carrier, dual-mode switching, IP65 set 1 120 Base station core unit, pole-mounted
2 Base station main control processing board Industrial embedded main control, trunking protocol processing, mode switching control pcs 1 120 Built-in core board of host
3 370MHz digital channel machine Transmit power 40W adjustable, receive sensitivity ≤-122dBm, TDMA dual-slot pcs 1 120 Single carrier, expandable
4 Base station DC power module DC48V input, 300W output, full electrical protection pcs 1 120 Built-in power unit of host

II. Wireless Ad-Hoc Relay System

No. Equipment Specification Unit Per station Total (120) Remarks
1 Ad-hoc baseband processing unit Mesh protocol, dynamic routing, auto activation on network disconnection pcs 1 120 Embedded in base station host
2 Ad-hoc RF front-end module 370MHz band, 20W forwarding power, high receive sensitivity pcs 1 120 With baseband unit
3 Mode switching control unit Real-time link detection, automatic/manual switching, switching delay ≤3s set 1 120 Hardware + embedded software

III. RF Antenna Feeder System

No. Equipment Specification Unit Per station Total (120) Remarks
1 370MHz omnidirectional fiberglass antenna Gain 8dBi, vertical polarization, IP67, wind resistance grade 12 set 1 120 Hilltop omnidirectional coverage
2 Low-loss RF feeder 50Ω 1/2-inch ultra-flexible feeder, loss ≤6dB/100m m 20 2400 Host to antenna connection
3 Feeder surge arrester 350-400MHz, insertion loss ≤0.2dB, 10kA throughput pcs 1 120 Antenna-side lightning protection
4 N-type waterproof RF connector 50Ω male/female, IP67 pcs 4 480 Both feeder ends
5 Antenna fixing clamp For φ30-80mm poles, 304 stainless steel set 2 240 Antenna fixing

IV. Solar Independent Power Supply System (48V DC System)

No. Equipment Specification Unit Per station Total (120) Remarks
1 Monocrystalline silicon PV module 550W, conversion efficiency ≥23%, IP68 pcs 2 240 Total power 1100W
2 PV mounting bracket 6061 aluminum alloy, adjustable angle, pole/ground mounting set 1 120 For 2 modules
3 MPPT solar controller 48V system, 30A charging current, MPPT efficiency ≥99% set 1 120 Intelligent charge/discharge management
4 Lithium iron phosphate battery pack 48V 200Ah, built-in BMS, IP65, low-temperature compensation set 1 120 48h full-load endurance
5 DC distribution unit 48V input, multi-output, air switch + fuse protection set 1 120 Distribution and fault isolation
6 PV dedicated DC cable PV1-F 4mm², UV-resistant flame-retardant low-temperature m 30 3600 Module to controller
7 Power connection cable RVV 2×6mm² copper flame-retardant, outdoor weather-resistant m 15 1800 Inter-equipment power connection
8 DC power lightning arrester DC48V, 20kA throughput, response ≤25ns pcs 1 120 Equipment-side power lightning protection

V. Pole Tower and Installation Protection Structure

No. Equipment Specification Unit Per station Total (120) Remarks
1 Mountain quick-install guyed pole Height 6m, hot-dip galvanized steel pipe, 3 guy sets, sectional assembly pcs 1 120 Carries antenna and equipment
2 Base station equipment protection box Cold-rolled steel powder coated, IP65, with heat dissipation and anti-theft lock pcs 1 120 Houses host and controller
3 Battery insulation protection box Polyurethane insulation layer, IP65, outdoor thermal protection pcs 1 120 Battery low-temperature protection
4 Pole mounting clamp Galvanized steel, for φ80-120mm poles set 4 480 Box fixing
5 Guy anchor kit Hot-dip galvanized anchor 1.2m, with steel wire rope and tensioner set 3 360 Guy ground fixing

VI. Lightning Protection Grounding System

No. Equipment Specification Unit Per station Total (120) Remarks
1 Air-termination lightning rod Pure copper tip, hot-dip galvanized rod, height 1.5m pcs 1 120 Pole top air termination
2 Vertical grounding electrode Hot-dip galvanized angle steel 50×50×5mm, length 2.5m pcs 4 480 Ring grounding grid
3 Horizontal grounding flat steel Hot-dip galvanized flat steel 40×4mm m 20 2400 Connects electrodes
4 Grounding down conductor BV-16mm² stranded copper insulated wire m 10 1200 Equipment to ground grid
5 Equipotential grounding terminal Copper, adapting multiple cable specifications pcs 6 720 Grounding connection at each point

VII. Backhaul and O&M Supporting

No. Equipment Specification Unit Per station Total (120) Remarks
1 Industrial-grade wireless backhaul module 5G/4G full-network, IP65, auto-reconnect on disconnection set 1 120 Trunking backhaul link
2 IoT data SIM card Annual data package, industrial-grade stable pcs 1 120 Backhaul communication fee
3 Remote O&M management unit Status monitoring, fault alarm, remote configuration set 1 120 Embedded in host

VIII. Engineering Installation Auxiliary Materials

No. Equipment Specification Unit Per station Total (120) Remarks
1 304 stainless steel cable tie Width 12mm, length 300mm, outdoor anti-corrosion pack 2 240 Cable binding and fixing
2 Communication-grade waterproof kit Waterproof mastic + waterproof tape, joint sealing set 1 120 Outdoor joint waterproofing
3 Galvanized expansion bolt M12×150mm set 10 1200 Anchor and box fixing
4 Cable management accessory kit Cable clips, ties, label plates, waterproof and sun-proof lot 1 120 In-box organization and labeling

IX. Spare Parts and Debugging Tools

No. Equipment Specification Unit Total Remarks
1 ePDT digital channel machine Same as main equipment pcs 6 5% proportion
2 MPPT solar controller Same as main equipment set 6 5% proportion
3 370MHz omnidirectional antenna Same as main equipment set 6 5% proportion
4 Feeder lightning arrester Same as main equipment pcs 12 10% proportion
5 O&M debugging tool kit RF power meter, grounding resistance tester, special tools set 3 On-site debugging and O&M

Reference estimate note: The configuration list above is provided for engineering planning purposes. The final quotation is a reference estimate in RMB (CNY) and does not constitute a formal commercial quotation from Guangzhou Lain; final pricing depends on actual requirements, quantities and site conditions.

10. Technical Specifications

Reference estimate note: All specifications below are reference estimates in RMB (CNY) and do not constitute a formal commercial quotation from Guangzhou Lain. Final pricing depends on actual requirements, quantity and site conditions.

10.1 ePDT Digital Trunking Base Station Core System

#### 10.1.1 370MHz ePDT Digital Trunking Remote Base Station Host

Basic parameters

– Model: KITOZER-370-ePDT-BS

– Working frequency band: uplink 370MHz-375MHz, downlink 360MHz-365MHz, band customization supported;

– Channel spacing: 12.5kHz; modulation: 4FSK; multiple access: TDMA dual-slot;

– Carrier configuration: single carrier, expandable to dual carrier;

– Working modes: trunking remote station mode / ad-hoc relay mode, automatic and manual switching supported;

– Switching delay: ≤3 seconds; concurrent services: 2 concurrent voice services + short data services;

– Protocol: fully conforms to ePDT digital trunking air interface protocol, supporting authentication and encryption.

RF transmit parameters

– Nominal transmit power: 40W/25W two levels adjustable, step 1dB;

– Frequency stability: ±0.5ppm (full temperature range);

– Modulation accuracy: frequency error ≤5%, amplitude error ≤10%;

– Adjacent channel power ratio: ≥65dB; intermodulation attenuation: ≥70dB;

– Spurious emission: ≤-36dBm (below 1GHz), ≤-30dBm (above 1GHz);

– Transmit startup time: ≤10ms; power control range: 20dB continuously adjustable; power control accuracy: ±1dB.

