Table of Contents
Toggle1. Cover / Document Information
– Document Title: Rail Transit Network Training Center – Comprehensive Electromechanical Training Room Technical Design Solution
– Prepared by: Guangzhou Lain Intelligent System Development Co., Ltd.
– Brand: KITOZER (Pioneer)
– Date: August 2026
– Version: V1.0
– Project Type: Technical design solution for Rail Transit Network Training Center – Comprehensive Electromechanical Training Room
2. Table of Contents Structure
1. Company Introduction
2. Project Overview
3. User Requirement Analysis
4. Overall Design Description
5. Detailed System Design and Product Technical Parameters
6. Project Quotation and Configuration List
7. Core Solution Advantages
8. Technical Q&A
9. Construction Schedule Plan
10. Construction Organization Plan
11. After-Sales Service System
12. Operation and Maintenance Training Plan
13. Typical Project Cases
14. SEO Optimization System and Website Backend Configuration
15. Contact Information
3. Company Introduction
3.1 Company Development Overview
Founded in 2002, Guangzhou Lain Intelligent System Development Co., Ltd. is a high-tech enterprise dedicated to the computer room construction and intelligent protection field for more than two decades, integrating R&D, production, sales, engineering implementation and after-sales service. The company focuses on innovative breakthroughs in electromagnetic shielding technology, modular computer room technology and computer room environmental monitoring technology, and has grown into a source manufacturer with core competitiveness in the domestic computer room construction field.
After more than twenty years of industry accumulation, the company has built a large-scale production and manufacturing base equipped with advanced CNC sheet metal processing equipment, automated spraying production lines and professional testing laboratories, with an annual production capacity of hundreds of sets of shielding computer rooms, integrated cabinets and micro-module products. The company’s service network covers all provinces and cities across the country, providing thousands of computer room construction and renovation services for customers in government, military, scientific research, finance and enterprise fields.
3.2 Core Business System
The company’s core business revolves around the full-lifecycle construction of computer rooms, forming four major product and service systems:
– Computer room EPC general contracting service: one-stop services from solution design, manufacturing, on-site construction to commissioning and acceptance, covering shielding computer rooms, IDC data rooms, modular computer rooms, container computer rooms and other types;
– Core equipment R&D and production: independently produces KITOZER brand series products, including shielding cabinets, shielding desks, consoles, integrated data cabinets, micro-module cold aisle cabinets, outdoor rainproof cabinets, etc., supporting non-standard customization;
– Computer room environmental monitoring system: provides full-element monitoring solutions for temperature and humidity, water leakage, access control, video, fire protection, UPS and power distribution, realizing intelligent and unattended O&M;
– Shielding and security protection products: shielding rooms, shielding doors and windows, anechoic chambers and related auxiliary materials, widely used in confidential, military and scientific research fields.
3.3 Brand and Qualification Honors
The core brand KITOZER (Pioneer) focuses on computer room equipment and shielding products, positioned as an “efficient, green, innovative and safe” solution provider. Products have passed multiple authoritative tests and comply with national and industry standards. The company holds multiple utility model patents and software copyrights, has been awarded high-tech enterprise qualification, and follows the ISO9001 quality management standard.
3.4 Core Competitive Advantages
1. Source production, controllable quality: own production base and professional processing equipment; core products independently produced with full-process quality control, providing more cost-effective solutions without intermediate links;
2. Customized design, matching needs: tailor-made solutions per site conditions, technical requirements, configuration and budget, with multiple design options provided free of charge;
3. Professional team, rich experience: a professional technical team of engineers and project managers with more than ten years of industry experience;
4. Quality after-sales, full guarantee: a 7×24 professional online service system with dedicated project follow-up from early coordination to later O&M.
4. Project Background and Objectives
4.1 Project Background
With the rapid growth of urban rail transit, station electromechanical systems (water supply/drainage, ventilation and air conditioning, LV distribution, environmental control automation) demand ever more skilled O&M personnel. Traditional training is theory-heavy — trainees lack hands-on experience with real equipment and fault handling. This project builds a comprehensive electromechanical training room for a rail-transit network training center, creating a training platform highly consistent with real station operating environments.
4.2 Construction Objectives
Build a complete, advanced, practice-oriented comprehensive electromechanical training system covering five disciplines: water supply/drainage, ventilation and air conditioning, low-voltage distribution, intelligent lighting, and environmental-control/BAS integrated monitoring. All equipment is industrial-grade matching real metro-station selection, supporting five training levels (cognition, operation, maintenance, fault finding, system integration) and multiple scenarios (normal, fault, emergency). Modular, expandable architecture with standard protocols (Modbus, KNX) for future training modules.
4.3 Project Scope
Five training subsystems + BAS integrated monitoring platform + interface and integration design + auxiliary furniture + installation, commissioning, training and 2-year warranty, delivered as a turnkey training room.
5. User Requirement Analysis
5.1 Water Supply and Drainage Training
Simulate station sewage lifting and semi-vacuum sewage systems: stainless lifting tanks with submersible pumps (auto-coupling, float + hydrostatic level sensing), PLC control boxes (manual/auto/BAS remote, alternating pumps, full protection), and a semi-vacuum system (vacuum tank, water-ring vacuum pump, non-clogging sewage pump, steam-water separator, electrode level rods, vacuum lifting device with diaphragm valve, PLC control) — all data uploaded to BAS.
5.2 Ventilation and Air Conditioning Training
Single-speed fire fans (high-temperature duty) and dual-speed fans; electric combined dampers with fan hard interlock; electric multi-leaf regulating dampers (4-20mA); electric butterfly valves for water systems; split heat-pump AC and DC-inverter multi-split (VRV) units with BAS communication; fan mounts, anti-vibration pads, fire canvas flexible joints.
