The KITOZER 1000A generator automatic transfer switch is a heavy-duty floor-standing appliance engineered as the interface between a large standby generator set and a commercial or industrial facility main distribution. The unit uses a motor-driven PC class change-over switch with a mechanical interlock, and the controller manages the full sequence: detect utility fail, start the generator, wait for generator voltage and frequency to stabilize, transfer the load, monitor generator health during the outage, and return the load to utility when it is stable for a cool-down delay. The 1000A rating is sized for large hotels, hospitals, shopping malls, data halls, and industrial plants with 500kW to 1MW standby generator sets. The front LCD shows source voltage, source frequency, transfer position, generator start counts, and event history, while Modbus TCP and dry contacts integrate the ATS into the generator management and BMS platforms.
Technical Specifications
Rating: 1000A continuous, 400V three phase plus neutral, 50 or 60Hz. Class: PC class IEC 60947-6-1, motor driven change-over, short-time withstand rated. Transfer time: 150ms to 250ms typical. Source monitoring: three phase RMS voltage, frequency, unbalance, phase rotation on both feeds. Voltage window programmable 320V to 460V, frequency 47Hz to 63Hz. Timers: engine crank attempt, engine rest, transfer delay, re-transfer delay, cool-down run, preferred source. Control: microprocessor controller with 5 inch LCD, event log, scheduled exercise test. Communication: RS485 Modbus RTU, Ethernet Modbus TCP, optional SNMP, dry contact IO, generator start output. Mechanical: motor drive, manual handle, electrical and mechanical interlock. Cabinet: floor standing IP31, busbar top or bottom entry, operating 0 to 40 degrees C. Standards: CE, IEC 60947, 5 year warranty.
Application Scenarios
The 1000A ATS is installed wherever a large generator must automatically take over a facility load. Typical sites include full-service hotels and convention centers, large hospitals and university medical centers, shopping malls and distribution centers, mid-size data halls with UPS upstream, water treatment plants and pumping stations, food and beverage processing plants, and mining and remote industrial sites. It is also used in large cold storage warehouses, aviation and transport terminals, and broadcast and telecom data centers. In solar plus storage microgrids, it can switch the facility between grid, generator, and inverter feed under controller logic. Scheduled exercise test feature runs the generator weekly under light load to keep the engine healthy without manual intervention.
Key Advantages
The PC class change-over switch is smaller and faster than equivalent CB class equipment, saving switchroom space. The mechanical plus electrical interlock guarantees no source paralleling. The full generator sequence, including start output, crank attempts, and cool-down run, is managed by the controller, reducing the need for a separate generator controller. The scheduled exercise test feature keeps the engine healthy. The event log and Modbus TCP give remote visibility into every transfer, start, and fault. The manual handle allows safe mechanical operation during maintenance. The unit is factory tested with a supplied report. The 5 year warranty covers both switch and control.
Installation and Maintenance Recommendations
Mount on a concrete plinth with cable trench sized for 1000A busbar, coordinate upstream main breaker with the ATS short-time withstand, and verify that the generator start output contact matches the generator controller input. On commissioning, set voltage and frequency windows, set crank attempts and rest time, set transfer delay to match generator voltage stabilization, set cool-down run time, and program the weekly exercise test. Run a full forced test: disconnect utility, observe generator start, transfer, and re-transfer. Maintenance: inspect contacts annually, torque busbar joints, test the manual handle, read event log, and verify the exercise test runs on schedule. Keep a spare control board and motor drive on site. Trend generator start counts and transfer frequency; a rising number of transfers often points to a utility issue upstream, not an ATS issue. After any short-circuit event, inspect contacts and replace if required.
The 1000A ATS is typically paired with a 700kW to 1000kW standby generator, and the controller is pre-wired for the generator start, stop, and common alarm contacts. The scheduled exercise test runs the generator weekly under light load, keeping the engine healthy without operator intervention. The event log records every start, transfer, and fault for compliance reporting.
Ordering Information
The 1000A generator ATS is supplied as a floor standing cabinet with busbar top or bottom entry, pre-wired for generator start, stop, and crank attempt signals. The standard controller includes a 5 inch LCD, event log, scheduled weekly exercise test, RS485 Modbus RTU, and Ethernet Modbus TCP. Optional packages include SNMP for BMS integration, a generator mimic panel for the site control room, and a 24VDC control supply for telecom sites. The cabinet is available IP31 or IP32, and busbar stubs can be prefabricated to site drawings. Lead time is six to eight weeks. KITOZER provides a factory test report, generator interface wiring diagram, and commissioning support. The five year warranty covers the change-over switch and controller.
Price
From $11,800 per piece. Contact the factory for generator interface wiring, custom cabinet, and SNMP option. Guangzhou Laian Intelligent System Development Co., Ltd. | Tel/WeChat: +86 13922289957 / +86 18520668845 | WhatsApp: +86 19068534140 | www.gdlain.com