RF receive parameters

– Reference sensitivity: ≤-122dBm (BER 5%);

– Adjacent channel selectivity: ≥70dB; intermodulation rejection: ≥65dB; blocking rejection: ≥90dB;

– Spurious response rejection: ≥75dB; audio distortion: ≤3%; audio output level: 0.1-1Vrms adjustable;

– Receive dynamic range: ≥80dB; AGC supported, range ≥60dB.

Hardware interfaces

– RF interface: N-type female, 50Ω; backhaul: RJ45 Ethernet ×1, RS232 serial ×1;

– Power interface: waterproof aviation connector, DC48V input; debug interface: Type-C ×1;

– Antenna interface: N-type female, on top of equipment.

Environment and reliability

– Protection level IP65; working temperature -40°C ~ +65°C; storage -45°C ~ +85°C;

– Relative humidity 5% ~ 95% non-condensing;

– Vibration per GB/T 2423.10; impact per GB/T 2423.5; MTBF ≥100000 hours.

Mechanical structure

– Die-cast aluminum alloy housing, surface powder coated anti-corrosion;

– Pole mounting / wall mounting; natural heat dissipation, fanless design;

– Dimensions 320×220×120mm; weight about 5.8kg.

#### 10.1.2 Base Station Main Control Processing Board

– Processor: industrial-grade ARM Cortex-A7 quad-core, 1GHz;

– Memory: DDR3 1GB; storage: eMMC 8GB for parameters and logs;

– OS: embedded Linux real-time operating system;

– Core functions: ePDT protocol stack processing, call control, link management, mode switching control, O&M management;

– Interfaces: UART×3, SPI×2, I2C×2, GPIO×16;

– Working voltage DC12V; temperature -40°C ~ +85°C; onboard watchdog.

#### 10.1.3 370MHz Digital Channel Machine

– Working band 370MHz±5MHz; transmit power 40W max, software adjustable;

– Receive sensitivity ≤-122dBm; single channel with slot division;

– Modulation GMSK/4FSK; bandwidth 12.5kHz; supply DC12V;

– Power consumption ≤80W transmitting, ≤15W receiving;

– Protections: overtemperature, over-power, abnormal VSWR.

#### 10.1.4 Base Station DC Power Module

– Input DC36V~60V (48V system); output DC12V/5V multiple channels;

– Rated output 300W; conversion efficiency ≥92%; ripple noise ≤100mVpp;

– Protections: input overvoltage/undervoltage, output overcurrent/short-circuit, reverse connection, overtemperature;

– Isolation voltage 1500V DC; temperature -40°C ~ +85°C; MTBF ≥500000 hours.

10.2 Wireless Ad-Hoc Relay System

#### 10.2.1 Ad-Hoc Baseband Processing Unit

– Processor: high-performance DSP+FPGA architecture;

– Protocol: private Mesh ad-hoc protocol, centerless distributed networking;

– Routing: AODV dynamic routing, automatic route discovery and maintenance;

– Max hops: ≥8-hop multi-hop relay; single-hop delay ≤50ms;

– Networking scale: single network supports ≥64 nodes;

– Services: voice and short data; switching: auto trigger on network disconnection, auto fallback on backhaul recovery;

– Encryption: AES128 air interface encryption; DC12V; ≤15W; -40°C ~ +85°C.

#### 10.2.2 Ad-Hoc RF Front-End Module

– Working band 370MHz±5MHz, shared with trunking system;

– Transmit power 20W nominal; receive sensitivity ≤-120dBm;

– AGC range ≥60dB; noise figure ≤2.5dB; adjacent channel rejection ≥60dB;

– VSWR protection: auto power reduction when VSWR >2; N-type RF interface; DC12V; -40°C ~ +85°C.

#### 10.2.3 Mode Switching Control Unit

– Detection mechanism: periodic heartbeat detection + traffic detection dual mechanism; detection period 100ms;

– Switching judgment: 3 consecutive detection failures trigger switching, avoiding false switching;

– Switching method: high-speed electronic switching, no mechanical contacts; switching delay ≤3s;

– Manual switching: local button and remote command; LED status indication; DC12V; -40°C ~ +85°C.

10.3 RF Antenna Feeder System

#### 10.3.1 370MHz Omnidirectional Fiberglass Antenna

– Model: KITOZER-ANT-370-8; band 350-390MHz; center 370MHz;

– Gain 8dBi; vertical polarization; horizontal beam width 360° omnidirectional; vertical beam width 18°;

– Front-to-back ratio ≥20dB; VSWR ≤1.5; max power 200W; impedance 50Ω; N-type female;

– High-strength fiberglass radome, UV-resistant; pure copper radiator silver-plated;

– Pole mounting for φ30-80mm poles; IP67; wind resistance above grade 12; -45°C ~ +70°C;

– Length about 1.8m; weight about 2.5kg.

#### 10.3.2 Low-Loss RF Feeder

– 1/2-inch ultra-flexible RF coaxial cable; characteristic impedance 50Ω±2Ω;

– Inner conductor silver-plated copper-clad steel; insulation physically foamed polyethylene;

– Outer conductor tin-plated copper braid + aluminum foil double shielding; shielding effectiveness ≥90dB;

– Black PVC UV-resistant flame-retardant jacket; loss ≤6dB/100m @370MHz;

– Min bending radius: dynamic 120mm, static 80mm; -40°C ~ +85°C; full-structure waterproof.

#### 10.3.3 Feeder Surge Arrester

– Band DC-1000MHz (350-400MHz optimal); impedance 50Ω;

– Insertion loss ≤0.2dB; VSWR ≤1.1;

– Nominal discharge current 10kA (8/20μs); max 20kA; response ≤1ns;

– N male to N female; brass nickel-plated housing; IP67; series in feeder, grounded nearby; -40°C ~ +85°C.

#### 10.3.4 N-Type Waterproof RF Connector

– 50Ω; for 1/2-inch ultra-flexible feeder; male/female matched;

– Contact resistance inner ≤1mΩ, outer ≤0.5mΩ; insulation resistance ≥5000MΩ; withstand 1500V AC;

– VSWR ≤1.15; mechanical life ≥500 insertions; IP67 after connection;

– Brass gold-plated contacts, nickel-plated housing; rubber seal ring + waterproof mastic double sealing.

10.4 Solar Independent Power Supply System

#### 10.4.1 Monocrystalline Silicon PV Module

– Model: KITOZER-PV-550M; peak power 550W (tolerance 0~+5W); conversion efficiency ≥23%;

– Voc 41.8V; Isc 17.2A; Vmp 34.8V; Imp 15.8A;

– N-type monocrystalline cells, 144 cells (12×12); 3.2mm high-transmittance tempered glass with anti-reflection coating;

– 6063-T5 anodized aluminum frame; weather-resistant composite backsheet; EVA encapsulation;

– IP68 junction box with bypass diodes; MC4-compatible connectors;

– Mechanical load 5400Pa front / 2400Pa back, hail-resistant; IP68; -40°C ~ +85°C;

– Power temperature coefficient -0.34%/°C; 2279×1134×30mm; about 27.5kg;

– Warranty: 10-year power degradation ≤10%, 25-year ≤20%; 10-year material and workmanship warranty.

#### 10.4.2 MPPT Solar Controller

– Model: KITOZER-MPPT-30A; system voltage DC48V auto-identification; rated charging current 30A;

– PV input voltage 12-96V; max PV open-circuit voltage 100V; max PV input power 1500W;

– MPPT tracking efficiency ≥99%; conversion efficiency ≥97.5%; full-voltage-range auto tracking;

– Four-stage charging: trickle, constant current, constant voltage, float;

– Compatible with lithium iron phosphate, lead-acid and other batteries;

– Protections: PV reverse, battery reverse, overcharge, over-discharge, overcurrent, short-circuit, overtemperature;

– RS485 communication; LED + digital display; natural heat dissipation; IP32 (in protection box); -35°C ~ +60°C; 220×130×60mm; about 1.2kg.