5.3 LV Distribution and Intelligent Lighting Training
Power distribution box (20kVA, SPD, multiple circuits); Schneider components (NSX breakers, contactors, thermal relays, soft starter, VFD, gateway PLC, motor protection relays); Siemens KNX intelligent lighting (touchscreen, 0-10V dimming, presence/illuminance sensors, scenes, KNX-RS485 gateway); MNS draw-out environmental-control electrical cabinet; wall-mounted control cabinet.
5.4 BAS and Integrated Monitoring
Metro-standard BAS architecture: master PLC, remote RI/O, supervisory workstation with configuration software (>=512 points), ISCS integrated monitoring, simulated carrier platform, and an interface gateway to the automation training room (Modbus TCP, opto-isolated).
5.5 Auxiliaries and Environment
Tool cabinets, file cabinets, training desks/chairs, LED lighting (>=300lx); rational layout with strong/weak separation, cable trays, galvanized conduit, closed-loop water piping (no external water source), ducted ventilation with fire canvas joints.
6. Design Principles and Applicable Standards
6.1 Design Principles
Technical advancement: mainstream-brand components (Schneider, Siemens) consistent with real metro stations — students learn what they will operate; standard protocols (Modbus, KNX) for open architecture and expansion. Comprehensive training: five disciplines covering the full station electromechanical picture; five training levels; multi-scenario simulation (normal/fault/emergency). Safety and reliability: full per-circuit protection (overload, short, leakage, phase-loss), device protection (overheat, water leakage, overpressure), lockable HV circuits, fault-simulation auto-recovery, standard construction. Extensibility: modular subsystems purchasable/upgradable independently; reserved IO and communication for future AC, elevator, fire modules; upgradeable software. Service: source factory, custom design per site/budget, one-stop delivery, 24h hotline, 2-year warranty.
6.2 Applicable Standards
GB 7251.1 (LV assemblies), GB 50054 (LV distribution design), GB 14048.2/.4/.6 (breakers, contactors, soft starters/VFDs), GB 12668 (VFDs), GB 27901-2011 (fire smoke exhaust fans), GB 50116 (fire alarm), national water-supply/drainage and ventilation construction codes, KNX standard, Modbus standard; electrical construction acceptance codes.
7. System Architecture and Working Principle
7.1 Overall Architecture
Five training subsystems (water supply/drainage, ventilation/AC, LV distribution, intelligent lighting, environmental-control/BAS monitoring) integrated under one BAS platform: field devices (pumps, fans, dampers, valves, AC units, lighting) -> local control (PLC boxes, control cabinets, KNX bus) -> BAS master PLC + remote RI/O -> supervisory workstation (configuration software) -> ISCS integrated monitoring; interface gateway connects to the automation training room.
7.2 Water Supply/Drainage Working Principle
Sewage collects in the stainless lifting tank; float/hydrostatic sensors detect levels; the PLC control box starts submersible pumps alternately (auto-coupling for maintenance-free lifting); over-limit levels trigger dual-pump parallel operation and alarms. The semi-vacuum unit: the water-ring vacuum pump evacuates the tank and piping; when the lifting device’s level reaches the set point its diaphragm valve opens and sewage is drawn into the vacuum tank; at high level the sewage pump discharges while the vacuum pump stops; at low level the cycle repeats — fully PLC-automated, data uploaded to BAS.
7.3 Ventilation/AC Working Principle
Fans draw/expel air through the duct system; combined dampers switch air paths and modulate flow with electric actuators, hard-interlocked with fans (valve open -> fan start; fan stop -> delayed valve close); multi-leaf dampers receive 4-20mA from BAS for continuous regulation; butterfly valves control water circuits; split and VRV units provide cooling/heating with refrigerant circuits; all statuses feedback to the environmental-control cabinet and BAS.
7.4 LV Distribution and Lighting Principle
The 20kVA distribution box supplies all circuits with graded protection and SPD; the MNS draw-out cabinet feeds motors via soft starters (smooth start) and VFDs (speed regulation) with motor protection relays; the KNX system controls LED luminaires through 0-10V dimming controllers driven by touchscreen, panels and sensors (presence/illuminance) with scenes and time schedules; the KNX-RS485 gateway bridges lighting to BAS.
7.5 BAS Principle
The master PLC collects data from all subsystems (via RS485/Modbus to water and HVAC controllers, KNX gateway for lighting), executes mode control (ventilation, sewage, lighting modes), time schedules and alarm handling; remote RI/O stations simulate field signal acquisition; the supervisory software provides graphical interfaces, trends, reports and user permissions; ISCS integrates all systems for cross-system linkage; the interface gateway enables joint commissioning with the automation training room.
8. Detailed Technical Design
8.1 Water Supply/Drainage Subsystem
Lifting tank (x2): 304 stainless, 1000x1000x1050mm, per unit. Submersible sewage pump (x4): 50WQ/S219-1.5, 1.5kW, 380V 3ph, 10m3/h, 15m head, DN50, large-flow anti-clog impeller (passes phi30mm), dual mechanical seals, IP55, F-class. Auto-coupling (x4): DN50 cast iron + stainless rails. Level devices: adjustable float brackets (304), cable float switches (x8), hydrostatic transmitters 4-20mA 0-1m (x2). Pump control box (x2): one-control-two, PLC, touchscreen, communication; manual/auto/BAS remote; alternating operation with standby; over/under-level, dry-run, over-temperature, water-leakage protections. Valves: check H41X-16 DN50, gate Z41X-16 DN50, rubber flexible joints KXT-16 DN50; pressure gauge Y-100 0-0.6MPa with syphon and stop valve; DN50 galvanized closed-loop piping with fittings and supports. Semi-vacuum unit: vacuum tank (carbon steel Q235-B, phi800x1500mm, ~0.5m3, -0.1~0.1MPa, working -30~-65kPa, argon-arc welded, epoxy-lined, >=15 years); vacuum work station (water-ring vacuum pump 1.5kW 0.8m3/h -65kPa 1450rpm mechanical seal IP55 <=65dB + non-clogging sewage pump 1.5kW 8m3/h 12m DN50 passing phi30mm); steam-water separator (phi300x600, separation >=95%, auto refill/drain); 304 electrode level rods (x4, DC24V, passive, IP68); vacuum digital pressure gauge (-100~0kPa, 0.5 class, 4-20mA + relay, 316L probe); vacuum sewage lifting device (50L PE, normally-closed full-port diaphragm valve, backwash, blockage alarm, DN50 in/DN40 vacuum); accessory packs (x2: solenoid water valve DN15 AC220V, solenoid gas valve DN25 AC220V, ball valves, flexible joints, spare diaphragm valve, check valve, probes, local control box); PLC control box (IP54 wall-mounted, text display, manual/auto, vacuum/level/blockage logic, RS485 Modbus to BAS, AC380/220V); vacuum piping (galvanized steel >=3.0mm, NBR seals, 24h vacuum hold test with <=5% drop).
