3m×7m Battery Room Cabinet-Type Non-Piped HFC-227ea Fire Suppression System

Table of Contents

Technical Design Solution

Prepared by: Guangzhou Lain Intelligent System Development Co., Ltd.

Date: August 2026

Contents

– 1. Company Introduction

– 2. Project Overview

– 3. User Requirement Analysis

– 4. System Design

– 5. Recommended Configuration and Reference Budget

– 6. Detailed Technical Specifications

– 7. Core Advantages and Customer Value

– 8. Technical Q&A

– 9. Construction Schedule

– 10. Construction Organization, Quality and Safety Measures

– 11. After-Sales Service

– 12. Training Plan

– 13. Anonymous Typical Project Scenarios

– 14. SEO Optimization

– 15. Official Contact Information

1. Company Introduction

Established in 2002, Guangzhou Lain Intelligent System Development Co., Ltd. is a high-tech enterprise integrating research and development, production, sales and engineering implementation, specializing in computer room construction, shielded rooms, integrated data cabinets, micro-module cold-aisle containment, outdoor cabinets, intelligent shielding equipment and fire protection supporting systems. The company owns its proprietary brand KITOZER (meaning “Pioneer”), holds multiple product patents and industry qualifications, and has been deeply engaged in the industry for more than 20 years, accumulating rich project experience and technical expertise.

Adhering to the product philosophy of “efficient, green, innovative, safe and convenient”, the company develops tailored turnkey solutions for the individual needs of customers across different industries. Its service coverage spans data centers, communications and power, medical and industrial, and government and enterprise sectors, earning recognition and trust from customers at home and abroad. Supported by a flexible custom-manufacturing plant and a professional technical team, the company supplies directly from its source factory. A comprehensive quality control system is in place, and all products undergo strict standard benchmarking and third-party testing to guarantee delivery quality and lead times.

On the service side, the company provides full-lifecycle services from solution design, manufacturing, installation and commissioning to after-sales operation and maintenance, backed by a 7×24 technical support channel that responds quickly to customer needs, with dedicated personnel following each project through its entire cycle — delivering high-quality, reliable and worry-free one-stop intelligent system solutions.

2. Project Overview

2.1 Project Background

With the rapid development of energy storage technology and industrial automation, battery rooms, battery storage rooms and energy storage compartments are now widely deployed in data centers, substations and industrial plants. Battery equipment carries inherent safety risks of thermal runaway and short-circuit ignition during operation. Battery fires spread quickly and are difficult to extinguish, and traditional water sprinkler and dry-powder extinguishing can easily cause secondary damage to equipment, failing to meet the protection requirements of precision electrical environments.

Clean-agent fire suppression has therefore become the preferred solution for battery room fire protection. This project addresses a 3 m × 7 m industrial battery room, designed with a cabinet-type (pre-engineered) non-piped HFC-227ea fire suppression system. Through total-flooding extinguishment, the system provides efficient protection for battery equipment and electrical circuits, combining extinguishing effectiveness with equipment safety.

2.2 Project Profile

Parameter Value
Protected area Industrial battery room / battery storage room
Protected area dimensions 7 m (L) × 3 m (W), typical clear height 3.0 m, net volume ≈ 63 m³
Protected objects Battery banks, associated power distribution cabinets, electrical circuits
Fire types Electrical fires, solid surface fires
System type Cabinet-type (pre-engineered) non-piped HFC-227ea fire suppression system
Design organization Guangzhou Lain Intelligent System Development Co., Ltd.

2.3 Project Objectives

– Establish a gas fire suppression protection system compliant with national fire protection codes, implementing the complete fire-fighting logic of early detection, staged alarming and automatic delayed discharge.

– Use clean HFC-227ea extinguishing agent: residue-free, non-corrosive and non-conductive extinguishing that causes no secondary damage to batteries or electrical equipment.

– Provide triple actuation — automatic, electrical manual and mechanical emergency — balancing operating reliability with operational safety and reducing the risk of accidental discharge.

– Adopt a non-piped cabinet structure requiring no dedicated cylinder room or complex agent piping; quick to install and adaptable to the existing battery room layout, with minimal impact on site during construction.

– Include audible/visual warning, discharge indication and automatic pressure relief safety devices to safeguard personnel evacuation and the building envelope.

– Ensure the whole process complies with national fire protection codes, meeting fire acceptance inspection and work-safety management requirements.

3. User Requirement Analysis

3.1 Core Functional Requirements

– Fire detection and alarming: continuously monitor smoke and temperature changes within the protected area, identify fire hazards at an early stage, issue staged audible/visual alarms and interlock associated fire protection equipment.

– Automatic extinguishing: once the dual smoke + heat detection alarm logic is satisfied, automatically start the extinguishing unit after a delay and discharge HFC-227ea for total-flooding extinguishment.

– Manual control: support local emergency start and emergency stop, with switchable automatic/manual control modes to suit different operation and maintenance scenarios.

– Status feedback: provide real-time feedback of system operation, fire alarm, discharge and fault status for local and remote monitoring by operations personnel.

– Safety protection: configure discharge indicator lights, audible/visual alarms, automatic pressure relief vents and other supporting devices to protect personnel and building structure safety.

3.2 Product Selection Requirements

– Use a 150 L cabinet-type non-piped HFC-227ea extinguishing unit; no main agent piping is required, and the unit is installed directly on the floor inside the protected area.

– The extinguishing agent is fire-grade HFC-227ea, meeting national fire product standards — clean and environmentally friendly.

– The fire alarm and linkage control system uses mature, stable addressable devices precisely linked with the extinguishing unit for reliable control logic.

– All equipment meets industrial-grade environmental requirements — stable operation, low failure rate, and suitability for the indoor battery room environment.

3.3 Construction and Operation & Maintenance Requirements

– Construction must minimize impact on the existing battery room environment; conduit routing shall be neat, compliant and aesthetically acceptable, with a rational equipment layout.

– The system shall be simple to operate, easy to inspect in routine patrols, and inexpensive to maintain.

– Complete technical training and after-sales service shall be provided so that operations personnel become proficient in system operation and common fault handling.

3.4 Code Compliance Requirements

The entire process — system design, equipment selection, construction and installation, commissioning and acceptance — shall comply with the current national codes and standards, including the *Code for Design of Gas Fire Extinguishing Systems*, the *Code for Design of Automatic Fire Alarm System*, and the *Cabinet Type Gas Fire Extinguishing Equipment* standard, and shall satisfy fire acceptance inspection requirements.

Technical Design Solution

4. System Design

4.1 Design Basis

The system design is based on the following Chinese national codes and standards (cited as reference):

– GB 50370-2017 – *Code for Design of Gas Fire Extinguishing Systems* (气体灭火系统设计规范)

– GB 16670-2006 – *Cabinet Type Gas Fire Extinguishing Equipment* (柜式气体灭火装置)

– GB 50116-2013 – *Code for Design of Automatic Fire Alarm System* (火灾自动报警系统设计规范)

– GB 50263-2007 – *Code for Construction and Acceptance of Gas Fire Extinguishing Systems* (气体灭火系统施工及验收规范)

– GB 50166-2019 – *Standard for Construction and Acceptance of Automatic Fire Alarm System* (火灾自动报警系统施工及验收标准)

– GB 18614-2012 – *Fire Extinguishing Agent Heptafluoropropane (HFC-227ea)* (七氟丙烷(HFC227ea)灭火剂)

– Other applicable national and local fire protection regulations, technical codes and standards

Note: The Chinese standards cited above are provided as reference citations. The governing standard editions and their scope of application shall be confirmed against the specific project and the latest national regulations in force at the time of design, construction and acceptance.

4.2 Protected Area Design Parameters

Parameter Design Value Remarks
Protected area dimensions 7 m (L) × 3 m (W) × 3.0 m (H) Typical clear height of an industrial battery room
Net volume of protected area 63 m³ Theoretical value before deducting equipment volume
Enclosure fire resistance rating ≥ 0.5 h Meets gas extinguishing protected-area requirements
Enclosure allowable internal pressure ≥ 1200 Pa Overpressure protection provided by relief vent
Ambient temperature range -10 °C ~ +50 °C Normal indoor operating conditions
Design extinguishing concentration 8% Value adopted for electrical fires per code
Soaking (hold) time ≥ 5 min Required for electrical fires
Agent discharge time ≤ 10 s Per cabinet-type unit code requirements

4.3 Design Principles

– Safety and reliability: safety is the primary principle; mature and stable technology and equipment are adopted, with multiple actuation and protection mechanisms that ensure extinguishing effectiveness while avoiding accidental discharge that could harm personnel or equipment.