#### 10.4.3 Lithium Iron Phosphate Energy Storage Battery Pack

– Model: KITOZER-LFP-48200; nominal voltage 48V; nominal capacity 200Ah; rated energy 9.6kWh;

– LFP cells, 16-series 4-parallel; cycle life ≥6000 times (0.5C, 80% remaining capacity);

– Charge/discharge rate: standard 0.5C, max 1C; charge voltage 54.8V; discharge cutoff 40V;

– Working temperature: charge -10°C~+55°C, discharge -20°C~+60°C;

– Low-temperature heating (auto-start below -5°C); built-in intelligent BMS;

– Protections: overcharge, over-discharge, overcurrent, short-circuit, overtemperature, low-temperature;

– Active balancing ≥50mA; RS485 reporting voltage/current/temperature/SOC/SOH; active alarm on abnormal status;

– Cold-rolled steel powder-coated housing; IP65; horizontal/vertical installation; 520×350×220mm; about 58kg.

#### 10.4.4 DC Distribution Unit

– Rated voltage DC48V; rated current 63A;

– Inputs: 1 PV input + 1 battery input; outputs: 4 load outputs with independent protection;

– DC air switch + DC fuse double protection; insulation voltage 2000V AC;

– IP30 (in protection box); copper bar connection with crimp terminals; per-circuit working indicator;

– DIN-rail + screw installation; -30°C ~ +70°C.

10.5 Pole Tower and Installation Protection Structure

#### 10.5.1 Mountain Quick-Install Guyed Pole

– Total height 6m; 3-section assembly, 2m per section;

– Main material φ114mm×3.5mm hot-dip galvanized seamless steel pipe, Q235B;

– Overall hot-dip galvanized anti-corrosion, zinc layer ≥85μm;

– 3 sets of galvanized steel wire rope guys (8mm diameter) at 120° uniform distribution; with turnbuckles, tensioners and guy rings;

– Wind resistance grade 12 typhoon; load-bearing ≥150kg (antenna + equipment box + PV modules);

– Bottom flange fixing + guy reinforcement; suitable for mountain, rooftop and ground scenarios; single pole about 65kg.

#### 10.5.2 Base Station Equipment Protection Box

– 600×500×300mm; 1.5mm cold-rolled steel; outdoor powder coating, UV and corrosion resistant;

– IP65; three-point anti-theft lock with waterproof cover;

– Side ventilation grilles with built-in dust screens;

– Internal: mounting rails ×2, grounding copper bar ×1, cable holes ×4;

– Pole mounting for φ80-120mm poles; -40°C ~ +70°C; military green/gray optional; about 18kg.

#### 10.5.3 Battery Insulation Protection Box

– 800×600×500mm; outer 1.5mm cold-rolled steel + inner galvanized plate;

– 50mm polyurethane foam insulation layer, thermal conductivity ≤0.024W/(m·K);

– IP65; waterproof anti-theft lock;

– Optional PTC low-temperature heating with temperature-controlled auto start/stop;

– Internal battery fixing bracket, grounding terminal, waterproof cable holes;

– Ground/pole mounting; -40°C ~ +60°C ambient, internal temperature ≥0°C; about 35kg.

10.6 Lightning Protection Grounding System

– Air-termination lightning rod: 1.5m total height; pure copper tip tin-plated; hot-dip galvanized round steel rod φ16mm; flange base 4-hole fixing; protection angle ≤45°; throughput ≥100kA; double-layer anti-corrosion; about 3.5kg;

– Vertical grounding electrode: Q235B hot-dip galvanized angle steel 50×50×5mm, 2.5m, pointed end; welded connection with anti-corrosion treatment; single ≤30Ω, 4 electrodes combined ≤10Ω; life ≥30 years;

– Horizontal grounding flat steel: Q235B hot-dip galvanized 40×4mm; lap welding, lap ≥2× width; ring layout; buried ≥0.8m; life ≥30 years;

– Grounding down conductor: BV-16mm² stranded copper insulated wire; equipotential terminal: copper, multi-spec.

10.7 Backhaul and O&M Supporting

#### 10.7.1 Industrial-Grade Wireless Backhaul Module

– 5G/4G full-network, downward compatible with 3G/2G; domestic full-band coverage;

– Downlink ≥100Mbps, uplink ≥50Mbps;

– RJ45 ×1, RS232 ×1; SMA ×2 with omnidirectional antennas;

– DC12V, ≤10W; IP65; -35°C ~ +75°C;

– Auto-reconnect on disconnection, watchdog, VPN support; DIN-rail/wall mounting.

#### 10.7.2 Remote O&M Management Unit

– Data collection: working status, transmit power, receive level, working mode, supply voltage, battery level, temperature;

– Alarms: fault, offline, low battery, overtemperature, abnormal VSWR;

– Communication: 4G/5G wireless, MQTT protocol; remote power modification, mode switching, firmware upgrade;

– Local storage ≥30 days; DC12V, ≤5W; -40°C ~ +85°C.

11. Key Advantages and Customer Value

11.1 Dual-Mode Seamless Switching, Full-Scenario Communication Guarantee

The base stations of this solution have dual working modes of ePDT trunking remote station and Mesh ad-hoc relay. In normal networking, they access the core network to realize full-network dispatch; when the network is disconnected, they automatically switch to ad-hoc relay mode, realizing uninterrupted communication in the area. The switching delay is ≤3 seconds, the process is smooth and imperceptible, completely solving the communication paralysis problem in extreme scenarios such as public network interruption and optical cable breakage, providing dual guarantees for emergency rescue and mountain patrol.

11.2 Full-Solar Independent Power Supply, Zero Utility Power Dependence

The base station adopts 1100W monocrystalline silicon PV modules with 9.6kWh lithium iron phosphate energy storage batteries, completely independent of utility power, no need to lay utility power lines, greatly reducing the construction cost and difficulty of mountain base stations. The system is equipped with an MPPT intelligent controller to maximize solar energy utilization. At full charge, it can support the base station to work continuously at full load for more than 48 hours, meeting the endurance needs of continuous rainy weather, truly realizing unattended and long-term maintenance-free operation.

11.3 Distributed Mesh Ad-Hoc Networking, Centerless High Reliability

The ad-hoc network adopts a centerless distributed architecture. Any base station failure will not cause overall network paralysis. Routes are dynamically adjusted and data automatically selects the optimal path for transmission. It supports multi-hop relay of more than 8 hops, greatly expanding communication coverage, very suitable for mountainous and forested areas with complex terrain and severe obstruction, realizing multi-point linked coverage.

11.4 Full-Condition Mountain Adaptation Design, Stable Operation in Extreme Environments

All equipment is specially designed for mountain environments: outdoor equipment protection level reaches IP65/IP67, waterproof, dustproof and UV-resistant; working temperature covers -40°C~+65°C, adapting to mountain day-night temperature differences and winter/summer extreme temperatures; poles and brackets resist grade 12 typhoons, coping with mountain strong winds; a complete three-level lightning protection system copes with frequent thunderstorm weather in mountain areas; all-metal structures are hot-dip galvanized for corrosion resistance, adapting to high-humidity and foggy environments. All-dimensional reinforcement ensures long-term stable operation of base stations in harsh mountain environments.

11.5 Modular Quick-Install Design, Reducing Mountain Construction Difficulty

The base station adopts modular design. After splitting, each component is light and small, convenient for manual mountain transport. The pole adopts a sectional assembly structure without large hoisting equipment; equipment is fixed with quick-install clamps, convenient to install; cables have prefabricated connectors for plug-and-play on site. This greatly reduces the difficulty and cycle of mountain construction and improves installation efficiency.