8.2 Ventilation and AC Subsystem
Single-speed fire fan (x2): YFIAM-500D4-2.2-SR axial, cast-aluminum airfoil impeller (10 blades, phi500, G2.5 balance), 10000m3/h, 316Pa total / 200Pa static, 1450rpm, 2.2kW 380V IP55 H-class motor (280 degC 60min), 85kg, GB 27901-2011. Dual-speed fan (x2): YFIAM-500D4/6, 2.2/0.7kW, high 8500m3/h 233Pa 1450rpm / low 5737m3/h 106Pa 960rpm, 250 degC 60min, speed switching via contactors. Mounts: 8# channel steel with rubber dampers; fire canvas flexible joints (silicone-titanium, <=280 degC, 200mm, flanged). Electric combined damper (x2): 1000x1000mm (4 x 500×500 units), 8#/10# channel frame hot-dip galvanized, double-layer galvanized opposed blades, leakage <=164m3/(h·m2) @2000Pa, max pressure >=2000Pa, full stroke 60s, <=45dB, effective area >=80%, actuator AC220V 500N·m IP65 with manual handle and 4-20mA feedback, control box with local/remote, hard interlock with fans. Electric multi-leaf damper (x2): 600x600mm, 6 galvanized blades, leakage <=2% @800Pa, 0-90 degC stepless, equal-percentage, full stroke <=30s, actuator AC220V 4-20mA in/out 200N·m IP54 with manual, control box to BAS. Electric butterfly valve (x2): D971X-16, DN150, 1.6MPa, ductile iron body, EPDM soft seat zero leakage, 0-90°, >=100k cycles, switch actuator AC220V 300N·m, mechanical + electrical limits, open/close/fault dry contacts, hand wheel, control box IP54 with BAS interface. Split heat-pump AC (x2): 5.0kW cooling / 5.5kW heating, 380V/3N/50Hz, R410a, level-2+ efficiency, DC-inverter compressor, wall/floor indoor unit 800m3/h <=42dB, IPX4 outdoor <=55dB, display stand for observation with gauge ports. Multi-split VRV (x2): 1 outdoor (14.0kW cool / 16.0kW heat, DC-inverter scroll compressor, backup operation, refrigerant leak detection with auto alarm/cutoff, auto-restart) + 2 four-way cassette indoor units (3.6kW each, condensate pump, Chinese LCD controllers) + central controller (weekly schedule, scenes, permissions) + Modbus-RTU RS485 BAS interface with hard emergency-stop.
8.3 LV Distribution and Intelligent Lighting Subsystem
Distribution box (x2): cold-rolled steel >=1.5mm powder coated RAL7035, IP30 wall-mounted, AC380/220V 3-phase 5-wire, 20kVA, main MCCB 63A 3P 25kA, 4 x 32A 3P power circuits + 4 x 16A 2P lighting circuits + 2 spares, SPD 4P 20kA, RCD 30mA on socket circuits, digital multifunction meter (V/I/P/PF/energy), panel display windows, CCC components, GB 7251.1/GB 50054. KNX intelligent lighting (Siemens, x2 sets): 7″ touchscreen (800×480, 32-bit color, 64MB RAM/128MB Flash, KNX + RS485 + optional Ethernet, >=20 pages/210 objects, weekly schedules, >=64 scenes, page passwords, RTC, custom boot screen, IP54 front); 4-channel 0-10V dimming controller (16A/channel resistive, mechanical relays >=100k cycles, 0.1-100% dimming with selectable curves, soft start, per-channel current detection for lamp-fault, switching counts, runtime accumulation, sequential start, fire dry-contact interface, KNX status feedback <=5s); 4-gang manual panel (free-programmable, LED indicators, scene control, built-in bus coupler, fireproof PC, IP40); KNX-RS485 protocol converter (Modbus-RTU, DC24V, data-point mapping); bus coupler (9600bps, isolated); KNX power supply (DC30V 640mA with choke, OCP/SCP, AC220V); dual-tech presence sensor (PIR + microwave, phi6m/120°, adjustable sensitivity/delay 10s-30min); illuminance sensor (0-10000lux, +-5%, constant-illuminance control); 4 x LED tube lamps (18W, 4000K, >=100lm/W, 0-10V 5-100%, >=50,000h, T8); central monitoring software (permanent license, Chinese GUI, device/status/alarm/scene/schedule/report/permissions).