– Code compliance: design, selection and construction strictly follow current national fire protection codes, ensuring the system passes fire acceptance and meets work-safety management requirements.

– Economy and practicality: while meeting protection needs and code requirements, the configuration is optimized to control project cost and reduce later operation/maintenance costs, delivering high cost-effectiveness.

– Easy O&M: modular, integrated equipment with simple structure and easy operation, convenient for routine inspection and maintenance.

– Green and environmental: clean HFC-227ea agent with zero ozone-depletion potential, no residue after discharge and no corrosion to equipment — consistent with the green fire protection concept.

4.4 HFC-227ea Extinguishing Mechanism

HFC-227ea (heptafluoropropane) is a clean gaseous extinguishing agent whose extinguishing mechanism combines physical and chemical inhibition:

– Physical cooling: stored as a liquid, HFC-227ea rapidly vaporizes on discharge, absorbing a large amount of heat and quickly lowering the temperature of the protected area and of burning surfaces, thereby destroying the thermal conditions of combustion.

– Chemical inhibition: at high temperature, HFC-227ea decomposes to produce fluorine-containing free radicals that combine with active radicals in the combustion reaction (H·, OH·, etc.), interrupting the chain reaction and suppressing combustion at the chemical level for rapid extinguishment.

– Total-flooding coverage: once vaporized, HFC-227ea becomes a gas that quickly and uniformly fills the entire protected area, reaching every corner for dead-angle-free total-flooding extinguishment — well suited to battery rooms with complex equipment layouts.

Thanks to its excellent dielectric properties, non-corrosiveness and residue-free extinguishing, HFC-227ea is ideal for protecting electrical equipment, precision instruments and battery equipment without causing secondary damage.

4.5 Extinguishing Agent Quantity Calculation

According to GB 50370-2017, the design quantity of HFC-227ea is calculated using the following formula:

W = K × (V / S) × (C / (100 − C))

Where:

– W — design quantity of HFC-227ea (kg)

– K — altitude correction factor; taken as 1.0 for altitudes below 300 m

– V — net volume of the protected area (m³); 63 m³ for this project

– S — specific volume of HFC-227ea superheated vapor (m³/kg), calculated as S = 0.1269 + 0.000513 × T

– T — minimum ambient temperature of the protected area (°C); taken as 10 °C for a normal indoor environment

– C — design extinguishing concentration (%); 8% for electrical fires

Calculation process:

– Specific volume: S = 0.1269 + 0.000513 × 10 = 0.13203 m³/kg

– Design quantity: W = 1.0 × (63 / 0.13203) × (8 / 92) ≈ 41.5 kg

Considering equipment volume displacement, opening leakage allowance and safety margin, the design charge for this project is 45 kg. The 150 L cylinder has a maximum allowable charge density of 1.15 kg/L, i.e. a maximum charge of 172.5 kg; 45 kg is far below this limit and fully complies with code requirements.

4.6 Pressure Relief Vent Area Calculation

When the agent discharges, the internal pressure of the protected area rises rapidly, so an automatic pressure relief vent is required to protect the building envelope. Based on the simplified calculation in the code, for this 63 m³ protected area with a single 150 L unit, one mechanical automatic pressure relief vent with an effective relief area of 0.09 m² (300 mm × 300 mm) is sufficient.

The vent is installed on an exterior wall at a position above two-thirds of the clear height. It remains closed in normal service to maintain airtightness, opens automatically when the internal pressure exceeds the opening threshold, and closes automatically when the pressure falls back.

4.7 System Composition

The cabinet-type non-piped HFC-227ea fire suppression system for this project comprises four major subsystems:

– Cabinet extinguishing unit (main body): integrates the cabinet body, agent storage cylinder, container valve, electromagnetic actuator, high-pressure hose, atomizing nozzle, pressure switch, siphon tube and fixing clamps — the core execution unit for agent storage and discharge.

– Fire detection subsystem: point-type photoelectric smoke detectors, point-type heat detectors and matching bases, responsible for real-time fire monitoring and alarm signal acquisition.

– Linkage control subsystem: a single-zone gas extinguishing controller as the core, with emergency start/stop buttons, auto/manual transfer switch, fire audible/visual alarms and discharge indicator, realizing the complete control logic of alarm, delay, actuation and feedback.

– Safety protection and auxiliary materials: mechanical automatic pressure relief vent, firestop sealing kit, flame-retardant cables, hot-dip galvanized conduit, junction boxes and grounding kit, ensuring compliant installation and safe operation.

4.8 System Operating Principle

4.8.1 Automatic Control Mode

When a fire occurs in the protected area:

– Stage-1 alarm: when smoke concentration reaches the threshold, the smoke detector actuates, the controller triggers a stage-1 alarm and the in-area audible/visual alarm starts, prompting on-site personnel to verify the situation.

– Stage-2 confirmation: as temperature continues to rise, the heat detector actuates; with both detectors in alarm, the controller confirms the fire, triggers a stage-2 audible/visual alarm and simultaneously starts a 30 s delay countdown to prompt personnel evacuation.

– Linkage shutdown: during the delay period, the controller interlocks to close ventilation systems, fire dampers, air conditioning and other equipment, maintaining the airtightness of the protected area.

– Agent discharge: after the delay elapses, the controller outputs a DC24V actuation signal, energizing the electromagnetic actuator to open the container valve; HFC-227ea is atomized through the nozzle and discharged into the protected area for total-flooding extinguishment.

– Signal feedback: after discharge, the rise in line pressure actuates the pressure switch, feeding back the discharge signal to the controller while illuminating the discharge indicator outside the protected area door to warn personnel not to enter.

– System reset: after extinguishment, the protected area is fully ventilated; once confirmed safe, the system is reset and returns to normal monitoring status.

4.8.2 Electrical Manual Control Mode

When on-site personnel discover a fire, they can directly press the emergency start button outside the protected area door, and the system starts the extinguishing unit through the same delay/discharge sequence. If a false alarm is identified during the delay period, the emergency stop button can be pressed to abort the start sequence and avoid accidental discharge.

4.8.3 Mechanical Emergency Operation Mode

When both automatic control and electrical manual control fail (e.g. power loss, controller failure, burned-out wiring), trained professionals open the cabinet door, remove the safety pin, press the mechanical emergency handle and manually open the container valve to release the extinguishing agent.

4.9 Equipment Layout Design

– Cabinet extinguishing unit: floor-mounted against a wall inside the battery room, clear of the front operating aisle of the battery banks; the nozzle faces the center of the protected area; a maintenance clearance of no less than 0.5 m is reserved around the unit; fixed with expansion bolts.

– Fire detectors: two smoke detectors and two heat detectors evenly arranged on the ceiling, covering the entire protected area, avoiding positions directly above ventilation openings and heat-generating equipment — no detection blind zones.

– Audible/visual alarms: one inside the protected area and one outside the door, mounted at a height of 2.2–2.5 m, conspicuous and easily identifiable.

– Emergency start/stop button and auto/manual transfer switch: wall-mounted at a height of 1.3–1.5 m beside the door for convenient operation, key-locked to prevent inadvertent operation.

– Discharge indicator: mounted at the center above the protected area door at a height of 2.0–2.2 m; steady-on warning during discharge.

– Gas extinguishing controller: wall-mounted in the corridor outside the protected area or in the duty room at about 1.5 m height for convenient operation and monitoring.

– Automatic pressure relief vent: installed on an exterior wall above two-thirds of the clear height, clear of personnel traffic areas.

5. Recommended Configuration and Reference Budget

5.1 Recommended Configuration List

The recommended configuration for this project is listed below. The preliminary unit price ranges shown are market reference estimates in RMB (CNY) provided for early-stage budget planning only; final pricing is subject to the company’s formal quotation.