11.6 Full-Lifecycle Remote O&M, Reducing O&M Cost

A unified remote O&M management platform is provided to monitor the operating status, power supply status and fault alarms of 120 base stations in real time, supporting remote parameter configuration and firmware upgrade. O&M personnel can complete daily monitoring and most fault handling without going up the mountain, greatly reducing the number of on-site O&M visits and reducing the labor cost and safety risk of mountain O&M.

11.7 Standard ePDT Compatibility, Protecting Existing Investment

The base station fully conforms to the ePDT digital trunking standard and can seamlessly connect with the user’s existing ePDT terminals and core network without replacing existing terminal equipment, fully protecting the user’s existing investment. At the same time, it supports subsequent station expansion and carrier expansion, and the network can be gradually extended, with good scalability.

11.8 Complete Lightning Protection Grounding System, Guaranteeing Equipment and Personnel Safety

Aiming at the frequent thunderstorm characteristics of mountain areas, the solution designs a complete three-level lightning protection system: antenna-side feeder lightning protection, equipment-side power lightning protection, and structural air-termination grounding. Lightning protection is carried out from the three dimensions of RF, power and structure, combined with a ring grounding grid to quickly discharge lightning current into the earth, effectively protecting base station equipment and personnel safety and reducing lightning fault probability.

12. Technical Q&A (50+ Items)

12.1 Base Station Core System

Q1: How many users can talk simultaneously on a single carrier of a 370MHz ePDT base station?

A: The single-carrier ePDT base station adopts TDMA dual-slot technology. Each carrier is divided into 2 time slots, each carrying one voice call, so a single carrier can support 2 concurrent voice calls simultaneously. For emergency communication and daily dispatch scenarios, a single carrier can meet the dispatch needs of one call group; if more concurrent users are needed, it can be expanded to dual-carrier or multi-carrier configuration.

Q2: Can the transmit power of the base station be adjusted? What is the adjustment range?

A: Yes. The base station transmit power supports software remote adjustment, with an adjustment range of 5W-40W in 1dB steps. Power can be flexibly adjusted according to coverage needs and electromagnetic environment requirements, reducing interference and power consumption while meeting coverage.

Q3: Does the ePDT base station support encrypted communication? How is the security?

A: Yes. The base station fully conforms to the ePDT standard, supports air interface encryption with AES128-bit encryption algorithm, effectively preventing calls from being eavesdropped. At the same time, terminal authentication is supported; illegal terminals cannot access the network, fully guaranteeing the information security of emergency communication.

Q4: After a power outage and power restoration, will the base station automatically resume work?

A: Yes. The base station has a power-on self-start function. After power supply is restored, it automatically starts and enters normal working mode without manual operation, and automatically connects to the core network or ad-hoc network without on-site debugging, suitable for unattended scenarios.

Q5: What services can the base station support in trunking mode?

A: In trunking remote station mode, the base station supports group call, individual call, full call, emergency call and other trunking call modes, as well as short data transmission and location reporting services, meeting the needs of daily command dispatch, patrol reporting and emergency command.

Q6: How many base stations can one core network support?

A: The ePDT trunking system core network supports a large number of base station access. The specific capacity depends on the core network configuration and carrier allocation. This project’s 120 base stations are far below the capacity limit, and the system supports gradual expansion of stations and carriers as the network grows.

12.2 Ad-Hoc Relay

Q7: After the network is disconnected and the base station switches to ad-hoc mode, can the original trunking terminals still be used?

A: Yes. The ad-hoc mode works in the same 370MHz band and adopts a compatible digital modulation method. The original ePDT digital trunking terminals do not need to be replaced or re-tuned and can directly access the ad-hoc network for calls, realizing seamless terminal compatibility.

Q8: How many base stations can the ad-hoc network support at most, and what coverage range?

A: A single ad-hoc network supports up to 64 base station nodes and more than 8-hop multi-hop relay. The coverage radius of a single base station in open mountain areas is about 3-5 kilometers, and multi-hop relay can realize dozens of kilometers of strip or area coverage; the specific coverage is related to terrain and altitude.

Q9: In ad-hoc mode, will there be obvious call delay?

A: No obvious delay. The single-hop relay delay of the ad-hoc network is ≤50ms; even through 3-hop relay, the end-to-end delay is within 200ms, fully meeting the real-time requirements of voice calls, and the call experience has no obvious difference from trunking mode.

Q10: If one base station breaks down, will the ad-hoc network disconnect?

A: No. The ad-hoc network adopts a centerless distributed architecture with dynamic routing. When a base station fails or is blocked, the network automatically calculates a new route path and data is forwarded through other base stations; single-node failure will not cause network interruption, with extremely strong anti-destruction capability.

Q11: What happens when a terminal moves from one base station coverage to another in ad-hoc mode?

A: The ad-hoc network supports dynamic route maintenance. When the terminal moves, the network automatically updates the route to maintain communication continuity. Since the same frequency band is used and routes are dynamically calculated, terminal movement within the coverage area does not require manual switching.

Q12: What is the maximum number of hops in the ad-hoc network?

A: The system supports ≥8-hop multi-hop relay. Each hop extends the coverage by about one base station coverage radius. In practice, 3-5 hops are generally used to balance delay and coverage; the specific configuration depends on the terrain and site layout.

12.3 Solar Power Supply System

Q13: In continuous rainy weather, how long can the solar base station last without power failure?

A: According to the standard configuration, each station is equipped with a 48V 200Ah lithium iron phosphate battery with a full-load power consumption of about 200W. At full charge, it can work continuously for more than 48 hours. If the base station is in standby state or has less traffic, the endurance will be longer. For areas with frequent rainy weather, the endurance can be extended by increasing PV module power and expanding battery capacity.

Q14: In winter low-temperature environments, will the battery freeze and will capacity decrease?

A: It will not freeze, and the capacity impact is small. The solution uses lithium iron phosphate batteries, which have good low-temperature performance themselves. At the same time, the battery is equipped with an insulation protection box and low-temperature heating function. When the ambient temperature is below 0°C, heating automatically starts to keep the battery working in a suitable temperature range, and capacity performance is not affected by low temperature.

Q15: How long is the service life of PV modules? Will the degradation be serious later?

A: High-quality monocrystalline silicon PV modules are used, with a 10-year workmanship warranty and 25-year power warranty. Under normal use, power degradation within 10 years does not exceed 10%, and within 25 years does not exceed 20%. The degradation speed is very slow and can be used stably for a long time.

Q16: What is the function of the MPPT controller? How is it better than ordinary controllers?

A: MPPT means maximum power point tracking. The controller can track the maximum power point of the PV module in real time, so that the PV module always outputs maximum power. The charging efficiency is 20%-30% higher than ordinary PWM controllers, making fuller use of solar energy, especially advantageous in mountain areas with poor light conditions.

Q17: What happens when the battery is fully charged in strong sunlight?

A: The MPPT controller automatically switches to float charging mode to prevent overcharging and protect the battery. At the same time, the charging current is automatically reduced; excess PV energy is not wasted but the charging is maintained at a safe level, protecting battery life.

Q18: Can the power supply system support short-term high load?

A: Yes. The battery pack supports up to 1C discharge rate (200A), which is far higher than the actual load current of the base station. Even with transient high load such as transmitting, the power supply system can provide stable output through the DC distribution unit and battery buffering.

12.4 Antenna and Lightning Protection

Q19: How to choose between omnidirectional and directional antennas? Which is better for mountain areas?

A: Omnidirectional fiberglass antennas are recommended for mountain emergency base stations. Omnidirectional antennas cover 360°, suitable for hilltop high-point station building, covering areas in all directions, and are simple to install and debug without aiming direction. Directional antennas have higher gain but narrow coverage angle, suitable for point-to-point transmission, not suitable for emergency coverage scenarios.

Q20: Does feeder length affect the signal much? What is the maximum length?