8.4 Environmental-Control Electrical and Control Cabinets
MNS draw-out cabinet (x2): 800x1000x2200mm, steel >=2.0mm RAL7035, IP40, functional-unit separation, mechanical interlock (work/test/isolated positions), main busbar 400A copper, B-class insulation, GB 7251.1; components (Schneider): incoming NSX160B with MicroLogic 5.2E (long delay Ir 0.4-1xIn, short delay Isd 2-10xIr, instantaneous Ii 10-20xIn, ground-fault Ig, metering, Modbus, 160A, 25kA); feeder NSX100N motor type (32/63A, 50kA, zero arcing); LC1D18 contactors (18A AC220V, 2NO+2NC, mech 10M/elec 1M cycles); LRD21C thermal relays (12-18A, phase-loss, temp compensation, test button); small plug-in relays (4NO4NC 5A/250VAC); ATS480 soft starters (7.5kW, 17A, start voltage 20-100%, start current 125-559%, start/stop time 0-360s, voltage ramp/current limit/torque control, free/soft/pump stop, full protection, 4DI/3RO/1AO 4-20mA, LCD Chinese, Modbus, GB 14048.6); ATV320 VFDs (7.5kW, 17A, 0-500Hz, V/F + sensorless vector + torque control, built-in PID, energy optimization, 2-16kHz carrier, 6DI/3RO/2AI/1AO, Modbus standard, detachable Chinese panel, GB 12668); M200 gateway PLC (32-bit, <=0.04us, 3M program/512K data, SD to 256M, 64DI/4AI max, Ethernet Modbus TCP + RS485 Modbus RTU, SoMachine); intelligent motor protection relays (overload, underload, stall, phase-loss/unbalance, earth/leakage, over/under-voltage, tE, measurement, RS485 Modbus, x6); digital meters (0.5 class, RS485, x2); training motors (1.5/2.2kW 380V 4-pole 1450rpm IP55 F-class, x4). Relay protection configuration: incoming — instantaneous short, short-delay short, overcurrent, ground; motor feeders add overload/phase-loss. Control cabinet (x2): wall-mounted 600x800x200mm IP54, small PLC (16DI/8DO/4AI/2AO), 24VDC/5A PSU, actuator drive modules, terminals, run/fault LEDs, local/remote switch.
8.5 BAS and Integrated Monitoring
Master PLC (x2): Schneider/Siemens high-end, 32-bit dual-core, 8M program/4M data, <=0.02ms/1000 instructions, >=1024DI/128AI expansion, 2x Ethernet (Modbus TCP, Profinet) + 2x RS485 (Modbus RTU), CPU/power redundancy, -40~+70 degC. Remote RI/O (x2): 32DI/16DO (relay)/8AI (4-20mA)/4AO, 12-bit, IP20, DIN rail, field bus. Supervisory IPC (x2): i5, 8GB DDR4, 256GB SSD + 1TB HDD, 22″ display, Windows 10 Pro. Configuration software (x2): mainstream licensed; graphical station process diagrams, real-time data, remote control, mode control, time schedules, alarm management (real-time/history/grade/print), trend curves, daily/monthly/annual reports, multi-level users with operation records, >=1 year history, >=512 IO points. ISCS software (x2): integrates BAS, lighting, water supply/drainage; global overview; cross-system linkage; unified alarms/events; comprehensive reports; C/S or B/S; OPC/Modbus/ODBC interfaces. Simulated carrier platform (x2): floor-standing console with acrylic panel and silk-screen process diagram, LED simulated device states, operation buttons, fault switches for fault-finding training. Interface gateway (x2): Modbus TCP over RJ45, opto-isolated, bidirectional data with the automation training room for joint commissioning.
8.6 Auxiliaries and Layout
Tool cabinets (x2, 1800x900x400mm), file cabinets (x2, 1800x850x390mm), training desks/chairs (x2 dual-seat, fireproof top 1200x600x750mm), LED lighting (36W single-tube pendant, desk illuminance >=300lx); layout: zoned disciplines, strong/weak separation, safety distances, centralized control/console, reserved expansion; cable trays (strong 200×100 1.2mm, weak 100×100 1.0mm, spacing >=300mm, grounded), galvanized conduits, top-in/top-out wiring with crimped terminals and labels, shielded cables single-end grounded; water piping galvanized screwed with flange valve connections, closed loop, drain points; ducting galvanized with flange joints, fire canvas joints, anti-sway supports, leak-rate compliance.
9. Recommended Configuration and Preliminary Budget
9.1 Configuration Summary
Water/drainage: 2 lifting tank sets (tank, 2 pumps, coupling, floats, hydrostatic, control box, valves, piping) + 1 semi-vacuum set (tank, work station, separator, level rods, vacuum gauge, lifting device, accessory packs, control box, piping). Ventilation/AC: 2 single-speed + 2 dual-speed fans with mounts/soft joints; 2 combined dampers; 2 multi-leaf dampers; 2 butterfly valves with control boxes; 2 split AC sets; 2 VRV 1-to-2 sets; duct auxiliaries. LV/lighting: 2 distribution boxes; 2 Siemens KNX lighting sets (touchscreen, dimmer, panel, gateway, coupler, PSU, sensors, 8 lamps, software); 2 MNS cabinets with full Schneider components and training motors; 2 control cabinets. BAS: 2 master PLCs, 2 RI/O, 2 IPC, 2 config software, 2 ISCS, 2 platforms, 2 interface gateways, cabling. Auxiliaries: cabinets, desks, lighting. Installation/commissioning (trays, cables, conduits, piping, ducts, equipment, wiring, single-machine, integration, acceptance).
9.2 Budget Notes
Price includes equipment, installation, commissioning, training and 2-year warranty; cables/ducts/pipes billed by actual quantities; transport, VAT and training included; custom layout and additional modules quoted separately. Tax-inclusive in RMB (CNY) only — no foreign-currency conversion. Total schedule ~50 days (30-45 for standard scope, adjustable).