Group I — Cabinet HFC-227ea Extinguishing Unit (Main Body)

No. Equipment / Material Specification / Model Unit Qty Preliminary Unit Price (RMB) Remarks
1 Cabinet body 1.5 mm cold-rolled steel, electrostatic powder coating, approx. 540 × 500 × 2000 mm unit 1 5,000 – 8,000 Fire-engine red, with door lock
2 HFC-227ea storage cylinder 150 L, welded steel cylinder, design pressure 4.2 MPa pcs 1 3,000 – 4,500 With cylinder cap and anti-vibration ring
3 HFC-227ea extinguishing agent Fire-grade HFC-227ea, purity ≥ 99.6% kg 45 150 – 260 /kg Design charge including safety margin
4 Container valve (cylinder head valve) Forged copper alloy, DN32, integral pressure gauge and safety rupture disc pcs 1 1,500 – 2,500 Electric + manual dual actuation
5 Electromagnetic actuator DC24V / 1.5A, with mechanical emergency handle and safety pin pcs 1 800 – 1,500 Matches the container valve
6 High-pressure connection hose 304 stainless steel, DN32, 500 mm length pcs 1 300 – 600 High pressure and corrosion resistant
7 Pressure signal feedback device DC24V dry contact, piston type pcs 1 400 – 800 Discharge signal feedback
8 Full-direction atomizing nozzle 360° diffusion type, chrome-plated brass pcs 1 500 – 900 Uniform atomization, wide coverage
9 Agent siphon tube 304 stainless steel, matched to 150 L cylinder depth pcs 1 300 – 500 Ensures complete agent discharge
10 Cylinder mounting clamp Metal clamp + anti-vibration rubber pad set 1 200 – 400 Firmly secures the cylinder

Group II — Fire Alarm and Linkage Control System

No. Equipment / Material Specification / Model Unit Qty Preliminary Unit Price (RMB) Remarks
1 Single-zone gas extinguishing controller Wall-mounted, AC220V supply, DC24V backup unit 1 4,500 – 7,000 System control core
2 Point-type photoelectric smoke detector Addressable, DC24V, sensitivity class II pcs 2 150 – 300 Smoke detection
3 Point-type heat detector Addressable, class A2R, fixed temperature 57 °C pcs 2 150 – 300 Temperature detection
4 Universal detector base Type 86, flame-retardant plastic pcs 4 20 – 50 Matching installation
5 Fire audible/visual alarm Addressable, DC24V, sound pressure ≥ 85 dB pcs 2 250 – 450 One inside the area, one outside the door
6 Emergency start/stop button Key-locked, addressable pcs 1 250 – 450 On-site manual control
7 Discharge indicator DC24V, high-brightness “discharge – do not enter” display pcs 1 300 – 600 Warning outside the door
8 Auto/manual transfer switch Key-locked, two-position pcs 1 250 – 450 Mode switching

Group III — Pressure Relief and Safety Protection Devices

No. Equipment / Material Specification / Model Unit Qty Preliminary Unit Price (RMB) Remarks
1 Mechanical automatic pressure relief vent 300 mm × 300 mm, gravity type, normally closed pcs 1 1,200 – 2,000 Automatic overpressure relief
2 Firestop sealing kit Organic firestop putty + firestop pillows + firestop sealant set 1 300 – 600 Sealing of openings and gaps

Group IV — Installation Accessories and Electrical Items

No. Equipment / Material Specification / Model Unit Qty Preliminary Unit Price (RMB) Remarks
1 Flame-retardant shielded control cable RVVP 2×1.5 mm² m 100 5 – 8 /m Signal transmission lines
2 Flame-retardant power cable BV 2.5 mm² m 50 3 – 5 /m Equipment power supply lines
3 Hot-dip galvanized conduit DN20, wall thickness 1.2 mm m 80 8 – 15 /m Cable protection routing
4 Flame-retardant junction box Type 86 pcs 12 10 – 25 Wiring and branching
5 Installation fixing accessories Expansion bolts, screws, cable ties, conduit clips, etc. lot 1 300 – 600 Installation support
6 System grounding kit BVR 6 mm² ground wire + ground terminal set 1 200 – 400 Safety earthing

Group V — Engineering Service Costs

No. Equipment / Material Specification / Model Unit Qty Preliminary Unit Price (RMB) Remarks
1 Transport, installation, commissioning and acceptance support Including labor, auxiliary materials and technical services item 1 8,000 – 15,000 Turnkey project

The configuration and budget shown in this document are provided for preliminary design, technical discussion and budgetary reference only. They do not constitute a formal commercial quotation from Guangzhou Lain Intelligent System Development Co., Ltd. Final product selection, quantities, specifications and pricing are subject to the actual project requirements and the company’s formal quotation.

5.2 Preliminary Reference Budget

The following summary consolidates the preliminary unit price ranges into a reference total budget range (RMB/CNY, tax excluded):

Cost Item Preliminary Reference Range (RMB)
Cabinet HFC-227ea extinguishing unit (main body) 18,800 – 31,400
Fire alarm and linkage control system 5,900 – 9,800
Pressure relief and safety protection devices 1,500 – 2,600
Installation accessories and electrical items 1,900 – 3,600
Engineering services (transport, installation, commissioning, acceptance) 8,000 – 15,000
Total (reference estimate, tax excluded) ≈ 36,000 – 62,000 RMB

The above ranges are preliminary reference estimates intended for early-stage budget planning only; actual pricing depends on the final configuration, quantities and prevailing market conditions.

The configuration and budget shown in this document are provided for preliminary design, technical discussion and budgetary reference only. They do not constitute a formal commercial quotation from Guangzhou Lain Intelligent System Development Co., Ltd. Final product selection, quantities, specifications and pricing are subject to the actual project requirements and the company’s formal quotation.

6. Detailed Technical Specifications

6.1 Cabinet HFC-227ea Extinguishing Unit — Overall Parameters

Parameter Value
Model GQQ150/2.5
Type Pre-engineered cabinet HFC-227ea extinguishing unit (non-piped)
Nominal cylinder volume 150 L
Maximum charge 172.5 kg (charge density ≤ 1.15 kg/L)
Charge for this project 45 kg
Nominal working pressure 2.5 MPa (saturated vapor pressure at 20 °C)
Design pressure 4.2 MPa
Hydrostatic test pressure 6.3 MPa
Agent discharge time ≤ 10 s
Actuation modes Electric actuation; mechanical emergency manual actuation
Actuation voltage / current DC24V / ≤ 1.5 A
Signal feedback Dry contact; contact rating DC24V / 1A
Operating ambient temperature -10 °C ~ +50 °C
Relative humidity ≤ 95% (non-condensing)
Protection rating IP30
Cabinet material Quality cold-rolled steel, main body ≥ 1.5 mm
Surface treatment Acid pickling + phosphating + electrostatic powder coating, fire-engine red
Dimensions 540 mm (W) × 500 mm (D) × 2000 mm (H) (± 10 mm)
Installation Floor-mounted, fixed with expansion bolts
Governing standard GB 16670-2006 *Cabinet Type Gas Fire Extinguishing Equipment* (reference; governing edition confirmed per project)
Certification Conforms to national mandatory certification requirements for fire protection products

6.2 HFC-227ea Storage Cylinder

Parameter Value
Product Welded steel gas cylinder
Nominal volume 150 L
Nominal working pressure 4.2 MPa
Hydrostatic test pressure 6.3 MPa
Pneumatic leak test pressure 4.2 MPa
Design service life 20 years
Cylinder material Q345R pressure-vessel-grade steel
Manufacturing Integral welded construction, internal and external anti-corrosion treatment
Neck specification Standard cylinder thread, matching the container valve
Surface coating Epoxy powder electrostatic coating, fire-engine red, corrosion and weather resistant
Wall thickness ≥ 5 mm (designed per pressure vessel standards)
Charged medium HFC-227ea extinguishing agent + high-purity nitrogen pressurization
Inspection standard TSG 23-2021 *Regulation on Safety Technology for Gas Cylinders* (reference)
Accessories Cylinder cap, anti-vibration ring, mounting bracket

6.3 HFC-227ea Extinguishing Agent

Parameter Value
Chemical name Heptafluoropropane
Molecular formula CF₃CHFCF₃
Molecular weight 170.03
Purity ≥ 99.6%
Water content ≤ 10 ppm
Acidity ≤ 0.1 ppm
Nonvolatile residue ≤ 0.01%
Physical state Colorless, odorless gas at normal temperature; stored liquefied under pressure
Boiling point (atmospheric) -16.4 °C
Freezing point -131 °C
Critical temperature 101.7 °C
Critical pressure 2.91 MPa
Saturated vapor pressure (20 °C) 0.39 MPa
Liquid density (20 °C) 1.40 g/cm³
Gas density (20 °C, atmospheric) 7.1 kg/m³
Extinguishing concentration (electrical fires) 5.8% ~ 8%
Dielectric performance High dielectric strength; usable in energized equipment areas
Toxicity NOAEL (no-observed-adverse-effect level) concentration 9%; design concentration 8% is below the safety threshold
Environmental performance ODP (ozone depletion potential) = 0; GWP = 3500; meets Halon-replacement requirements
Extinguishing features Fast extinguishing, high efficiency, residue-free, non-corrosive, non-conductive
Governing standard GB 18614-2012 *Fire Extinguishing Agent Heptafluoropropane (HFC-227ea)* (reference)