A: The feeder has signal loss; the longer the length, the greater the loss. This solution uses 1/2-inch low-loss feeder with a loss of about 6dB per 100m at 370MHz. It is usually recommended to control the feeder length within 50m. If a longer feeder is needed, a thicker 7/8-inch feeder can be selected to reduce loss, or the base station host can be moved up to shorten the feeder length.

Q21: In rocky mountain geology, what if the grounding resistance cannot meet the requirement?

A: For rocky geology, the following methods can be used to reduce grounding resistance: increase the number and length of vertical grounding electrodes; use resistance-reducing agents to fill the grounding pit; adopt the deep well grounding method; bury grounding electrodes in low-lying areas with thicker soil. Through a combination of methods, the grounding resistance ≤10Ω requirement can be met.

Q22: How many levels of lightning protection does the base station need? What does each level protect against?

A: This solution does three levels of lightning protection: the first level is the air-termination lightning rod on top of the antenna, preventing direct lightning strikes; the second level is the feeder surge arrester at the feeder entry, preventing induced lightning from entering equipment along the RF line; the third level is the DC power lightning arrester at the power entry, preventing induced lightning from entering equipment along the power line. At the same time, all equipment housings and metal structures are reliably grounded, forming a complete lightning protection system.

Q23: What is the coverage radius of a single base station?

A: In open mountain areas, the coverage radius of a single base station with an 8dBi omnidirectional antenna at a hilltop is about 3-5 kilometers. The actual coverage is affected by terrain, vegetation, antenna height and transmit power; in valley or densely forested areas, the coverage will be reduced accordingly.

Q24: Will the antenna be damaged by strong wind?

A: No. The antenna has a wind resistance rating above grade 12 and is fixed with 304 stainless steel clamps. The pole uses 3 sets of guy wires at 120° distribution to strengthen the structure, and the overall system can withstand grade 12 typhoons.

12.5 Construction and Installation

Q25: There is no road on the mountain. How are the equipment transported up?

A: The solution adopts modular lightweight design. After splitting, the single piece weight of all equipment does not exceed 30kg, and can be transported up the mountain by manual carrying or pack animals without large hoisting equipment. The pole adopts a sectional design, 2m per section, convenient for transport.

Q26: Does the base station installation need a concrete foundation?

A: The installation of the guyed pole can be selected according to geological conditions: for soil ground, a simple concrete foundation can be made or ground anchors can be used for fixing; for rock ground, drilling and grouting can be used for fixing. For emergency rapid deployment scenarios, a counterweight base can also be used without ground-breaking construction, making installation faster.

Q27: How long does it take to install one base station? How many people?

A: With materials in place, the installation and commissioning of one base station by a 3-person construction team takes about 1 day. For batch construction, flow operation can be used for higher efficiency.

Q28: Can installation be carried out in bad weather?

A: No. High-altitude operations stop when wind exceeds level 6, rain or fog; mountain transport stops in rain, fog and slippery conditions to avoid safety accidents. The schedule reserves 5 days of buffer time for bad weather and complex terrain.

Q29: What are the requirements for the pole installation position?

A: Choose a high point with open surrounding area; confirm the terrain, soil and transport path during site survey; ensure the site has enough space for guy wires (120° distribution, about 1/3 of pole height as anchor distance); avoid areas prone to landslides and flooding; consider the PV module orientation for maximum sunlight.

12.6 O&M and After-Sales

Q30: Does the base station need dedicated personnel for daily maintenance? How often to go up the mountain for inspection?

A: No dedicated personnel for daily maintenance. The base station has remote O&M functions, and daily status monitoring can be completed on the backend with active alarms on faults. It is recommended to conduct an on-site inspection every six months to one year, checking equipment appearance, fasteners, grounding and PV panel cleaning; O&M cost is very low.

Q31: What if the equipment breaks down? Are there spare parts?

A: The solution is equipped with 5% proportion spare parts, and core components have backups. When a fault occurs, spare parts can be used for replacement first, and the faulty equipment is returned to the factory for repair. At the same time, 7×24-hour technical support is provided, and engineers are arranged for on-site handling of major faults.

Q32: How long is the warranty period of the whole set of equipment?

A: Electronic equipment such as the base station host, ad-hoc equipment and controllers provides a 2-year free warranty; lithium iron phosphate batteries provide a 3-year warranty; PV modules provide a 10-year workmanship warranty and 25-year power warranty; structural parts such as poles and boxes provide a 1-year warranty. Non-human damage within the warranty period is repaired and replaced free of charge.

Q33: Can the remote O&M platform be used by the customer themselves?

A: Yes. The remote O&M platform usage permission is provided free of charge, supporting the customer to independently monitor and manage the system, including status viewing, alarm handling and data query.

Q34: What if the base station cannot go online after installation?

A: Troubleshooting steps: 1. check whether the power supply system output is normal (DC48V); 2. check whether the backhaul module has network signal and the SIM card is valid; 3. check whether the host status indicators are normal; 4. check whether the RF feeder connection is firm and the antenna is intact; 5. check whether the core network parameters are configured correctly; 6. contact technical support for remote diagnosis if the problem persists.

12.7 System Performance

Q35: What is the frequency band planning of the 370MHz ePDT system?

A: The 370MHz ePDT system works in the 370MHz±5MHz band, with uplink 370MHz-375MHz and downlink 360MHz-365MHz, conforming to the digital trunking frequency band planning requirements, and band customization is supported according to the user’s frequency license.

Q36: What is the channel spacing and modulation of the system?

A: The system uses 12.5kHz channel spacing, 4FSK modulation and TDMA dual-slot multiple access, which is the standard configuration of the ePDT digital trunking system, compatible with standard ePDT terminals.

Q37: What is the call setup time of the system?

A: The ePDT system uses fast signaling and TDMA technology; the call setup time is short, generally within 300ms under normal network conditions, meeting the real-time requirements of emergency dispatch.

Q38: Can the system transmit short data and location information?

A: Yes. The system supports short data transmission and location reporting services. Terminals can report location and status information through the base station, and the dispatch console can view terminal locations in real time, convenient for command and dispatch.

Q39: What is the single-hop relay delay of the ad-hoc network?

A: The single-hop forwarding delay is ≤50ms. Even through multi-hop relay, the end-to-end delay is kept within acceptable real-time limits, and voice quality is not affected.

Q40: What is the MTBF of the system?

A: The system MTBF is ≥100000 hours, ensuring long-term stable operation. Combined with the redundant design of dual-mode switching and distributed networking, the overall availability of the system is very high.

12.8 Scenarios and Applications

Q41: What scenarios is this solution suitable for?

A: Suitable for emergency management, forest fire prevention, mountain security, water conservancy inspection, disaster rescue and other scenarios that require emergency communication guarantee in complex terrain without utility power and with weak public network coverage, such as forest areas, reservoirs, mining areas, border areas and remote villages.

Q42: Can it be used in plain areas?

A: Yes. Although designed for mountain environments, the base station can also be used in plain, urban and suburban areas. In areas with existing utility power, it can also be connected to utility power as a supplement (with the solar system as backup), and in areas with public network, the backhaul can use the public network directly.

Q43: How to coordinate with the existing trunking system of the user?

A: The base station fully conforms to the ePDT standard and can seamlessly connect with the user’s existing ePDT core network and terminals. The site planning, frequency planning and parameter configuration are carried out uniformly according to the existing system, without affecting the original network operation.

Q44: Can the solution be used for temporary emergency deployment?

A: Yes. The quick-install design supports temporary emergency deployment: the pole can use a counterweight base, equipment uses quick-install clamps, cables have prefabricated connectors, and a complete station can be deployed and put into use in about 1 day, suitable for sudden disaster rescue and temporary command needs.

Q45: Can the system be expanded later?