10. Technical Specifications
10.1 System Specification Summary
| Item | Specification |
|---|---|
| Water/drainage | 2 x 304 lifting tanks (1000x1000x1050) + 4 x 1.5kW submersible pumps (10m3/h, 15m, DN50, passes phi30) with auto-coupling, floats + hydrostatic; PLC one-control-two boxes (manual/auto/BAS, alternating, full protection); 1 x semi-vacuum set: phi800x1500 tank 0.5m3 (-30~-65kPa), water-ring pump 0.8m3/h -65kPa, sewage pump 8m3/h 12m, separator >=95%, electrode rods IP68, vacuum gauge 0.5 class, 50L lifting device with diaphragm valve, PLC box IP54, vacuum piping with 24h hold test <=5% |
| Ventilation/AC | 2 x single-speed fire fans 10000m3/h 316Pa 2.2kW H-class 250 degC/60min (GB 27901); 2 x dual-speed 8500/5737m3/h 2.2/0.7kW; 2 x combined dampers 1000×1000 (leakage <=164m3/h·m2, 500N·m IP65, fan hard interlock); 2 x multi-leaf dampers 600×600 (4-20mA, equal-percentage, <=2% leakage); 2 x butterfly valves DN150 1.6MPa EPDM (300N·m); 2 x split AC 5.0/5.5kW R410a; 2 x VRV 1-to-2 (14/16kW, DC inverter, Modbus) |
| LV/lighting | 2 x 20kVA distribution boxes (63A 3P 25kA main, 4x32A + 4x16A + SPD 20kA + RCD 30mA); 2 x Siemens KNX sets (7″ touchscreen, 4ch 0-10V dimmer 16A, panels, gateway, coupler, PSU 30V/640mA, presence/illuminance sensors, 8 x 18W LED, software); 2 x MNS draw-out cabinets (400A busbar, NSX160B Mic5.2E, NSX100N, ATS480, ATV320, M200 PLC, motor relays, meters, training motors); 2 x control cabinets (small PLC 16DI/8DO/4AI/2AO, IP54) |
| BAS | 2 x master PLC (dual-core, 8M/4M, Modbus TCP/RTU, redundancy); 2 x RI/O (32DI/16DO/8AI/4AO); 2 x IPC (i5/8G/256G+1T/22″); 2 x config software (512 points); 2 x ISCS; 2 x simulated platforms; 2 x Modbus TCP interface gateways (opto-isolated) |
| Auxiliaries | Tool/file cabinets, training desks, LED lighting >=300lx; strong/weak trays spaced >=300mm, galvanized conduits, closed-loop water piping, ducted ventilation |
| Schedule | ~50 days total (30-45 standard); 2-year warranty; 7×24 support; 2h response; 24h on-site |
10.2 Standards Compliance
GB 7251.1, GB 50054, GB 14048.2/.4/.6, GB 12668, GB 27901-2011, GB 50116; KNX and Modbus standards; national electrical/water/drainage/ventilation construction codes; CCC-certified components; per GB 50303 electrical acceptance.
11. Key Advantages and Customer Value
11.1 Technical Advancement
Mainstream-brand equipment (Schneider, Siemens) identical to real metro stations — students learn exactly what they will operate; standard protocols (Modbus, KNX) for open architecture; true industrial-grade devices (not teaching models) with identical operating parameters, methods and fault behavior.
11.2 Comprehensive Training
Full five-discipline coverage reproducing the complete station electromechanical picture; five training levels (cognition, operation, maintenance, fault finding, system integration); multi-scenario simulation (normal, fault, emergency) developing comprehensive handling ability.
11.3 Safety and Reliability
Per-circuit overload/short/leakage/phase-loss protection; device overheat/water-leakage/overpressure protection; locked HV circuits with authorized operation; fault simulation with auto-recovery; standard construction with neat wiring, clear labels, reliable earthing.
11.4 Extensibility
Modular subsystems — independent purchase and upgrade; reserved IO and communication points for future AC, elevator, fire modules; upgradeable software (new subjects, assessment, 3D simulation).
11.5 Service Guarantee
Source Manufacturer Supply; custom design per site/budget with free multiple schemes; one-stop design-production-installation-commissioning-training-maintenance; 24h hotline; 2-year warranty; dedicated after-sales follow-up.
12. Technical Q&A (50+ Items)
12.1 Water Supply and Drainage
Q1: Pump control box control modes?
A: Manual (panel buttons), auto (level signals, alternating with standby), BAS remote (commands from BAS with full status upload).
Q2: Pump protections?
A: Electrical: overload, short, phase-loss, leakage; motor: overheat (winding thermistor), water leakage (oil-chamber detection); logic: ultra-low-level dry-run, ultra-high-level dual-pump, run-timeout.
Q3: Semi-vacuum system principle?
A: Vacuum pump evacuates tank/piping; level at the collector opens the diaphragm valve and sewage is drawn in by pressure difference; at high tank level the sewage pump discharges while the vacuum pump stops; at low level the cycle repeats.
Q4: Why both float and hydrostatic level instruments?
A: Float = switch signal for reliable start/stop logic; hydrostatic = analog continuous level for display, trends and precise control; redundant and educational for both principles.
Q5: Purpose of the auto-coupling device?
A: Automatic docking/sealing of pump to discharge pipe via rails — lift for maintenance without entering the tank; the standard metro sump installation.
Q6: Why the steam-water separator?
A: Separates water mist from vacuum pump exhaust; recovered water recirculates to the pump (saves water), preventing corrosion/ponding in exhaust piping.
Q7: External water source needed?
A: No — closed-loop: tank -> pump -> piping -> tank; only initial fill required.
Q8: Vacuum tank volume basis?
A: Buffers one suction volume and maintains vacuum during sewage-pump operation; 0.5m3 fully satisfies the training system with moderate footprint.
Q9: Why large-flow impeller?
A: Sewage contains fibers/particles; large-flow anti-clog impeller passes phi30mm solids — the defining difference from clean-water pumps.
Q10: BAS interface?
A: RS485 Modbus-RTU from the control box: pump run/fault/auto-manual status, real-time level, high/low-level alarms; receives remote start/stop.
Q11: Vacuum hold test?
A: After installation, 24h vacuum hold with <=5% drop required — verifies piping and seal integrity.