6.4 Container Valve (Cylinder Head Valve)

Parameter Value
Product HFC-227ea container valve
Nominal diameter DN32
Nominal working pressure 4.2 MPa
Working pressure range 0 ~ 4.2 MPa
Actuation Electromagnetic actuation; mechanical emergency manual actuation
Sealing Dual sealing: metal hard seal + soft seal
Sealing performance Leak-free at nominal working pressure
Safety relief device Integral safety rupture disc; automatic overpressure relief for cylinder safety
Pressure gauge port Standard integral port with pressure gauge for real-time cylinder pressure monitoring
Refill port Dedicated refill port, refillable for repeated use
Valve body material HPb59-1 leaded brass, forged
Surface treatment Passivated, corrosion resistant
Connection thread Standard cylinder thread, matching the storage cylinder neck
Service life ≥ 10,000 actuation cycles
Ambient temperature -20 °C ~ +60 °C
Governing standard Complies with the valve technical requirements of GB 16670-2006 (reference)

6.5 Electromagnetic Actuator

Parameter Value
Product Gas extinguishing electromagnetic actuator
Rated working voltage DC24V
Rated working current ≤ 1.5 A
Actuation power ≤ 36 W
Response time ≤ 0.1 s
Driving force ≥ 150 N
Working stroke ≥ 8 mm
Reset method Manual reset
Mechanical emergency function Integral manual emergency actuation handle; can be triggered manually in the event of power loss
Safety device Safety pin to prevent inadvertent actuation during transport and commissioning
Housing material Aluminum alloy die-cast
Protection rating IP54
Ambient temperature -20 °C ~ +60 °C
Connection Crimp-type terminals
Compatibility Matches the corresponding container valve specification

6.6 Pressure Signal Feedback Device

Parameter Value
Product Gas extinguishing pressure switch
Type Piston type
Actuation pressure 0.5 ~ 1.0 MPa (adjustable)
Reset method Automatic reset
Contact form 1 set of normally open / normally closed dry contacts
Contact rating DC24V / 1A; AC220V / 0.5A
Nominal working pressure 4.2 MPa
Pressure withstand 6.3 MPa without damage
Interface G1/2″ female thread
Housing material Brass + engineering plastic
Protection rating IP65
Ambient temperature -20 °C ~ +60 °C
Function When the agent discharges, the rise in line pressure actuates the switch, feeding the discharge signal back to the controller

6.7 Full-Direction Atomizing Nozzle

Parameter Value
Product HFC-227ea atomizing nozzle
Type Full-direction centrifugal atomizing nozzle
Spray angle 360° full-direction diffusion
Nominal diameter DN25
Working pressure range 0.8 ~ 2.5 MPa
Flow coefficient K = 4.2 (± 5%)
Atomized droplet size Average particle size ≤ 100 μm
Spray uniformity ≥ 85%
Connection Female thread
Material HPb59-1 brass, chrome-plated surface
Orifice design Multi-orifice layout for wide spray coverage
Features Fully atomizes liquid HFC-227ea, accelerating vaporization and diffusion to quickly fill the protected area
Service life ≥ 10 years; corrosion resistant, not prone to clogging

6.8 High-Pressure Connection Hose

Parameter Value
Product Stainless steel metal bellows hose
Nominal diameter DN32
Nominal working pressure 4.2 MPa
Pressure test 6.3 MPa
Standard length 500 mm (custom lengths available)
Connection Female-threaded union fittings at both ends
Hose body material 304 stainless steel bellows
Braid material 304 stainless steel wire braided sleeve
Fitting material 304 stainless steel
Sealing Metal face seal
Ambient temperature -40 °C ~ +100 °C
Features Absorbs vibration, compensates for installation misalignment; high pressure resistance, corrosion resistant, excellent sealing

6.9 Agent Siphon Tube

Parameter Value
Material 304 stainless steel
Tube diameter Φ10 mm
Wall thickness 1 mm
Length Matched to the 150 L cylinder depth; tube end 5–10 mm above the cylinder bottom
Connection Threaded connection to the lower end of the container valve
Features Extends to the cylinder bottom, ensuring complete discharge of the agent and minimizing residual agent
Corrosion resistance Withstands long-term immersion in HFC-227ea and nitrogen; no rust, no impurity release

6.10 Cabinet Body

Parameter Value
Material Quality cold-rolled steel; main body ≥ 1.5 mm, door panel ≥ 1.2 mm
Structure Single-door vertical cabinet with integral cylinder mounting bracket
Surface treatment Acid pickling + phosphating + rust removal + outdoor-grade electrostatic powder coating, fire-engine red
Protection rating IP30; dust resistant, prevents finger contact with live internal parts
Door lock Dedicated lock to prevent operation by unauthorized personnel
Ventilation Ventilation openings at the lower part of the cabinet to keep the interior dry
Fixing Pre-drilled mounting holes at the base; fixed to the floor with expansion bolts
Dimensions 540 mm (W) × 500 mm (D) × 2000 mm (H)
Empty cabinet weight Approx. 65 kg
Governing standard Complies with the cabinet structure and strength requirements of GB 16670-2006 (reference)

6.11 Single-Zone Gas Extinguishing Controller

Parameter Value
Model JB-QB-GM01
Type Single-zone gas extinguishing control panel, wall-mounted
Power supply Main: AC220V ± 15%, 50 Hz; backup: DC24V / 7Ah sealed lead-acid battery
Power consumption Monitoring ≤ 10 W; alarm ≤ 50 W
Loop capacity 1 detection loop, up to 32 addressable points
Alarm functions Supports addressable smoke and heat detectors; two-stage alarming
Linkage outputs 1 × extinguishing start output DC24V / 2A, delay 0–30 s adjustable; 1 × discharge feedback input (dry contact); 2 × linkage relay outputs AC220V / 5A for audible/visual alarms, fire dampers, ventilation equipment, etc.
Delay function Multi-step adjustable: 0 s, 5 s, 10 s, 20 s, 30 s
Auto/manual switching Supports on-site auto/manual transfer switch; status displayed synchronously on the panel
Emergency start/stop Supports external emergency start/stop buttons; emergency stop possible during the delay period
Display Chinese LCD display + LED status indicators
Status indication Main power, backup power, fault, fire, delay, discharge, manual, automatic
Fault detection Self-diagnosis of main/backup power faults, loop faults, output line faults, detector faults, etc., with audible/visual fault indication
Event history Stores ≥ 1,000 event records, retained on power loss
Communication Optional RS485 interface for connection to the fire linkage control system
Operating environment 0 °C ~ +40 °C; relative humidity ≤ 95% (non-condensing)
Protection rating IP30
Installation Wall-mounted
Dimensions 380 mm (W) × 500 mm (H) × 120 mm (D)
Governing standards GB 4717-2005, GB 16806-2006 (reference)

6.12 Point-Type Photoelectric Smoke Fire Detector

Parameter Value
Model JTY-GM-GY01
Type Addressable, photoelectric smoke detector
Detection principle Scattered-light photoelectric detection
Sensitivity class Class II
Working voltage DC24V (bus powered)
Working current Monitoring ≤ 0.5 mA; alarm ≤ 2 mA
Alarm confirmation LED Red LED; flashes in monitoring, steady on in alarm
Addressing Electronic addressing, range 1–250
Coverage area 60 m² per detector at ceiling height ≤ 6 m
Protection radius ≤ 5.8 m
Operating environment -10 °C ~ +55 °C; relative humidity ≤ 95% (non-condensing)
Housing material Flame-retardant ABS engineering plastic
Protection rating IP33
Installation Ceiling-mounted with dedicated base
Dimensions Φ100 mm × 45 mm
Governing standard GB 4715-2005 *Point Type Smoke Fire Detectors* (reference)