A: Yes. The system supports station quantity expansion, single-station carrier expansion and terminal capacity expansion. New base stations can be added to the existing network by following the same configuration and site planning, and the ad-hoc network and trunking network automatically include the new stations.

Q46: What is the difference between this solution and a traditional communication base station?

A: Traditional base stations rely on utility power and optical fiber/public network backhaul; when the power or transmission is interrupted, they stop working. This solution is fully solar-powered and independent of utility power, and automatically switches to ad-hoc relay mode when the backhaul is interrupted, so that even in extreme scenarios of power outage and network disconnection, on-site communication is not interrupted. It is designed specifically for extreme environments.

12.9 Procurement and Service

Q47: What is the delivery cycle of 120 base stations?

A: The total project period is planned at 60 days, including preparation, material transport, foundation and grounding, pole and equipment installation, system commissioning and acceptance. The production and delivery of equipment can be arranged in batches according to the construction schedule to ensure material arrives before construction.

Q48: What documents and qualifications are provided with delivery?

A: Each station is delivered with factory inspection reports, test records, installation and commissioning records; the project delivers completion drawings, site information, test reports, operation manuals, maintenance manuals and other complete technical documents, and can provide relevant product test reports and certificates.

Q49: Can the station configuration be customized?

A: Yes. According to actual needs, the following can be customized: transmit power, carrier number, antenna type and gain, PV module power, battery capacity, pole height, box color and logo, backhaul mode (public network/satellite/dedicated network), etc.

Q50: How is the training organized?

A: A 2-day centralized training is organized at the project site during the acceptance stage, covering theory and practice for system administrators, O&M technicians and users, with assessment and certificates; online training videos and documents are also provided, and O&M personnel can follow the construction team for on-the-job training during installation.

Q51: What is the cost advantage of the solar power supply solution?

A: Compared with traditional utility power base stations, the solar solution saves the high cost of utility power line laying (which is often extremely expensive and difficult in mountain areas), avoids monthly electricity fees, and realizes zero electricity cost throughout the year. Combined with remote O&M reducing manual visits, the total lifecycle cost is significantly lower.

Q52: What should be done if the SIM card of the backhaul module runs out of traffic?

A: The IoT SIM cards use annual data packages and can be renewed or replaced before expiry. The system monitors the traffic usage and can set alarm thresholds. In areas where the public network is unavailable, dedicated network backhaul or satellite backhaul options can be selected.

Q53: Can the system monitor the PV power generation status?

A: Yes. The remote O&M platform collects the supply voltage, battery level, charging current and other data in real time; abnormal charging status is alarmed, and O&M personnel can remotely judge whether the PV system is working properly.

Q54: What should be done if the base station is hit by lightning?

A: The three-level lightning protection system greatly reduces the probability of lightning damage. After a lightning strike, check through the remote platform whether the station is online; on-site inspection focuses on the feeder arrester, power arrester, antenna and grounding connections; if the arrester is damaged, replace the spare part; the grounding system is re-tested to ensure it still meets the requirements.

Q55: How to ensure the long-term stability of the system?

A: From design, manufacturing, installation to O&M, multi-dimensional guarantees are provided: high-reliability equipment with MTBF ≥100000 hours, dual-mode redundant design, complete lightning protection and environmental adaptation, standardized installation with acceptance testing, semi-annual free inspection within the warranty period, annual system optimization and firmware upgrades, and 7×24-hour technical support, ensuring long-term stable system operation.

13. Construction Schedule

For the mountain construction project of 120 base stations, a batch flow operation mode is adopted, with a total construction period planned at 60 days, as follows:

Stage Work contents Duration Responsible Remarks
Stage 1: Project preparation (Day 1-5) Drawing review, technical disclosure, construction plan compilation 2 days Project manager, technical director
Material procurement, factory inspection, batch stocking 5 days Material administrator Parallel with site survey
Construction team formation, safety training, technical training 3 days Construction team leader, safety officer
On-site station survey, point confirmation, transport route planning 5 days Technical director, construction team leader 2 groups in parallel
Stage 2: Material transport entry (Day 6-10) First batch of 20 stations’ materials to project base 2 days Material administrator
Material acceptance, classified storage, secondary packing 1 day Material administrator, construction team leader
Batch transfer to temporary stacking points near stations 5 days Construction teams Later batches transported with construction progress
Stage 3: Foundation and grounding construction (Day 11-25) First batch 20 stations pole foundation construction 5 days Construction teams 1, 2 Each team 10 stations
Grounding grid laying, grounding resistance test 7 days Construction teams 1, 2 After foundation solidifies
Second batch 20 stations foundation construction starts – Construction team 3 Flow operation
Stage 4: Pole and equipment installation (Day 16-40) First batch station pole erection, guy fixing 3 days Construction teams 1, 2 After foundation solidifies
PV module and bracket installation 2 days Construction teams 1, 2
Equipment box and battery box installation 2 days Construction teams 1, 2
Antenna feeder system installation, cable laying 3 days Construction teams 1, 2
Later batch stations installed in parallel – All construction teams Rolling progress by batch
Stage 5: System commissioning and optimization (Day 26-50) Single-station power-on commissioning, function test 2 days/batch Commissioning engineer Immediately after installation
Trunking networking test, backhaul link test 3 days/batch Commissioning engineer
Ad-hoc switching test, relay effect test 2 days/batch Commissioning engineer
Coverage optimization, parameter adjustment 3 days/batch Commissioning engineer
O&M platform access, data joint commissioning 5 days O&M engineer Unified commissioning of all stations
Stage 6: Acceptance and delivery (Day 51-60) Batch preliminary acceptance, rectification and improvement 5 days Project manager, customer
Overall completion acceptance, document handover 3 days Project manager, customer
Operation training, O&M training 2 days Technical director, trainer
Project delivery, entering warranty period 1 day Project manager

Schedule guarantee measures

– Flow operation: the four links of survey, foundation, installation and commissioning flow; after the previous batch enters the next link, the latter batch starts immediately, maximizing time utilization;

– Multi-group parallel: 3 construction teams and 2 commissioning teams are configured to construct multiple stations in parallel, improving overall efficiency;

– Material guarantee: stock in advance, transport in batches, ensuring construction does not wait for materials, avoiding shutdowns caused by material shortage;

– Emergency plan: reserve 5 days of buffer period for bad weather and complex terrain, ensuring the total schedule is controllable.

14. Construction Organization and Quality/Safety Measures

Guangzhou Lain 370MHz ePDT Solar-Integrated Ad-Hoc Emergency Base Station on-site installation real photo

14.1 Construction Organization Structure

A special project department is established with a project manager responsibility system:

– Project manager: 1 person, overall responsibility for project progress, quality, safety, cost and coordination;

– Technical director: 1 person, responsible for technical solution disclosure, on-site technical guidance, commissioning plan formulation and technical problem solving;

– Construction team leaders: 3 persons, each leading a construction team, responsible for on-site construction organization, personnel management and progress execution;

– Safety officers: 2 persons, responsible for on-site safety management, safety training, hazard investigation and safety supervision;

– Quality inspector: 1 person, responsible for construction quality inspection, process acceptance, quality records and rectification supervision;

– Material administrator: 1 person, responsible for material procurement, transport, warehousing, distribution and inventory;

– Commissioning engineers: 2 persons, responsible for system commissioning, parameter optimization and platform joint commissioning;

– Construction personnel: 15 persons, divided into 3 teams of 5, including high-altitude operators, electricians and general workers.

14.2 Pre-Construction Preparation

#### 14.2.1 Technical Preparation

– Organize relevant personnel to familiarize themselves with design drawings, solution and specifications, conduct drawing review and clarify technical requirements;

– Compile detailed construction plans, operation instructions and safety special plans, conduct technical disclosure;

– Prepare construction record forms, test forms and acceptance forms;

– Conduct special technical training for special and key processes.