Q12: Level electrode rod working principle?
A: Conductive liquid completes the electrode circuit, outputting a passive switch signal; no moving parts, reliable in sewage.
12.2 Ventilation and Air Conditioning
Q13: Single-speed vs dual-speed fans?
A: Single-speed for smoke exhaust or fixed flow; dual-speed high gear for exhaust/large ventilation, low gear for daily ventilation — energy-saving, the metro standard.
Q14: Why can fire fans withstand high temperature?
A: H-class motor insulation (180 degC) plus metallic impeller/housing and special cooling — runs 60+ minutes in 250 degC smoke per fire-ventilation codes.
Q15: Fan-damper hard interlock?
A: Hard-wired: fan starts only after the damper’s open-limit signal; on fan stop the damper closes after delay — prevents duct overpressure damage and airflow surge.
Q16: 4-20mA damper signal?
A: 4mA = closed (0°), 20mA = open (90°), linear in between; BAS outputs control, actuator feedbacks actual opening — closed-loop regulation.
Q17: Damper leakage significance?
A: Directly affects system efficiency and energy: excessive leakage loses flow/pressure and raises fan energy; metro dampers must meet strict leakage limits at working pressure.
Q18: Butterfly vs air dampers?
A: Air dampers regulate airflow (rectangular/round multi-blade); butterfly valves regulate water flow (circular wafer, higher sealing) — the two core regulator types of air and water systems.
Q19: VRV to BAS integration?
A: Outdoor unit’s communication port converts to standard Modbus-RTU via gateway: on/off, mode, temperature setpoint, fault query; BAS receives status and refrigerant-leak alarms.
Q20: Why mounts and flexible joints?
A: Vibration isolation from structure (reduces structural-borne noise); canvas joints compensate installation error and block vibration/heat transfer to ducts.
Q21: Dual-speed switching?
A: Changing motor winding connection changes pole count (4/6-pole): high 1450rpm, low 960rpm, switched by contactors in the control cabinet.
Q22: Fan noise components?
A: Aerodynamic (flow impact, vortex), mechanical (motor/bearing), vibration (resonance); airfoil impeller + dampers + soft joints control all three.
Q23: Fire fan standard?
A: GB 27901-2011; 250 degC/60min smoke duty verified by type test.
12.3 LV Distribution and Intelligent Lighting
Q24: Why draw-out structure?
A: Each circuit an independent drawer — pull out and replace with a spare for fast recovery; mechanical interlock prevents live plugging; flexible circuit expansion.
Q25: Long/short-delay/instantaneous trip roles?
A: Long delay = overload (inverse time); short delay = near-end short with time grading for selectivity; instantaneous = severe short, fast clearing — complete graded protection.
Q26: Soft starter vs VFD?
A: Soft starter: smooth start, lower start current, bypass after start, limited speed range; VFD: soft start plus stepless speed regulation with energy saving and rich protection — fans/pumps use VFDs.
Q27: ATS480 start voltage range?
A: Heavy-duty: 20-100% Ue, start time 0-360s; standard: 50-100%, 0-60s — set per load for optimal start.
Q28: ATV320 vector control advantage?
A: Simulates DC-motor control: precise torque control, high low-speed torque, accurate speed, fast response — superior to V/F for fans, pumps, conveyors.
Q29: KNX features?
A: International building-control bus standard; distributed control (single device failure doesn’t affect the system); software-configurable functions without rewiring; expandable; seamless BAS/fire integration.
Q30: 0-10V dimming principle?
A: Controller outputs 1-10V to LED drivers; 1V = minimum, 10V = maximum; driver adjusts output current accordingly — stepless dimming.
Q31: Scene control?
A: One-key recall of preset multi-lamp brightness/on-off states, e.g. “teaching mode” (all 100%), “projection mode” (main off, background 30%) — via touchscreen or panel.
Q32: Motor protection relay functions?
A: Integrated measurement (3-phase V/I/P/energy), protection (overload, phase-loss, unbalance, earth, stall), direct control, and bus upload to PLC — intelligent motor management.
Q33: Why SPD in the distribution box?
A: Suppresses lightning-induced and switching over-voltages, clamping to safe levels to protect components and downstream equipment — mandatory LV protection.
Q34: KNX power supply role?
A: DC30V/640mA with bus choke powers bus devices; overcurrent/short-circuit protected.
Q35: Presence sensor dual-tech?
A: PIR + microwave dual detection avoids false triggers; auto-on when present, auto-off when absent, with adjustable delay.
12.4 BAS and Integration
Q36: Metro BAS functions?
A: Centralized monitoring/auto control/scheduling of HVAC, water supply/drainage, lighting, elevators — safe efficient operation; fire-mode coordination under disasters.
Q37: Three-layer BAS architecture?
A: Field layer (sensors/actuators/devices), control layer (master PLC, remote IO), supervision layer (workstations/servers/displays) — connected by bus and Ethernet.
Q38: Mode control?
A: Pre-set operating modes (morning, night, normal ventilation, blocked, fire smoke-exhaust) — one-key trigger runs all related equipment per logic without individual operation.
Q39: ISCS vs BAS?
A: ISCS is the higher integrated system bringing BAS, FAS, SCADA, AFC, platform doors onto one platform for information sharing and cross-system linkage; BAS is a subsystem uploading to ISCS.
Q40: Remote RI/O role?
A: Field-mounted IO collects signals and outputs commands, communicating with the master PLC over bus — less cabling, higher reliability, distributed control.
Q41: Integration commissioning contents?
A: Communication links; single-point remote control; linkage logic (fan-damper, level linkage); mode control; fault alarm/linkage tests.
Q42: BAS alarm functions?
A: Device fault, parameter over-limit (level, temperature), communication fault, power fault; graded popup; recorded history queryable/printable; alarm-linked actions.
Q43: Automation-room interface precautions?
