Oversize your UPS and you waste money on efficiency at low load. Undersize it and your equipment shuts down at the worst moment. Here is the step-by-step method professional electrical engineers use to size a KITOZER online UPS.
Table of Contents
Step 1: List All Loads
Tag every device that will plug into the UPS. Record watts from the nameplate. Include servers, switches, storage, monitors, and any auxiliary equipment. Do not forget the PDU overhead and cooling fans.
Step 2: Convert Watts to VA
Most IT equipment has a power factor of 0.9-1.0. VA = Watts / PF. For mixed loads, use 0.9 as a conservative multiplier. Example: 10,000W total / 0.9 = 11,111VA minimum.
Step 3: Apply 20-30% Growth Margin
You will add servers. Multiply by 1.25. 11,111VA x 1.25 = 13,889VA. Round up to the next standard size: 15kVA or 20kVA. Operating at 50-70% load gives the best efficiency and longest battery life.
Step 4: Calculate Battery Runtime
Battery runtime depends on load percentage and battery capacity. Rule of thumb: a fully charged 10kVA UPS with internal batteries delivers about 5-10 minutes at full load. For 30+ minutes, add external battery cabinets. KITOZER supports parallel battery strings for extended runtime.
Step 5: Decide Redundancy
N+1 redundancy means one extra UPS module in parallel. For critical systems, 2N (fully redundant) eliminates single points of failure. KITOZER UPS systems support up to 8 units in parallel.
Send your load list to +86 13922289957 for a free sizing calculation and KITOZER UPS recommendation.