#### 14.2.2 Material Preparation

– Procure all equipment and materials according to the configuration list, inspect before delivery to ensure quality;

– Classify and pack materials with labels for convenient transport and on-site search;

– Plan transport routes in advance, contact transport vehicles and mountain transfer forces;

– Equip construction tools, test instruments and safety protection equipment.

#### 14.2.3 On-Site Preparation

– Communicate with relevant local departments in advance and handle construction procedures;

– Conduct on-site survey of all stations, confirming points, terrain, transport paths and geological conditions;

– Set up project base and temporary material warehouse with fire and theft prevention measures;

– Conduct entry safety education and local environment precautions training for construction personnel.

14.3 Mountain Construction Special Plan

#### 14.3.1 Mountain Transport Plan

– Large materials transported by truck to the foot of the mountain, then transferred to hilltop stations by manual carrying or pack animals;

– All materials split to single-person portable weight, with anti-collision and waterproof packaging;

– Survey transport paths in advance, clear obstacles, ensuring transport safety;

– Stop mountain transport in rain, fog and slippery conditions to avoid safety accidents.

#### 14.3.2 Foundation Construction Plan

– Soil geology: anchor + guy method, excavate 0.8m deep anchor pit, pour concrete to embed anchors;

– Rock geology: drilling and grouting method, use pneumatic drill to drill holes, embed anchor rods and grout with cement mortar for fixing;

– The grounding grid is arranged in a ring along the foundation; vertical grounding electrodes are driven into the ground, horizontal flat steel connects them, with anti-corrosion treatment at welds;

– After construction, test the grounding resistance, which must meet ≤10Ω; unqualified ones must be rectified.

#### 14.3.3 High-Altitude Operation Plan

– All high-altitude operators must hold certificates, wear safety helmets, safety belts and anti-slip shoes;

– Pole assembly adopts ground assembly and overall erection to reduce high-altitude operations;

– Set a warning area below during high-altitude operations, prohibiting unrelated personnel from entering;

– Stop high-altitude operations when wind exceeds level 6, rain or fog.

#### 14.3.4 Environmental Protection Measures

– Minimize vegetation damage during construction; excavated soil backfilled and restored promptly;

– All construction waste and packaging materials taken down the mountain for disposal, not discarded on the mountain;

– Smoking and open fire prohibited in forest areas, strictly complying with forest fire prevention regulations;

– Clean the site after construction and restore the environment around the station.

14.4 Construction Quality Control

– Three-inspection system: implement self-inspection, mutual inspection and handover inspection; after each process, construction personnel self-inspect first, then the team leader mutually inspects; after passing, report to the quality inspector for acceptance; only after acceptance can the next process proceed;

– Key process acceptance: key processes such as grounding resistance test, antenna feeder VSWR test, power supply system test and function switching test must be tested and recorded on site by the quality inspector with signed confirmation;

– Quality records: establish a complete construction quality archive, one set of documents per station, including construction records, test data, acceptance records and photos, traceable and queryable;

– Unqualified rectification: immediately stop work and rectify when quality problems are found; after rectification, re-acceptance is carried out; quality hazards are never left behind.

14.5 Construction Safety Management

– Safety responsibility system: implement safety production responsibility at all levels; the project manager is the first safety responsible person, the safety officer isDedicated (dedicated) to safety management, and each team leader is the team safety responsible person;

– Safety education and training: all personnel receive safety training before entry; special operation personnel hold certificates; regular safety meetings are held;

– Safety protection: complete safety protection supplies; high-altitude, electrical and mountain operations strictly follow safety operating procedures;

– Hazard investigation: daily pre-shift safety disclosure, daily safety inspections, regular safety hazard investigations, immediate rectification of found hazards;

– Emergency plans: formulate emergency plans for high-altitude fall, landslide, lightning strike and heatstroke, equip first-aid medicine and equipment, and conduct regular drills.

15. After-Sales Service

15.1 Warranty Service Commitment

– Complete equipment: electronic equipment such as base station host, ad-hoc equipment, controllers and backhaul modules provides a 2-year free warranty;

– Energy storage battery: lithium iron phosphate battery pack provides a 3-year free warranty;

– PV modules: monocrystalline silicon PV modules provide a 10-year workmanship warranty and 25-year power warranty;

– Structural parts: metal structural parts such as poles, boxes and brackets provide a 1-year free warranty;

– Within the warranty period, equipment faults not caused by human damage or force majeure are repaired, parts replaced and on-site service provided free of charge.

15.2 Response Time Commitment

– 7×24-hour technical hotline: all-weather technical support hotline, answering technical consultation and accepting fault reports at any time;

– Remote response: general faults get a remote solution within 2 hours, guiding on-site personnel to eliminate the fault;

– On-site response: for major faults requiring on-site handling, engineers arrive at the project site within 48 hours (appropriately extended according to traffic conditions in remote mountain areas), restoring system operation as soon as possible;

– Spare parts response: common spare parts shipped within 48 hours, emergency spare parts delivered by the fastest transport method.

15.3 Spare Parts Service

– The project is equipped with 5% proportion spare parts, including channel machines, controllers, antennas, lightning arresters and other wearing parts, stored at the project base to ensure rapid fault replacement;

– Establish a long-term spare parts supply channel; after the warranty period, parts and consumables are provided at cost price to ensure long-term system operation;

– For discontinued models, inform customers in advance and provide compatible replacement solutions to ensure the continuity of spare parts supply.

15.4 Regular Inspection Service

– Within the warranty period, provide one free on-site inspection service every six months, conducting comprehensive testing of all base stations;

– Inspection contents include: equipment running status check, RF parameter test, PV system cleaning and detection, battery performance test, grounding resistance re-measurement, fastener check and waterproof sealing check;

– Each inspection issues a formal inspection report with operation evaluation and optimization suggestions, investigating potential hazards;

– Conduct a system overall optimization every year, adjusting coverage parameters, optimizing ad-hoc routes and upgrading firmware versions to ensure the system always runs in the best state.

15.5 Upgrade and Expansion Services

– Free system firmware upgrade services, continuously optimizing functions and performance, fixing known problems;

– Support subsequent station expansion, carrier expansion and function upgrades, seamlessly accessing the existing network;

– Provide customized function development services for new customer needs, continuously adapting to business development.

15.6 Value-Added Services

– Provide free remote O&M platform usage permission, supporting customers to independently monitor and manage the system;

– Regularly provide industry information and technical materials, sharing emergency communication best practices;

– During major emergency guarantee periods, dedicated personnel on-duty guarantee services can be provided to ensure communication is foolproof.

16. Training Plan

16.1 Training Objectives

Through systematic theory and practice training, enable the customer’s O&M personnel to comprehensively master the working principle, operation methods, daily maintenance and common fault troubleshooting of the 370MHz ePDT solar ad-hoc base station system, able to independently complete daily O&M management work, handle common faults and ensure stable system operation.

16.2 Training Targets and Classification

– System administrators: responsible for overall system management, backend operation and parameter configuration, with deeper training;

– O&M technicians: responsible for on-site inspection, equipment maintenance and simple fault handling, focusing on practice;

– Users: responsible for terminal operation and emergency scenario use, focusing on basic operation.

16.3 Training Contents

#### 16.3.1 Theoretical Training

– Basic principles of digital trunking communication, ePDT system architecture and characteristics;

– Mesh ad-hoc networking technology principles, networking methods and routing mechanisms;

– Solar power supply system working principle, battery charge/discharge management knowledge;

– Base station system overall architecture, functions and coordination of each subsystem;

– Basic lightning protection grounding knowledge, mountain equipment protection knowledge;

– System daily O&M specifications and safety operation precautions.