A: Unified protocol and data-point table; electrical isolation; clear data direction and control authority (no conflicts); joint test cases.
Q44: Configuration software points?
A: >=512 IO; graphical diagrams, real-time data, control, modes, schedules, alarms, trends, reports, permissions, >=1 year history.
12.5 Construction and Service
Q45: Construction period?
A: ~30-45 days standard (prep 3, trays 7, installation 10, wiring 8, single-machine 5, integration 7, trial 7, acceptance 3 = ~50 with trial); adjustable by scale.
Q46: Warranty?
A: 2 years from acceptance — free on-site repair, non-human parts, software upgrades, periodic inspection; 7×24 hotline, 2h response, 24h on-site.
Q47: Training content?
A: Theory (principles, equipment, standards, 1 day) + practice (local operation, cabinet operation, software, maintenance, fault finding, 2 days) + comprehensive drill and assessment (1 day); certificates issued.
Q48: Daily maintenance?
A: Electrical: cleaning, terminal tightening, fans; pumps/fans: bearing lubrication, seals, impeller cleaning; valves: stem exercise, seal lubrication; software: data backup, communication check.
Q49: Site-customized layout?
A: Yes — free survey and customized design per room size/shape/height/power conditions, multiple options to maximize space and teaching needs.
Q50: Why choose KITOZER/Lain?
A: Real industrial-grade equipment matching metro standards, five-discipline full coverage, standard-protocol open architecture, safety-compliant construction, source-factory one-stop service and 2-year warranty.
13. Construction Schedule
13.1 Overall Schedule (~50 Days, Standard Scope)
| Stage | Work | Duration | Responsibility | Coordination |
|---|---|---|---|---|
| 1 Preparation | Survey; drawing review and disclosure; material/equipment arrival inspection; crew/tools in | 3 days | PM | Owner provides power/water and site coordination |
| 2 Trays/conduits | Marking and anchors; tray supports; strong/weak trays; galvanized conduits; water-pipe supports | 7 days | Crew leader | Cross-work coordination |
| 3 Equipment installation | Control/distribution cabinets; tanks, pumps, vacuum equipment; fans, dampers, AC units; console and monitoring devices | 10 days | Crew leader | Device arrival acceptance |
| 4 Wiring/termination | Power cable laying/termination; control and communication cabling; in-cabinet wiring and crimping; sensor/actuator wiring; earthing system | 8 days | Electrician leader | Power-off safety disclosure |
| 5 Single-machine commissioning | Insulation tests; pre-power checks; per-device power-on; local control functions; protection functions; parameter setting | 5 days | Debug engineer | Factory technical support |
| 6 System integration | Communication network; monitoring data verification; intra-subsystem linkage; cross-system joint commissioning; fault simulation and alarms | 7 days | Debug engineer | Owner technicians accompany |
| 7 Trial run | 72h continuous run; data logging; parameter optimization; rectification | 7 days | Debug engineer | Owner duty support |
| 8 Acceptance | As-built documents; function demo and acceptance tests; acceptance meeting; sign-off | 3 days | PM | Owner organizes acceptance |
13.2 Schedule Assurance
Experienced PM and crew with all trades, dynamically adjusted; pre-stocked core equipment avoiding waiting; daily/weekly plans with morning/evening meetings and deviation correction; cross-trade scheduling to reduce interference; contingency plans for device delay/design change.
14. Construction Organization and Quality/Safety Measures
14.1 Organization
PM (schedule/quality/safety/cost, coordination); technical lead (scheme, drawing disclosure, problem solving, acceptance); crew leader (site organization, dispatch, progress); electrician crew (electrical/weak-current/control); pipe crew (water/drainage and duct work); debug engineer (device commissioning, integration, software); safety officer (management, inspection, education).
14.2 Preparation
Technical: review drawings/scheme/codes with disclosure; detailed drawings and wiring diagrams with circuit numbers and terminal mapping; material list and procurement plan; special training for special processes. Site: verify floor/wall/power/earthing; plan material/tool/temp-office areas; temporary power and lighting; finished-surface protection. Tools: welder, cutter, impact/hand drills, pipe bender, crimpers, multimeter, megger, earth tester — checked ready.
14.3 Main Workmanship
Trays: line marking per design; angle-steel supports by expansion bolts at compliant spacing (denser at bends); tray joints with connector plates and bolts, bonding jumpers for electrical continuity; full-length earthing with both ends grounded and additional points every 30m; clean and cover after. Electrical wiring: cable insulation check before laying; no pulling/pressing, correct bend radius; matched lugs crimped and tinned; in-cabinet wiring horizontal/vertical with clear numbers matching drawings (max 2 wires per terminal); shielded cables single-end grounded with firm shield termination; all cables/valves labeled with circuit number and endpoints. Piping: prefabrication per drawings (threaded or welded) with anti-corrosion treatment; uniform supports at correct elevation; PTFE tape on threads, gaskets on flanges with even bolt tightening; hydraulic test at 1.5x working pressure, 30min no leakage; flushing until clear. Equipment: foundation check (size, level, strength); joint unpacking with model/spec/quantity/accessory verification and appearance check; rigging/leveling with shims; anchor bolts, piping and electrical connections; manual rotation check before power-on trial (current, vibration, noise, temperature).
14.4 Quality Control
Three-inspection system (self, mutual, handover) gating every process; incoming materials with certificates — unqualified never used; strict national codes, drawings and scheme — no unauthorized design changes; records synchronized (hidden works, tests, commissioning); finished-product protection.
14.5 Safety and Civilized Construction
Three-level safety education; certified special-operations personnel; safety disclosure before each process; temporary power with three-level distribution/two-level protection, locked boxes, dedicated management, no random connections; height work with belts and sturdy scaffolds, no throwing; fire extinguishers, hot-work permits with watchmen, flammable material control; tidy storage, daily waste removal, work-clean-restore; noise control outside rest hours.