6.13 Point-Type Heat Fire Detector

Parameter Value
Model JTW-ZOM-GW01
Type Addressable, fixed-temperature, class A2R
Detection principle Thermistor temperature detection
Actuation temperature 57 °C
Response class Class R (rapid response)
Working voltage DC24V (bus powered)
Working current Monitoring ≤ 0.5 mA; alarm ≤ 2 mA
Alarm confirmation LED Red LED; flashes in monitoring, steady on in alarm
Addressing Electronic addressing, range 1–250
Coverage area 20–30 m² per detector at ceiling height ≤ 8 m
Protection radius ≤ 3.6 m
Operating environment -10 °C ~ +60 °C; relative humidity ≤ 95% (non-condensing)
Housing material Flame-retardant ABS engineering plastic
Protection rating IP33
Installation Ceiling-mounted with dedicated base
Dimensions Φ100 mm × 45 mm
Governing standard GB 4716-2005 *Point Type Heat Fire Detectors* (reference)

6.14 Fire Audible/Visual Alarm

Parameter Value
Model SG-GS01
Type Addressable, integrated sound and visual alarm
Working voltage DC24V
Working current ≤ 150 mA
Sound pressure level ≥ 85 dB (at 3 m directly in front)
Tone Fire alarm warble tone
Light signal Red strobe, flash frequency ≥ 1 Hz
Addressing Electronic addressing, range 1–250
Actuation Bus addressable actuation / direct DC24V actuation
Operating environment -10 °C ~ +55 °C; relative humidity ≤ 95% (non-condensing)
Housing material Flame-retardant ABS engineering plastic
Protection rating IP43
Installation Wall-mounted
Dimensions 90 mm × 130 mm × 55 mm
Governing standard GB 26851-2011 *Fire Alarm Sound and/or Visual Signaling Devices* (reference)

6.15 Emergency Start/Stop Button

Parameter Value
Model JAP-GQ01
Type Addressable, key-locked
Function Dual buttons: emergency start + emergency stop
Working voltage DC24V
Working current ≤ 5 mA
Contact form Dry contact output
Operation Push-button with protective cover against inadvertent contact
Key lock Dedicated key required; operation by authorized personnel only
Status indication Integral start and stop status LEDs
Addressing Electronic addressing
Operating environment -10 °C ~ +55 °C; relative humidity ≤ 95% (non-condensing)
Housing material Flame-retardant ABS engineering plastic
Protection rating IP54
Installation Wall-mounted, type 86 box
Dimensions 86 mm × 86 mm × 30 mm
Governing standard Complies with the relevant requirements of GB 16806-2006 (reference)

6.16 Discharge Indicator

Parameter Value
Model FQ-GD01
Display content Red legend “DISCHARGE – DO NOT ENTER” (equivalent of the Chinese marking 放气勿入)
Working voltage DC24V
Working current ≤ 100 mA
Light source High-brightness LED
Display mode Steady-on display
Trigger mode Dry contact signal trigger / direct DC24V trigger
Visible distance ≥ 20 m
Operating environment -10 °C ~ +55 °C; relative humidity ≤ 95% (non-condensing)
Housing material Metal housing + acrylic panel
Protection rating IP40
Installation Wall-mounted above the door
Dimensions 300 mm (W) × 150 mm (H) × 40 mm (D)

6.17 Auto/Manual Transfer Switch

Parameter Value
Model ZH-GK01
Type Key-locked, two-position transfer switch
Positions Automatic / Manual
Working voltage DC24V
Contact form Dry transfer contacts
Key lock Dedicated key required; mode switching by authorized personnel only to prevent inadvertent operation
Status indication Integral automatic and manual status LEDs
Operating environment -10 °C ~ +55 °C; relative humidity ≤ 95% (non-condensing)
Housing material Flame-retardant ABS engineering plastic
Protection rating IP54
Installation Wall-mounted, type 86 box
Dimensions 86 mm × 86 mm × 30 mm

6.18 Mechanical Automatic Pressure Relief Vent

Parameter Value
Model XYK-0.09
Type Gravity type, normally closed automatic pressure relief vent
Effective relief area 0.09 m² (300 mm × 300 mm)
Opening pressure 800 ~ 1200 Pa (adjustable)
Closing pressure ≤ 500 Pa
Sealing performance Leakage ≤ 0.1 m³/(h·Pa) in the normally closed state
Body material Quality cold-rolled steel, electrostatic powder coating
Vane material Lightweight aluminum alloy vanes
Seal strip EPDM rubber; aging resistant, good sealing
Installation Wall-mounted, recessed into the wall
Dimensions 380 mm (W) × 380 mm (H) × 150 mm (D)
Wall opening 320 mm × 320 mm
Operating environment -20 °C ~ +60 °C
Features No power supply required; opens and closes automatically by gravity and differential pressure; automatic overpressure relief; normally closed for airtightness in service

6.19 Firestop Sealing Kit

Composition: organic firestop putty + firestop pillows + firestop sealant

Organic firestop putty

Parameter Value
Fire resistance rating ≥ 3 h
Appearance Plastic paste, dark gray
Density 2.0 × 10³ kg/m³
Service temperature -20 °C ~ +60 °C
Features Highly moldable; seals openings of various shapes; reusable; non-corrosive

Firestop pillows

Parameter Value
Fire resistance rating ≥ 3 h
Type 720
Outer material Fiberglass cloth
Filler Fire-resistant intumescent material
Features Expands on exposure to fire to seal gaps; easy to install

Function: seals cable wall-penetration openings and pipe gaps, maintaining the airtightness of the protected area and preventing fire spread.

Governing standard: GB 23864-2009 *Firestop Materials* (reference)

6.20 Installation Accessories

Flame-retardant shielded control cable (RVVP 2×1.5 mm²)

Parameter Value
Number of cores 2
Cross-section 1.5 mm²
Conductor material Oxygen-free copper
Insulation material PVC
Shielding Braided copper mesh, coverage ≥ 80%
Sheath material Flame-retardant PVC
Rated voltage 300/300 V
Flame-retardant class ZB
Service temperature -15 °C ~ +70 °C
Application Low-voltage signal transmission for detectors, buttons, signal feedback, etc.; strong anti-interference performance

Flame-retardant power cable (BV 2.5 mm²)

Parameter Value
Type Single-core solid conductor
Cross-section 2.5 mm²
Conductor material Oxygen-free copper
Insulation material Flame-retardant PVC
Rated voltage 450/750 V
Flame-retardant class ZB
Service temperature -15 °C ~ +70 °C
Application Power supply for the controller, audible/visual alarms and other equipment

Hot-dip galvanized conduit (DN20)

Parameter Value
Specification DN20, wall thickness 1.2 mm
Material Quality steel tube, hot-dip galvanized surface
Connection Threaded joints, with couplings, elbows and conduit clips
Corrosion resistance Uniform galvanized layer; corrosion resistant; long service life
Application Cable protection routing, compliant with fire wiring requirements

System grounding kit

Parameter Value
Ground wire BVR 6 mm² stranded copper flexible wire, yellow-green
Ground terminal Copper terminal
Ground resistance requirement ≤ 4 Ω
Application Reliable earthing of the cabinet and controller metal enclosures for electrical safety

Technical Design Solution

7. Core Advantages and Customer Value

7.1 Non-Piped Design — Easy Installation and Strong Adaptability

This solution uses a cabinet-type non-piped HFC-227ea extinguishing unit. No complex agent delivery piping is required and no dedicated cylinder room is needed: the unit is installed directly on the floor inside the protected area. The construction workload is small, the installation period is short, and the solution is ideally suited to retrofit projects in existing battery rooms, with minimal impact on the existing layout and equipment. The unit is compact and can be flexibly placed against a wall without occupying core operating space.

7.2 Clean Extinguishing — No Secondary Damage

HFC-227ea is a clean gaseous extinguishing agent: no residue, no dust during discharge, and it evaporates naturally after extinguishing with nothing left behind. It causes no corrosion, contamination or water damage to battery banks, electrical equipment or circuits, and no post-fire cleanup is required — minimizing loss and recovery costs after a fire. In addition, HFC-227ea has excellent dielectric properties and can be used in energized equipment areas: discharge without power shutdown avoids production interruptions caused by outages.