#### 16.3.2 Practical Training

– Base station equipment hardware structure, interface and cable identification;

– Base station local operation, mode switching, parameter viewing, restart and reset;

– Antenna feeder system daily inspection, VSWR test method;

– PV system daily maintenance, module cleaning and status check;

– Battery system daily inspection, voltage and battery level viewing;

– Remote O&M management platform operation, status monitoring, alarm handling and data query;

– Common fault troubleshooting and handling, fault location methods;

– Emergency scenario operation drills, network-disconnected emergency and power fault emergency.

16.4 Training Methods and Arrangement

– On-site centralized training: during the project acceptance stage, a 2-day centralized training at the project site, combined with actual equipment explanation and practice;

– Online training: provide online training videos and documents for learning and review at any time;

– Follow-work training: during construction and commissioning, O&M personnel can follow the construction team for on-site learning to deepen understanding;

– Manual materials: provide complete “System Operation Manual”, “O&M Maintenance Manual”, “Fault Troubleshooting Manual” and “Emergency Handling Guide”.

16.5 Training Assessment and Follow-Up Support

– After training, conduct a theory examination and practical assessment; only those who pass can take up posts independently;

– Those who fail the assessment receive free secondary training until mastery;

– Within the warranty period, technical consultation and Q&A are available at any time, with irregular retraining and technical exchanges organized.

17. Anonymous Typical Project Scenarios

The following cases are anonymous, generalized examples based on typical project implementations; no real customer names or locations are disclosed.

17.1 Mountain Forest Fire Prevention Emergency Communication System Project

Project Background

A key forest area is vast with complex mountain terrain and poor public network signal coverage. The forest fire prevention patrol and emergency rescue communication guarantee capability was weak. The original walkie-talkie communication distance was short and could not meet large-scale dispatch needs, and there was no utility power in the forest area, making base station power supply difficult.

Solution

Deploy 80 sets of 370MHz solar-integrated ad-hoc emergency base stations, building stations at hilltop high points, with full-solar independent power supply and guyed pole installation. In normal state, the base stations access the forest area command center trunking core network, realizing unified dispatch of the whole forest area; in network-disconnected state, they automatically switch to ad-hoc relay mode, ensuring on-site rescue communication is not interrupted. A remote O&M management platform is provided for centralized monitoring of all base stations.

Implementation Effect

– Realized digital trunking coverage of more than 95% of the forest area, with clear voice and smooth dispatch;

– The full-solar power supply system operated stably, guaranteeing more than 3 days of endurance in continuous rainy weather without utility power investment;

– The ad-hoc function performed excellently in multiple drills, automatically switching within 3 seconds after network disconnection, with normal multi-hop relay communication;

– Remote O&M greatly reduced the number of mountain maintenance visits, reducing O&M costs by more than 60%;

– The system played a key communication guarantee role in multiple forest fire incidents, highly recognized by the user.

17.2 Mountain Emergency Communication Project of a Large Water Conservancy Hub

Guangzhou Lain 370MHz ePDT Solar-Integrated Ad-Hoc Emergency Base Station project case photo 1

Project Background

The reservoir area of a large water conservancy hub is surrounded by mountains. Reservoir patrol, dam O&M and flood prevention emergency all require reliable communication guarantee. The public network coverage around the reservoir area is incomplete, and some areas have no utility power access, making traditional base station deployment impossible.

Solution

Deploy 45 sets of 370MHz solar ad-hoc base stations distributed along the mountain high points around the reservoir area, building an emergency communication network covering the whole reservoir area and surrounding mountains. The base stations adopt solar + energy storage power supply with insulated battery boxes for winter low-temperature environments. The base stations access the water conservancy dispatch center trunking system and have network-disconnected ad-hoc capability, guaranteeing communication in extreme weather during the flood season.

Implementation Effect

– Realized full-area communication coverage of the reservoir area, solving the long-standing problem of poor patrol communication;

– The solar system operated stably with annual power generation meeting the base stations’ full-year electricity demand at zero electricity cost;

– The system withstood the test of heavy rain and strong wind in the flood season, operating stably without faults;

– Seamless integration with the original dispatch system, with universal terminals, protecting the user’s existing investment.

17.3 Mountain Emergency Communication Guarantee Project of an Emergency Management Bureau

Project Background

An emergency management bureau is responsible for emergency command of mountain disaster rescue and emergency incident handling in its jurisdiction. The jurisdiction has many mountains with complex terrain and many public network blind spots. Communication interruption easily occurs during disasters, seriously affecting rescue command.

Solution

Build 120 distributed solar ad-hoc emergency base stations covering the main mountain areas and disaster-prone points in the jurisdiction. The base stations adopt dual-mode design: in normal networking, they access the municipal emergency command center ePDT trunking system for unified municipal dispatch; when the network is disconnected, they automatically form a regional ad-hoc network to guarantee on-site rescue communication. All stations are uniformly connected to the O&M management platform for centralized monitoring and management.

Implementation Effect

– Filled the public network coverage blind spots in mountain areas, greatly improving emergency communication guarantee capability;

– The network-disconnected ad-hoc function realized “communication not interrupted when network is disconnected”, solving the communication pain point in disaster scenarios;

– Modular quick-install design shortened the construction cycle and quickly formed guarantee capability;

– High system reliability, low failure rate and simple O&M, highly praised by the emergency management department.

18. SEO Optimization Section

18.1 Keyword System

Core primary keywords

370MHz ePDT solar-integrated ad-hoc emergency base station

High-conversion long-tail keywords

mountain emergency communication solar base station, ePDT digital trunking ad-hoc base station, network-disconnected auto-switching relay base station, solar-powered trunking base station, 370MHz ad-hoc emergency base station, mountain off-grid communication base station

Industry traffic keywords

emergency communication base station solution, digital trunking remote station, wireless Mesh ad-hoc relay, outdoor solar-powered base station, mountain emergency communication equipment, forest fire prevention communication base station, water conservancy emergency communication system

Brand-specific keywords

KITOZER emergency base station, Pioneer solar base station, Guangzhou Lain emergency communication base station

Dropdown/related search keywords

ePDT base station price per set, how long can a solar base station last, ad-hoc base station coverage range, how to install a mountain base station, which emergency communication base station is good

18.2 Page Optimization Tags

– Title tag: 370MHz ePDT Solar-Integrated Ad-Hoc Emergency Base Station_Mountain Network-Disconnected Relay_Solar Powered – Guangzhou Lain

– Meta Keywords: 370MHz ePDT base station, solar ad-hoc emergency base station, digital trunking remote station, wireless Mesh relay, mountain emergency communication, solar-powered base station, Guangzhou Lain

– Meta Description: Guangzhou Lain professionally provides 370MHz ePDT solar-integrated ad-hoc emergency base station solutions, supporting dual-mode automatic switching of trunking and network-disconnected ad-hoc networking, full-solar independent power supply, adapted to mountain, forest, water conservancy and other emergency communication scenarios; original factory customization.

– H1 tag: 370MHz ePDT Solar-Integrated Ad-Hoc Emergency Base Station Technical Design Solution

– H2 tags: ePDT Digital Trunking Base Station Core System, Wireless Ad-Hoc Relay System, Solar Independent Power Supply System, RF Antenna Feeder System, Lightning Protection Grounding System, Construction Organization Plan, After-Sales Service System

18.3 Internal Link Anchor Text

– Core anchor text: 370MHz ePDT solar-integrated ad-hoc emergency base station

– Long-tail anchor text: mountain emergency communication solar base station, ePDT digital trunking ad-hoc base station

– Related anchor text: outdoor intelligent protection cabinet, micro-module cold aisle, shielded computer room construction

19. Official Contact Information

– Company Name: Guangzhou Lain Intelligent System Development Co., Ltd.

– Brand: KITOZER (Pioneer)

– Website: https://gdlain.com

– Tel: +86 139 2228 9957 (WeChat available), +86 185 2066 8845 (WeChat available)

– Address: No. 5 Huashan Road, Shilou Town, Panyu District, Guangzhou, China