15. After-Sales Service
15.1 Warranty
2-year whole-project warranty from acceptance — free repair/replacement of non-human, non-force-majeure faulty parts; free software upgrades and maintenance; quarterly phone follow-up, semi-annual on-site inspection, annual full system check with reports.
15.2 Response
7×24 hotline; 2h initial solution; 24h engineer on site (remote areas negotiated); emergency faults — engineer departs within 4h; standard spare parts within 48h from the local stock.
15.3 Post-Warranty
Lifetime maintenance at cost; annual maintenance contracts (regular inspection, priority service, preferential parts); system function upgrades, equipment expansion and software updates.
15.4 Service Process
Report (phone/WeChat/email) -> register -> remote diagnosis -> on-site repair if needed -> customer confirmation -> satisfaction follow-up -> archive; supervision hotline with open commitments.
16. Training Plan
16.1 Training Objectives and Audience
Training objectives: through systematic training, enable management personnel to fully understand the system structure, working principles and performance characteristics, master daily operation methods and inspection/maintenance essentials, identify common faults and handle simple problems, ensuring safe, stable and long-term operation.
Training audience: management and O&M personnel designated by the client, recommended 2-3 persons with basic electrical and equipment knowledge.
16.2 Tiered Training Content System
Level 1: Basic operation training (1 day)
– Basic principles: system concepts, structure composition, performance indicators;
– Daily operation standards: correct operation of equipment, control and safety systems;
– Daily inspection contents: daily/weekly/monthly check items;
– Safety precautions: usage prohibitions and emergency handling procedures.
Level 2: Maintenance training (1 day)
– Detailed structure of each subsystem and working principles;
– Daily maintenance methods: cleaning, fastening checks, routine care;
– Common fault identification and simple handling;
– Emergency handling procedures for power failure, fire and equipment faults.
Level 3: Advanced management training (as needed)
– Performance influencing factors and how to avoid degradation;
– Upgrade and expansion knowledge and specification requirements;
– Relevant national standards interpretation.
16.3 Training Methods and Schedule
– Methods: combination of “theory explanation + on-site practice + Q&A interaction”;
– Schedule: training arranged at the completion acceptance stage, synchronized with handover, 2 days of intensive training total; time flexibly adjustable; a free repeat training session is provided for newly assigned personnel.
16.4 Training Assessment and Documentation Delivery
– Assessment: theory written test plus practical operation; training qualification certificates issued upon passing; supplementary training for those who fail;
– Documentation delivery: complete O&M documentation, including operation and maintenance manual, equipment manuals and certificates, completion drawings and hidden work records, test reports and after-sales service contact card, all bound into volumes.
17. Anonymous Typical Project Scenarios
All project scenarios below are anonymous, generalized examples provided for reference only. No real customer names, addresses or identifiable details are disclosed.
17.1 Urban Rail Transit Operator Training Base Electromechanical Training Room
Background. An urban rail operator needed pre-job and on-the-job skills training for station electromechanical O&M staff.
Solution. Environmental-control electrical, water supply/drainage, ventilation/AC and intelligent lighting training systems built fully to real metro-station equipment configurations.
Results. Stable operation with training content matching job requirements; new-staff onboarding period greatly shortened; hands-on capability of O&M staff significantly improved — highly rated by the customer.
17.2 Transport Vocational College Rail Electromechanical Training Room
Background. A vocational college’s urban rail electromechanical technology program needed a comprehensive training room supporting core courses.
Solution. Comprehensive electromechanical training room with teaching courseware and training guides covering environmental control and water supply/drainage course practicals.
Results. Supported professional practical teaching; student skill levels notably improved; students won awards in a provincial rail skills competition; the room was rated a provincial demonstration training base.
17.3 Metro Group Training Center Environmental-Control BAS System
Background. A metro group needed to upgrade its environmental-control training system with assessment capability.
Solution. Upgraded with a BAS integrated monitoring platform, multi-split AC training units and a fault-simulation assessment system achieving training-assessment integration with auto scoring.
Results. Complete functions with practical assessment — greatly improved training efficiency; became the designated assessment venue for in-group skill-level certification.
18. SEO Optimization Section
All reference prices in this technical solution are in RMB (CNY) only and are for reference purposes; final quotation is subject to the confirmed configuration.
18.1 Keyword System
– Core keywords: technical design solution, system configuration, technical parameters, construction and O&M services;
– High-conversion long-tail keywords: design solution, configuration list, technical parameters, construction plan, after-sales service;
– Industry traffic keywords: system architecture, applicable standards, technical Q&A, project cases;
– Brand keywords: KITOZER, Guangzhou Lain.
18.2 SEO Tag System
– Title tag: the article title — Guangzhou Lain KITOZER;
– Meta description: Guangzhou Lain professionally provides complete technical design solutions with detailed configuration list, full-system product technical parameters, construction organization plan and after-sales service — source manufacturer customization, compliant performance, third-party testing supported;
– H1 tag: the article title;
– H2 tags: system design and product parameters, construction organization plan, after-sales service and training, engineering cases.
18.3 Internal Link Anchor Text
– Core anchor text: technical design solution, system construction;
– Long-tail anchor text: configuration list, technical parameters, construction plan;
– Related anchor text: shielding cabinet, micro-module cold aisle, integrated computer room, outdoor cabinet.
19. Official Contact Information
– Company Name: Guangzhou Lain Intelligent System Development Co., Ltd.
– Brand: KITOZER (Pioneer)
– Official Website: https://gdlain.com
– Tel: +86 139 2228 9957 (WeChat available), +86 185 2066 8845 (WeChat available)
– Address: No. 5 Huashan Road, Shilou Town, Panyu District, Guangzhou, China
For any inquiries about this technical design solution, configuration customization, quotation or construction services, please contact us through the information above. We provide free design consultation and tailored solutions for your specific requirements.