7.3 Multiple Protection Mechanisms — Safe and Reliable

The system provides three actuation modes — automatic, electrical manual and mechanical emergency — combining automation with reliability. Even under extreme conditions such as power loss or controller failure, extinguishing can still be initiated through mechanical emergency operation. The dual smoke + heat detection alarm logic effectively reduces the probability of false alarms and avoids losses from accidental discharge. The system has comprehensive self-diagnostic functions that monitor equipment faults in real time and provide early warning. Supporting safety devices — audible/visual alarms, discharge indication and automatic pressure relief — protect personnel evacuation and prevent damage to the building envelope.

7.4 High Extinguishing Efficiency — Fast Response

HFC-227ea combines physical cooling and chemical inhibition for fast extinguishing: initial-stage fires can typically be extinguished within 10 s of discharge, effectively containing fire spread and preventing the larger incidents that battery thermal runaway can cause. The total-flooding approach uniformly covers every corner of the protected area with no extinguishing blind zones — even gaps and concealed areas around equipment reach an effective extinguishing concentration.

7.5 Simple Maintenance — Long Service Life

The cabinet unit has a simple structure and modular design. Routine inspection only requires checking the pressure gauge and the controller status, so the maintenance workload is small. The storage cylinder has a design service life of 20 years; the agent is chemically stable and can be stored long-term without leakage, requiring only periodic pressure checks, keeping later operation and maintenance costs low. All equipment uses industrial-grade components with stable performance, low failure rates and long service life.

7.6 Code Compliant — Acceptance Assured

The solution strictly follows current national fire protection codes — including the *Code for Design of Gas Fire Extinguishing Systems*, the *Code for Design of Automatic Fire Alarm System* and the *Cabinet Type Gas Fire Extinguishing Equipment* standard — in design and equipment selection. All core equipment conforms to fire protection product certification requirements, and construction and commissioning follow the prescribed procedures, ensuring the project passes fire acceptance inspection smoothly and meets work-safety management requirements.

8. Technical Q&A

8.1 System Principles and Selection

Question Answer
What is a cabinet-type non-piped HFC-227ea fire suppression system? It is a pre-engineered extinguishing unit that integrates the agent storage cylinder, valve, nozzle and control components into a single cabinet. No external agent delivery piping is required: the unit is placed directly in the protected area and discharges agent directly into the area in a total-flooding manner when a fire occurs. Compared with piped systems, it is easier to install, lower in cost and more flexible in layout — ideal for small and medium-sized protected areas.
Why use an HFC-227ea system for a battery room instead of water sprinklers? A battery room is an electrical environment containing batteries, distribution cabinets and cables — energized equipment. Water sprinkler systems can cause short circuits, corrosion and water damage to equipment after discharge, with large secondary losses, and some lithium batteries may react more violently when exposed to water. HFC-227ea is a clean gas that is non-conductive, non-corrosive and residue-free, causing no secondary damage to electrical equipment — well suited to battery rooms, power distribution rooms and data rooms.
Is one 150 L unit enough for a 3m×7m battery room? At a typical clear height of 3 m, the protected area volume is 63 m³. For electrical fires the design extinguishing concentration is 8%, giving a calculated agent quantity of about 41.5 kg, charged at 45 kg with safety margin. A 150 L cylinder can hold up to 172.5 kg, so it fully accommodates the design charge; the discharge flow rate and coverage of a single unit satisfy the total-flooding requirement for the 63 m³ area and comply with the code.
Is HFC-227ea harmful to people? The NOAEL (no-observed-adverse-effect level) concentration of HFC-227ea is 9%, and the design extinguishing concentration for this project is 8% — below the safety threshold. In addition, the system provides a 30 s delay for evacuation before discharge, so personnel can leave the protected area before the agent is released; brief exposure will not cause injury. However, after discharge the area must be fully ventilated before personnel re-enter.
What is the difference between cabinet-type and suspended HFC-227ea units? Cabinet-type units are floor-mounted with larger cylinders (commonly 70 L, 90 L, 120 L, 150 L) and larger charges, suitable for larger protected areas; they are easier to maintain and provide more uniform discharge. Suspended units are ceiling-mounted with small volume and small charge, suitable for small spaces and local protection. For a 63 m³ battery room, a cabinet-type unit is the more appropriate choice.
Does HFC-227ea pollute the environment? HFC-227ea has an ozone depletion potential (ODP) of 0 and does not deplete the ozone layer; it is a Halon-replacement agent. Its global warming potential (GWP) is 3500 and its atmospheric lifetime is about 36 years. It is classified as a clean and environmentally friendly extinguishing agent that meets national fire protection and environmental requirements.

8.2 Installation and Construction

Question Answer
What are the installation requirements for a cabinet-type HFC-227ea unit? The unit should be floor-mounted against a wall inside the protected area, clear of passageways and equipment operating faces, with a maintenance clearance of no less than 0.5 m around it. It must be anchored to the floor with expansion bolts to prevent tipping. The nozzle should face the center of the protected area without obstruction. The installation environment temperature should be between -10 °C and +50 °C, away from direct sunlight and heat sources, and the unit must be reliably earthed.
Is a pressure relief vent mandatory? Where should it be installed? Yes, it is mandatory. When the agent discharges, the internal pressure of the protected area rises rapidly; without a relief vent, doors, windows and walls could be damaged. The vent should be installed on an exterior wall of the protected area, at a position above two-thirds of the clear height, not on the side facing personnel traffic, and away from the unit nozzle.
What are the wiring requirements? Fire protection circuits should be run in hot-dip galvanized steel conduit or flame-retardant PVC conduit and must not share a conduit with power circuits. Shielded cable is recommended for signal circuits to reduce electromagnetic interference. All splices must be made inside junction boxes with proper crimping — no loose connections. All metal enclosures and conduits must be reliably earthed, and circuits should be labeled for later maintenance.
The battery room has a ventilation system — does it need to be interlocked? Yes. When the system actuates, the ventilation system, fire dampers, air conditioning and similar equipment must be interlocked to close, otherwise the airflow could carry the agent away and prevent the protected area from reaching the extinguishing concentration, degrading extinguishing performance.
What should be noted when installing detectors? Detectors should be ceiling-mounted, avoiding positions directly above ventilation openings, supply air outlets, heat-generating equipment and beam bottoms. Detector spacing must comply with code requirements to ensure no detection blind zones. Detector bases must be firmly fixed with reliable wiring. Addressable detectors should have their address codes set in advance to correspond with the controller.

8.3 Operation and Maintenance

Question Answer
What routine inspections does an HFC-227ea system require? Routine inspection mainly covers: checking the gas extinguishing controller status for fault or fire indications; checking that the cylinder pressure gauge needle is within the green normal range; inspecting the appearance of detectors, alarms, buttons and indicators for damage; checking the cabinet and conduits for damage or corrosion; and checking that the relief vent vanes move freely without sticking. A monthly inspection is recommended as a minimum.
How often does the HFC-227ea agent need to be replaced? HFC-227ea is chemically stable and, under normal storage without leakage, can be used long-term. Per code requirements, the agent should be sampled and tested every 3 years; if purity, moisture content and other indices meet the standard, it can continue to be used. If leakage causes insufficient pressure, the agent should be topped up promptly. The cylinder undergoes a hydrostatic test every 5 years.
What should be done if the system discharges accidentally? In the event of accidental discharge, immediately shut down ventilation and evacuate personnel; after the agent has fully dissipated and the area has been ventilated, enter the site for inspection. Then contact professional maintenance personnel to reset the system, refill the agent, test equipment functions, investigate the cause of the accidental discharge and implement corrective measures.
How often should detectors be cleaned and calibrated? Point-type smoke detectors should be cleaned at least once a year to prevent dust accumulation from affecting sensitivity, and functionally calibrated every two years to ensure accurate detection. Heat detectors can have their actuation temperature tested every three years.
Will the system fail if it is not used for a long time? As long as routine inspection and maintenance are carried out — pressure normal and no equipment faults — the system remains in a ready state. The agent is stable and does not expire, but pressure and composition should be checked periodically. An annual maintenance agreement with professional personnel is recommended to keep the system reliably operational over the long term.

8.4 Safety and Compliance

Question Answer
Does this system require fire acceptance inspection? Yes. A gas fire suppression system is fire protection infrastructure. After completion it must undergo statutory fire acceptance inspection or filing before being put into service. This solution is designed strictly in accordance with national codes and all equipment carries qualified certification, so acceptance can be assured.
When is mechanical emergency operation used? Mechanical emergency operation is used when both automatic control and electrical manual control have failed — for example, fire-induced power loss, controller damage or burned-out wiring. It must be performed only by specifically trained personnel, and it must be confirmed that no one remains in the protected area before operating.
How should the auto/manual mode be selected? Should it be left in auto or manual? For normally occupied facilities, the manual mode can be selected during working hours and automatic mode outside working hours; for unattended facilities, automatic mode is recommended at all times. The auto/manual transfer switch outside the door is key-locked, so only authorized personnel can change modes, preventing inadvertent operation.
What should personnel do if a fire occurs in the battery room? On discovering a fire, first ensure personnel evacuation. If the system is in automatic mode, wait for the system to actuate after its automatic alarm and delay sequence; if in manual mode, press the emergency start button outside the door to initiate extinguishing; if both automatic and manual control fail, trained personnel perform mechanical emergency operation. After extinguishing, the area must be fully ventilated and confirmed safe before re-entry.

9. Construction Schedule

9.1 Overall Duration

The total construction period for this project is estimated at 7 calendar days, divided into six phases: construction preparation, equipment and material delivery, conduit and cable installation, equipment installation, system commissioning, and acceptance and handover. The schedule can be reasonably adjusted according to actual site conditions and the owner’s requirements.

9.2 Detailed Construction Schedule

No. Phase Duration (days) Main Work Content Responsible
1 Construction preparation 1 Site survey, technical disclosure, construction plan confirmation, materials list check, personnel and tool preparation, site safety briefing Project manager, technical lead
2 Equipment and material delivery 1 Transport of equipment and auxiliary materials to site, unpacking inspection, quantity and model verification, checking of product certificates and test reports, temporary storage and protection Project manager, warehouse keeper
3 Conduit and cable installation 2 Marking and layout, conduit installation and fixing, junction box installation, cable laying, continuity and insulation testing, opening preparation Crew leader, electrician
4 Equipment installation 2 Cabinet unit placement and anchoring, detector and base installation, audible/visual alarm installation, button and indicator installation, controller installation, relief vent installation, equipment wiring Crew leader, fire equipment installers
5 System commissioning 1 Circuit re-inspection, controller power-up and programming, detector functional tests, linkage logic tests, simulated discharge test, full functional check, rectification of issues Technical lead, commissioning engineer
6 Acceptance and handover 1 Compilation of as-built documentation, acceptance support for the owner and fire authority, operator training, handover of equipment and documents, acceptance sign-off Project manager, technical lead

9.3 Schedule Assurance Measures

– Complete site survey and technical disclosure in advance, defining the construction interface and requirements to avoid delays caused by on-site changes.

– Prepare equipment and materials in advance and deliver them on schedule to ensure continuous construction.

– Deploy an experienced construction crew with clear division of labor and flow-line working to improve efficiency.

– Establish a quality control plan so that work is done right the first time, reducing rework and rectification time.

– Coordinate with the owner in advance on site power supply, access times and related matters to keep construction moving smoothly.

– Reserve buffer time to cope with unexpected situations and minor scope changes.

Technical Design Solution

10. Construction Organization, Quality and Safety Measures

10.1 Construction Organization Structure

A dedicated project team is established for this project, comprising 1 project manager, 1 technical lead, 1 crew leader, 3 professional installers and 1 part-time safety officer, with clearly defined responsibilities to ensure smooth project delivery.

– Project manager: overall project management; coordinates relations between both parties; controls schedule, quality, cost and safety; drives overall project progress.

– Technical lead: detailed design development, technical disclosure, system commissioning and resolution of technical issues; ensures construction complies with codes and the design.

– Crew leader: on-site construction organization; arranges personnel and work sequences per plan; enforces construction codes and safety requirements; controls construction quality.

– Installers: carry out conduit and cable installation, equipment installation, wiring and other specific construction work; certified for their roles.

– Safety officer: on-site safety management; implements safety measures; identifies and eliminates hazards; ensures civilized and safe construction.

10.2 Construction Preparation

– Technical preparation: familiarize the crew with the design drawings and solution; conduct technical and safety briefings; clarify construction standards and acceptance criteria; verify equipment models, quantities and installation positions; confirm site conditions.

– Material preparation: procure materials per the configuration list; check quality certificates, test reports, CCC (China Compulsory Certification) marks and other quality documents for equipment and materials; non-conforming products are strictly prohibited from entering the site; deliver materials in advance with proper moisture-proof, theft-proof and damage-proof storage.

– Tool preparation: prepare rotary hammers, cutting machines, multimeters, crimping tools, wrenches, ladders and other construction tools and test instruments; ensure tools are in good working order and measuring instruments are within their calibration validity period.

– Site preparation: coordinate with the owner on construction power, site use and access times; clear the installation positions to provide working space; protect existing finished work to avoid damage to existing equipment and the building.

10.3 Main Construction Methods and Procedures

10.3.1 Conduit and Cable Installation

– Mark and lay out according to the design drawings, defining conduit runs and junction box positions — straight and level, neat and compliant.

– Use hot-dip galvanized steel conduit with threaded connections; apply conductive compound at joints to ensure electrical continuity; conduit fixing-point spacing complies with code requirements.

– Conduct continuity and insulation tests on cables before laying; only qualified cables may be drawn through conduit; circuits of different voltage levels or different systems must not share a conduit.

– Reserve sufficient length at both ends of cables and label them; splices in junction boxes use crimping with tinning and insulating tape wrapping.

– After completion, seal wall and floor penetration openings tightly with firestop putty.

10.3.2 Cabinet Extinguishing Unit Installation

– Position the unit per the design layout; level and plumb it; anchor the cabinet base to the floor firmly with expansion bolts.

– Check cylinder fixing: clamps tightened, anti-vibration pads in place; verify the container valve, pressure gauge and electromagnetic actuator are properly installed.

– Connect the high-pressure hose and nozzle; check sealing; verify the siphon tube is correctly installed.

– Connect the electromagnetic actuator and pressure switch circuits per the wiring diagram; label all wires.

10.3.3 Alarm and Control Equipment Installation

– Install detector bases flush on the ceiling, level and firm; after wiring, install the detector heads and confirm the address codes are correct.

– Install audible/visual alarms, emergency start/stop buttons, auto/manual transfer switches and discharge indicators at the design heights, firmly fixed and neatly aligned.

– Install the gas extinguishing controller on the wall about 1.5 m above the floor, firmly fixed, with neat wiring and clear labeling.

– Reliably earth the metal enclosures of all equipment; ground resistance meets the requirement.

10.3.4 Pressure Relief Vent Installation

– Cut the wall opening to the design dimensions and clean the opening edges.

– Set the vent into the wall, fix it firmly, and seal the surrounding gaps with firestop sealant.

– Check that the vanes open and close freely without sticking, and adjust the opening pressure to the design value.

10.4 Quality Assurance Measures

– Strictly implement the national fire protection construction and acceptance codes; construct per the design drawings and solution; no unauthorized design changes.

– All equipment and materials entering the site must carry quality certificates, test reports and CCC certification; non-conforming products are strictly prohibited from use.

– Implement a process acceptance system: after each process, self-inspection and mutual inspection are carried out; the next process starts only after acceptance.

– Pay particular attention to key control points: wiring quality, sealing, earthing reliability and linkage logic correctness.

– During commissioning, test every function item by item to ensure every device and every logic sequence is normal and reliable; keep commissioning records.

– Carry out acceptance per codes after completion and compile complete as-built documentation.

10.5 Safe and Civilized Construction Measures

– All construction personnel must wear safety helmets; work at height requires safety harnesses; site safety management rules must be observed.

– Temporary power supply must be connected in a compliant manner with residual current devices; no unauthorized wiring; prevent electric shock accidents.

– Hot work requires a hot-work permit, fire extinguishers on site and a dedicated supervisor; confirm no ignition sources remain before leaving.

– Site materials are stacked neatly; construction waste is cleared daily to keep the site clean and tidy (“work done, site clean”).

– Take care to protect existing equipment, walls and floors on site from damage.

– Strictly comply with the owner’s plant safety regulations, follow site management and conduct civilized construction.

– Hold a safety briefing before work each day and identify and eliminate hazards to ensure construction safety.

11. After-Sales Service

11.1 Warranty Period

This project provides a 2-year free warranty commencing from the date of acceptance. During the warranty period, equipment faults and quality issues not caused by human damage or force majeure are repaired free of charge, including replacement of parts.

11.2 Response Time

– A 7×24 service hotline is available for fault reports and technical consultation at any time.

– Upon receipt of a fault report, a telephone response is given within 1 hour to guide troubleshooting; if the issue cannot be resolved by phone, on-site arrival within 4 hours in urban areas and 8 hours in suburban areas.

– General faults are repaired within 24 hours; major faults within 72 hours; if timely repair is not possible, standby equipment is provided to keep the system operational.

11.3 Regular Inspection Service

During the warranty period, a free on-site inspection is provided every six months, covering:

– Overall system operation status check; controller function and record review.

– Cylinder pressure testing and agent leakage inspection.

– Functional tests of detectors, audible/visual alarms, buttons, indicators and other peripheral devices.

– Linkage logic tests with simulated fire alarms to verify system response.

– Inspection of the relief vent, conduits, earthing and other supporting facilities.

– Issuance of a formal inspection report with operation and maintenance recommendations and rectification suggestions.

11.4 Repair and Maintenance Service

– After the warranty period, lifetime discounted maintenance is available; an annual maintenance agreement can be signed for regular on-site servicing.

– Professional services such as agent refilling, cylinder inspection and equipment replacement are provided at cost price.

– Equipment archives are established to track usage and maintenance, with advance reminders for periodic inspection and replacement.

– Genuine spare parts are supplied long-term to guarantee parts availability and avoid supply interruption risks.

11.5 Technical Support Service

– Free technical consultation is provided on system operation, fault troubleshooting, code inquiries and related matters.

– Technical solutions for system upgrades, capacity expansion and retrofit are available to meet customers’ future development needs.

– Assistance is provided for fire inspections, acceptance procedures and related work, with supporting technical documentation.

12. Training Plan

12.1 Training Objectives

The training enables the owner’s operation and maintenance management personnel to master the system’s basic principles, operating methods, routine inspection essentials and common fault handling, so they can independently perform daily management and simple fault resolution to keep the system operating normally.

12.2 Trainees

Personnel responsible for fire protection management and electrical operation and maintenance on the owner’s side; 2–3 persons recommended.

12.3 Training Content

12.3.1 Theoretical Training

– Basic principles, composition and functions of the HFC-227ea fire suppression system.

– System working sequences: the control logic of the three actuation modes — automatic, manual and mechanical emergency.

– Applicable national fire protection codes and work-safety management requirements.

– Routine inspection content and precautions.

– Identification of common faults and simple handling methods.

– Safety operating rules and emergency response procedures.

12.3.2 Hands-On Skills Training

– Gas extinguishing controller operation: menu use, status viewing, history record query, auto/manual switching and reset operations.

– On-site device identification: recognition and inspection of detectors, audible/visual alarms, buttons, discharge indicators and the relief vent.

– Simulated operations: simulated fire alarm tests, emergency start/stop demonstrations and hands-on practice.

– Routine inspection practice: pressure gauge reading, equipment appearance inspection and circuit inspection methods.

– Demonstration of mechanical emergency operation and explanation of precautions.

12.4 Training Methods

– On-site training: at project acceptance and handover, a technical engineer provides face-to-face theoretical explanation plus hands-on demonstrations, with trainees practicing on the actual equipment.

– Documentation training: paper and electronic copies of the system operation manual, maintenance manual and training courseware are provided for later reference and study.

– Online Q&A: follow-up questions can be raised at any time by phone or messaging applications for remote guidance.

12.5 Training Schedule

Training is scheduled after system commissioning and before acceptance, lasting about 1 working day — half a day of theory and half a day of hands-on practice — flexibly adjustable to the owner’s timetable.

12.6 Assessment

Upon completion of training, the training effect is verified through theoretical questioning plus hands-on assessment to ensure trainees master the core operating skills; the system is handed over only after the assessment is passed.

Technical Design Solution

13. Anonymous Typical Project Scenarios

All scenarios below are anonymous, generalized examples for reference. They do not refer to any real customer, project address or testimonial.

13.1 Scenario A — Data Center Battery Room Gas Fire Suppression Project

– Project overview: an enterprise data center with two battery rooms, each approximately 6 m × 3 m, requiring fire protection for UPS supporting battery banks.

– Solution configuration: one 120 L cabinet-type HFC-227ea extinguishing unit per room, with fire alarm control system, automatic pressure relief vents and associated equipment.

– Implementation outcome: the system has operated stably and provided early warnings of battery overheating hazards on multiple occasions; it passed fire acceptance on the first attempt and received strong recognition from the customer.

13.2 Scenario B — Substation Power Distribution Room HFC-227ea Fire Suppression Project

– Project overview: high-voltage power distribution room and battery room of a utility substation, with a total area of approximately 120 m², requiring a clean-agent gas fire suppression system.

– Solution configuration: multiple cabinet-type HFC-227ea extinguishing units arranged for combined protection with zone-based control, integrated with the fire linkage control system.

– Implementation outcome: the system met the fire protection standards of the power industry, operated reliably, and passed dual acceptance by the power authority and the fire authority.

13.3 Scenario C — Industrial Energy Storage Battery Compartment Fire Protection Project

– Project overview: an outdoor energy storage battery compartment at an industrial plant, housing a lithium battery energy storage system and requiring an automatic fire suppression system.

– Solution configuration: a customized cabinet-type HFC-227ea extinguishing unit adapted to the outdoor compartment environment, with a combined heat + smoke + combustible gas detection alarm arrangement.

– Implementation outcome: the system adapted well to outdoor temperature variations, delivered precise extinguishing logic, and effectively safeguarded the safe operation of the energy storage system.

13.4 Scenario D — Hospital Laboratory Precision Equipment Room Fire Protection Project

– Project overview: a precision instrument equipment room in the laboratory department of a tertiary hospital, containing a large amount of high-end laboratory equipment and requiring residue-free extinguishing.

– Solution configuration: a cabinet-type HFC-227ea fire suppression system with a precision-type fire detection system.

– Implementation outcome: the system provided clean extinguishing with no damage to equipment, satisfied the hospital’s fire safety requirements and passed fire acceptance.

14. SEO Optimization

14.1 Keyword Classification

– Core keywords: cabinet HFC-227ea fire suppression system; battery room HFC-227ea fire suppression; non-piped (pre-engineered) HFC-227ea extinguishing unit.

– High-intent long-tail keywords: 3m×7m battery room fire protection design; 150L cabinet HFC-227ea system configuration and budget; battery room gas fire suppression system design; cabinet HFC-227ea configuration list.

– Industry traffic keywords: HFC-227ea fire suppression system design standard; clean agent fire suppression for electrical fires; data center fire protection system selection; pre-engineered HFC-227ea extinguishing units.

– Geographic keywords: Guangzhou clean agent fire suppression supplier; Guangdong battery room fire protection systems; China HFC-227ea fire suppression manufacturer.

– Brand keywords: Guangzhou Lain HFC-227ea systems; KITOZER fire suppression solutions; Lain intelligent fire protection engineering.

– Related search terms: cabinet versus piped HFC-227ea systems — key differences; HFC-227ea agent quantity calculation; which fire suppression system for battery rooms; cabinet HFC-227ea installation requirements.

14.2 SEO Tag Recommendations

– Title tag (suggested): 3m×7m Battery Room Cabinet-Type Non-Piped HFC-227ea Fire Suppression System – Technical Design Solution | Guangzhou Lain

– Meta description (suggested): A complete technical design solution for a 3m×7m battery room cabinet-type non-piped HFC-227ea fire suppression system, covering design basis, configuration and reference budget, product specifications, construction schedule and after-sales service — suitable for clean-agent fire protection of battery rooms, power distribution rooms and similar electrical environments.

– H1 tag: 3m×7m Battery Room Cabinet-Type Non-Piped HFC-227ea Fire Suppression System – Technical Design Solution

– H2 structure (suggested): Project Overview; System Design; Recommended Configuration and Reference Budget; Product Technical Specifications; Core Advantages; Construction Organization; After-Sales Service.

– Internal-link anchor text (suggested): “cabinet HFC-227ea fire suppression system”, “battery room HFC-227ea fire protection design”, “data center clean agent fire suppression”, “KITOZER fire protection products” — used naturally within related pages rather than repeated mechanically.

15. Official Contact Information

– Company: Guangzhou Lain Intelligent System Development Co., Ltd.

– Website: https://gdlain.com

– Phone: +86 139 2228 9957 / +86 185 2066 8845

– Address: No. 5 Huashan Road, Shilou Town, Panyu District, Guangzhou, Guangdong, China

Shopping Cart